by Haijun watcher » Sat Jul 10, 2021 6:22 am
Seems all 3 future frigate types will have more upcoming hull numbers:
UK Defence Journal
More frigates to be built in Scotland
By
George Allison -
April 28, 2021 147
Share
In addition to 8 Type 26 Frigates and 5 Type 31 Frigates, Scottish shipyards will also be building an unspecified number of Type 32 Frigates.
Ben Wallace, the Defence Secretary, recently stated that Rosyth would be building Tytpe 32 Frigates in addition to Type 31 Frigates.
�We are committed to building the Type 26 in the United Kingdom; it is under construction on the Clyde. In Rosyth, work is ongoing to build the facility needed to build the Type 31s and the subsequent Type 32s. He also knows that I recently recategorised the future Fleet Solid Support ship as a warship. I intend to make sure that, if not entirely, there is a considerable degree of UK build in that process, subject to tender. I have to be cautious about the contract, because the competition is to begin soon�very soon.�
(...SNIPPED)
Seems all 3 future frigate types will have more upcoming hull numbers:
[url=https://ukdefencejournal.org.uk/more-frigates-to-be-built-in-scotland/?fbclid=IwAR1Od0viT6D7iL_V4mvH_pgXKMbN4dsYkjvCtJ-YlSO93eHspj5bRXatbs0]UK Defence Journal[/url]
[quote][b][size=200]More frigates to be built in Scotland[/size][/b]
By
George Allison -
April 28, 2021 147
Share
[b][u]In addition to 8 Type 26 Frigates and 5 Type 31 Frigates, Scottish shipyards will also be building an unspecified number of Type 32 Frigates.[/u][/b]
Ben Wallace, the Defence Secretary, recently stated that Rosyth would be building Tytpe 32 Frigates in addition to Type 31 Frigates.
�We are committed to building the Type 26 in the United Kingdom; it is under construction on the Clyde. In Rosyth, work is ongoing to build the facility needed to build the Type 31s and the subsequent Type 32s. He also knows that I recently recategorised the future Fleet Solid Support ship as a warship. I intend to make sure that, if not entirely, there is a considerable degree of UK build in that process, subject to tender. I have to be cautious about the contract, because the competition is to begin soon�very soon.�
(...SNIPPED)[/quote]