Entering the home stretch, I think. Suffered a major disaster last night. Whilst placing the crew, I bumped the mainmast. I had already completed the rigging, and the tension of the heat shrunken, stretched sprue cables caused the bridge to separate itself from the bridge wings. So, I have to redo some rigging.
Anyway, on to some pics. They're not very good, and a lot of flaws are showing up, unfortunately.
A bow shot. Because I was converting the Z-39 into the older Z-32 I had to make some changes. I had to remove the forward portion of the combination degaussing cable and spray strake and move the degaussing cable so that it followed the lines of the foc'sle. I used some silk thread I had laying around then coated it with thinned PVA. It's all but invisible The earlier strake is still visible, unfortunately. I hope to hide that with water and spray. You can see some crew manning the 2cm single behind the forward turret.
The bridge, manned by a lot of guys looking through Binoculars. Barely visible are a couple of fellas in the crow's nest, one watching port, the other starboard.
This is the AA and secondary director around the after funnel. The Northstar US boxing tournament set provided me with a couple of guys in poses that I could use for guys looking through the optics. The guns are manned, but the crews are watching the action. Facing Canadian cruisers, the reach of their 2cm and 3.7cm fall a bit short. Z-39 originally had a lot of 3.7cm automatics here. But due to the conversion, I was able to use the excess single 2cm guns that came with the kit. I built the after searchlight platform from resin and leftover kit parts. An additional searchlight was another bonus. Z-39 had a radar here.
The after main battery. One gun isn't able to train on the action due to the after deck house. The other two are waiting to fire. I think next time, I'll try to get some guys into the gun shields
before I mount them to the deck. High res photo's show everything.
A combined shot of the after half of the ship from the other side. Just more exposure for the crew, really. Poor guys had nowhere to hide amidst shell splinters and icy waters.
A full length shot from above. My water base is sitting on a block of old pine I found in the shed. There is still a lot of work to do on the water, and a bit (actually tons) of prettying up to do on the railing. Railing really frustrates me at this point. But I really wanted to get this done so I can move on to another project.
I haven't really weathered the hull. I'm still at odds to do so. There'll be a lot of water splashing around, and she was just hours out of port.
Entering the home stretch, I think. Suffered a major disaster last night. Whilst placing the crew, I bumped the mainmast. I had already completed the rigging, and the tension of the heat shrunken, stretched sprue cables caused the bridge to separate itself from the bridge wings. So, I have to redo some rigging.
Anyway, on to some pics. They're not very good, and a lot of flaws are showing up, unfortunately.
A bow shot. Because I was converting the Z-39 into the older Z-32 I had to make some changes. I had to remove the forward portion of the combination degaussing cable and spray strake and move the degaussing cable so that it followed the lines of the foc'sle. I used some silk thread I had laying around then coated it with thinned PVA. It's all but invisible The earlier strake is still visible, unfortunately. I hope to hide that with water and spray. You can see some crew manning the 2cm single behind the forward turret.
[img]http://i1288.photobucket.com/albums/b485/GazzaShive/homestretchbow_zpsc16aca7f.jpg[/img]
The bridge, manned by a lot of guys looking through Binoculars. Barely visible are a couple of fellas in the crow's nest, one watching port, the other starboard.
[img]http://i1288.photobucket.com/albums/b485/GazzaShive/homestretchbridgeport_zps564c46e1.jpg[/img]
This is the AA and secondary director around the after funnel. The Northstar US boxing tournament set provided me with a couple of guys in poses that I could use for guys looking through the optics. The guns are manned, but the crews are watching the action. Facing Canadian cruisers, the reach of their 2cm and 3.7cm fall a bit short. Z-39 originally had a lot of 3.7cm automatics here. But due to the conversion, I was able to use the excess single 2cm guns that came with the kit. I built the after searchlight platform from resin and leftover kit parts. An additional searchlight was another bonus. Z-39 had a radar here.
[img]http://i1288.photobucket.com/albums/b485/GazzaShive/homestretchafterfunnel_zpsb35587d5.jpg[/img]
The after main battery. One gun isn't able to train on the action due to the after deck house. The other two are waiting to fire. I think next time, I'll try to get some guys into the gun shields [u]before[/u] I mount them to the deck. High res photo's show everything.
[img]http://i1288.photobucket.com/albums/b485/GazzaShive/homestretchafterbattery_zps4194cf1d.jpg[/img]
A combined shot of the after half of the ship from the other side. Just more exposure for the crew, really. Poor guys had nowhere to hide amidst shell splinters and icy waters.
[img]http://i1288.photobucket.com/albums/b485/GazzaShive/homestretchporthalf_zps29a0e27d.jpg[/img]
A full length shot from above. My water base is sitting on a block of old pine I found in the shed. There is still a lot of work to do on the water, and a bit (actually tons) of prettying up to do on the railing. Railing really frustrates me at this point. But I really wanted to get this done so I can move on to another project.
[img]http://i1288.photobucket.com/albums/b485/GazzaShive/homestretchone_zps9254381d.jpg[/img]
I haven't really weathered the hull. I'm still at odds to do so. There'll be a lot of water splashing around, and she was just hours out of port.