by MrTsquare » Sun Oct 04, 2020 9:04 pm
Tangling with some on the same issues. Currently working on the FF-1073. Looking at many pictures of the gig and p-boats for the class its obvious that the gig and the p-boat when stored should not extend past the sides of the ship. As the kit models them and their davits, they both hang outboard. Spending much time trying to modify the davits so that both the gig and pboat are inboard. Not easy.
On my kit, at least, I was able to fit the boats onto the davits after white-glueing the davits in place, letting the white glue set up a bit, drilling out the little mounting holes on the boats a little and the coaxing the davits to fit the boats.
Should probably put the PE railings in place after the davits are glued and set in place and then install the boats as one of the last items before completion.
Just my take.
T2
Tangling with some on the same issues. Currently working on the FF-1073. Looking at many pictures of the gig and p-boats for the class its obvious that the gig and the p-boat when stored should not extend past the sides of the ship. As the kit models them and their davits, they both hang outboard. Spending much time trying to modify the davits so that both the gig and pboat are inboard. Not easy.
On my kit, at least, I was able to fit the boats onto the davits after white-glueing the davits in place, letting the white glue set up a bit, drilling out the little mounting holes on the boats a little and the coaxing the davits to fit the boats.
Should probably put the PE railings in place after the davits are glued and set in place and then install the boats as one of the last items before completion.
Just my take.
T2