by medicmike » Mon Feb 05, 2018 11:52 am
I finished up scratch building the new main mast. I did it with styrene rod of different sizes (2mm, 1mm, 0.5mm) plus some styrene sheet. I added some spare PE for the platforms and made the radar mounts from styrene rod. I also began adding more of the main deck railings this weekend but forgot to grab pics of those. Here are the pics of the mast construction and I should have additional pics of the hull and such in a couple days.
I finished up scratch building the new main mast. I did it with styrene rod of different sizes (2mm, 1mm, 0.5mm) plus some styrene sheet. I added some spare PE for the platforms and made the radar mounts from styrene rod. I also began adding more of the main deck railings this weekend but forgot to grab pics of those. Here are the pics of the mast construction and I should have additional pics of the hull and such in a couple days.
[attachment=7]Roberts (48).jpg[/attachment]
[attachment=6]Roberts (49).jpg[/attachment]
[attachment=5]Roberts (50).jpg[/attachment]
[attachment=4]Roberts (51).jpg[/attachment]
[attachment=3]Roberts (52).jpg[/attachment]
[attachment=2]Roberts (53).jpg[/attachment]
[attachment=1]Roberts (54).jpg[/attachment]
[attachment=0]Roberts (55).jpg[/attachment]