The Ship Model Forum

The Ship Modelers Source
It is currently Tue Apr 23, 2024 6:33 am

All times are UTC - 6 hours [ DST ]




Post new topic Reply to topic  [ 1 post ] 
Author Message
PostPosted: Sun Aug 06, 2017 8:22 pm 
Offline
User avatar

Joined: Wed Nov 27, 2013 7:06 am
Posts: 3154
Location: Vancouver, Canada
National Interest

Quote:
Why the U.S. Navy Stopped Building the 'F-22 Raptor' of Submarines
Kyle Mizokami

August 5, 2017

This formidable increase in performance came at formidable increase in cost. The total Seawolf program was estimated at $33 billion for twelve submarines, an unacceptable cost considering the Soviet Union—and the threat of the Akula and follow-on subs—ended in 1991. The program was trimmed to just three submarines that cost $7.3 billion.

The Seawolf-class submarines were envisioned as the best submarines ever built. Designed to succeed the Los Angeles–class attack submarines and maintain America’s edge in the underwater domain, the class suffered from cost overruns and the collapse of the Soviet Union. While still some of the best submarines ever built, they were built at reduced numbers. In many respects, they are the F-22 of submarines: widely considered the world's best, but costs made wide their wide usage a major challenge.

(...SNIPPED)

_________________
"Haijun" means "navy" in Mandarin Chinese.

"You have enemies? Good. It means you stood up for something in your life."- Winston Churchill


Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 1 post ] 

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 19 guests


You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
Powered by phpBB® Forum Software © phpBB Group