by SumGui » Tue Nov 12, 2013 2:02 pm
So, here is what my mind comes up with using the great reference Seasick found:
The "CVM refit Project" on USS Oriskany gets underway (is funded) in FY82. Using 12 months of plans and 24 of refit, that would take her out to approximately October 1984. I assume there would be about 12 months in delays in the entire process, meaning she recommissions in October 1985.
I would see SPS-48 and 49, maybe with SPN-43 unless Mk23 TAS can be used as an approach radar (probably can). During her refit, I'd see Phalanx come available, so she recommissions with Sea Sparrow and Phalanx.
The refit gives '15 years' of life to her, and she recommissions with an air wing of 24 A-4M, 8-12 OA-4M and a 4 helo ASW/SAR detachment. Her primary role is providing close air support to an amphibious assault, her secondary role is what we might today call 'Littoral Strike Warfare'. Her magazines would primarily be rockets, 500lb bombs and cluster bombs. Maverick and Sidewinder would also be included.
The Marines support her, as she is essentially their carrier, and the ship will allow larger CVNs to concentrate on other missions, and stay farther from the coastline in the high-threat scenario of a forced amphibious landing.
Once she recommissions her A-4 wing would only last until the early 1990s, I'm going to say 1992, when there were large draw downs, leading to the elimination of the A-4 as a 'front line' asset.
Instead of maintaining/refitting the A-4s, by the early 1990s the AV-8B Night attack and Plus models are coming on line, so her airwing get replaced with AV-8Bs and OV-10Ds. This allows the steam catapults and arresting gear to be decommissioned and removed, reducing the crew requirement and potentially adding night capability the A-4s did not have. This allows her to be an easy recipient of cross decked AV-8Bs in an ARG, which would be desirable because of the de-confliction of rotor and fixed wing operations on the LHA/LHDs. When a CVM is in an ARG, the LH becomes a rotor platform, the CVM the fixed wing aviation platform.
The rationalization of airwing with other deployed USMC assets (cheaper than maintaining A-4s at sea for just this asset), combined with good material condition due to recent refit and lowering of crew requirements (due to elimination of the catapults and arresting gear) allows her to survive the 1990's cuts, living on until roughly the year 2000, where further draw downs and what is essentially the elimination of steam from the Navy finally calls her pier side for the final time. One does wonder if there would be any interest in foreign purchase at that time.
It also possible that she gets used as a MCS in the way the Inchon was, or with a doubling of the ASW Helo detachment and 20 or so AV-8B Plus (with APG-65 and AIM-120) you have a reasonable Sea Control Ship/Escort Carrier as well.
Other SCB-125 ships which could have been involved include:
CV-38 USS Shangri-La (last commissioned 1971, not scrapped until 1988)
CV-31 USS Bon Homme Richard (last commissioned 1971, not scrapped until 1992)
CV-20 USS Bennington (last commissioned 1970, not scrapped until 1994)
CV-12 USS Hornet (last commissioned 1970, Museum Ship 1998)
The M in the CVM designation can be assumed to mean "Medium", or "Multi-role" (after 1992), but the crew and airwing know it really stands for "Marine".
For this What-If CVM program, I assume CV-34 is first, with CV-38 following (commissions in 1987), and CV-31 and CV-20 refits cancelled due to the time frame when they would be expected in service against the expected arrival of the Wasp class LHD, which was supposed to have improved aviation handling to take much of this role. CV-12 was never really considered for the program, and becomes a museum in 1998 just like the real world.
So that is a gross SWAG on how my mind is working to fit in this What-If somewhat logically. It may fit with me destroying Pascagoula (delaying the in-service date of the Ticonderoga Class) by massive storm leading to the need to refit the USS Chicago and other older vessels to fill the gap against an aggressive USSR (who invades not only Afghanistan but Iran for oil)...any excuse to rebuild old ships....
Anybody got a 1/700 SCB-125?
So, here is what my mind comes up with using the great reference Seasick found:
The "CVM refit Project" on USS Oriskany gets underway (is funded) in FY82. Using 12 months of plans and 24 of refit, that would take her out to approximately October 1984. I assume there would be about 12 months in delays in the entire process, meaning she recommissions in October 1985.
I would see SPS-48 and 49, maybe with SPN-43 unless Mk23 TAS can be used as an approach radar (probably can). During her refit, I'd see Phalanx come available, so she recommissions with Sea Sparrow and Phalanx.
The refit gives '15 years' of life to her, and she recommissions with an air wing of 24 A-4M, 8-12 OA-4M and a 4 helo ASW/SAR detachment. Her primary role is providing close air support to an amphibious assault, her secondary role is what we might today call 'Littoral Strike Warfare'. Her magazines would primarily be rockets, 500lb bombs and cluster bombs. Maverick and Sidewinder would also be included.
The Marines support her, as she is essentially their carrier, and the ship will allow larger CVNs to concentrate on other missions, and stay farther from the coastline in the high-threat scenario of a forced amphibious landing.
Once she recommissions her A-4 wing would only last until the early 1990s, I'm going to say 1992, when there were large draw downs, leading to the elimination of the A-4 as a 'front line' asset.
Instead of maintaining/refitting the A-4s, by the early 1990s the AV-8B Night attack and Plus models are coming on line, so her airwing get replaced with AV-8Bs and OV-10Ds. This allows the steam catapults and arresting gear to be decommissioned and removed, reducing the crew requirement and potentially adding night capability the A-4s did not have. This allows her to be an easy recipient of cross decked AV-8Bs in an ARG, which would be desirable because of the de-confliction of rotor and fixed wing operations on the LHA/LHDs. When a CVM is in an ARG, the LH becomes a rotor platform, the CVM the fixed wing aviation platform.
The rationalization of airwing with other deployed USMC assets (cheaper than maintaining A-4s at sea for just this asset), combined with good material condition due to recent refit and lowering of crew requirements (due to elimination of the catapults and arresting gear) allows her to survive the 1990's cuts, living on until roughly the year 2000, where further draw downs and what is essentially the elimination of steam from the Navy finally calls her pier side for the final time. One does wonder if there would be any interest in foreign purchase at that time.
It also possible that she gets used as a MCS in the way the Inchon was, or with a doubling of the ASW Helo detachment and 20 or so AV-8B Plus (with APG-65 and AIM-120) you have a reasonable Sea Control Ship/Escort Carrier as well.
Other SCB-125 ships which could have been involved include:
CV-38 USS Shangri-La (last commissioned 1971, not scrapped until 1988)
CV-31 USS Bon Homme Richard (last commissioned 1971, not scrapped until 1992)
CV-20 USS Bennington (last commissioned 1970, not scrapped until 1994)
CV-12 USS Hornet (last commissioned 1970, Museum Ship 1998)
The M in the CVM designation can be assumed to mean "Medium", or "Multi-role" (after 1992), but the crew and airwing know it really stands for "Marine".
For this What-If CVM program, I assume CV-34 is first, with CV-38 following (commissions in 1987), and CV-31 and CV-20 refits cancelled due to the time frame when they would be expected in service against the expected arrival of the Wasp class LHD, which was supposed to have improved aviation handling to take much of this role. CV-12 was never really considered for the program, and becomes a museum in 1998 just like the real world.
So that is a gross SWAG on how my mind is working to fit in this What-If somewhat logically. It may fit with me destroying Pascagoula (delaying the in-service date of the Ticonderoga Class) by massive storm leading to the need to refit the USS Chicago and other older vessels to fill the gap against an aggressive USSR (who invades not only Afghanistan but Iran for oil)...any excuse to rebuild old ships....
Anybody got a 1/700 SCB-125?