The Ship Model Forum

The Ship Modelers Source
It is currently Tue Apr 16, 2024 3:04 pm

All times are UTC - 6 hours [ DST ]




Post new topic Reply to topic  [ 167 posts ]  Go to page Previous  1 ... 5, 6, 7, 8, 9  Next
Author Message
PostPosted: Wed Jan 06, 2010 3:36 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Image

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Wed Jan 06, 2010 4:02 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Image

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Wed Jan 06, 2010 4:30 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 54

Fore Yard Truss Pendants

Along with the knave line this is a bit of complicated arrangement.Each tie around the yard carries both a small loop and a long running end. These long ends are each led around behind the mast,through one loop of the knave line strop,through the loop of the opposite yard tie,and down towards the deck with a double block tied in the end.A single becket block is tied to the relevent deck eyebolt.The blocks are connected in a luff tackle and the fall is tied off to a cleat on the fore side of the mast.The trusses are of 8" rope,the blocks 11" and the connecting lanyard is 3" rope.

Hack P70

Long P240 fig 171.this is an excelent diagram of this arrangement.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Wed Jan 06, 2010 4:47 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 55

Fore Knave Line

The truss pendants have been run through the loop ends of a short strop behind the mast.Tie a length of 2" rope to the center of the strop,lead it through the 7" block attached to the rear center of the fore top.

Hack P 70

Long P241

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Wed Jan 06, 2010 6:48 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Please note: It is around step 53 that the decision will have to be made as to how much rigging will be shown on the yards.Blocks for the bunts,leeches and clew lines are optional for harbor rig.I showed them on my model because I just like lots of rigging,I even put on the jewel blocks for the stunsail gear.Some of this could be put on later but I would recommend rigging the yards as completely as possible, now that they are easily accessible.



Step 56

The Slings

The lower end of the yard slings could also go on at this time.See page 240 figure 170 in Longridge,Hackney unfortunately shows the sling as one continuous rope which is incorrect.The sling is in two parts upper and lower with thimbles lashed together by a 3 1/2" laniard.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Wed Jan 06, 2010 8:02 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 57 (the slings cont...)

The upper part of the sling is made from 12" cable with an eye spliced in one end.It has a long leg and a short leg,the short leg has the spliced eye.T.It then comes down to reeve through the eye of the short leg.The long leg passes over the cap where is lies on a bolster and then comes down to reeve through the eye of the short leg and is seiezed there with three lashings.

Long P239 -40. Fig 170.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Thu Jan 07, 2010 11:49 am 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 58

Foreyard Tackle Pendant

There are two methods for rigging these pendants.The first a method as described by Hackney is to rig them to the shrouds and is correct for harbor rig.

Tie one 7" block at the outer quarter on each side of the yard.Tie another to the foremost shroud on each side just below the futtock stave.Tie a short length of 7" rope at the yardarm with a 13" double block in the end.This line should be long enough to allow the 13" block to lie bolow the 7" block at the yard arm when it is pulled towards the shrouds.

I however used Campbell's method as described by Longridge for this as I believe that it allows for a more stable yardarm.Yardarm stability is very important as even the slightest movement when attaching the braces on one side or the other can throw out of whack all the other ropes on the yard (bunts,leeches etc...as you can see in some of my pics.)
You could overcome some of this by not having the ropes too taunt to start off with but I haven't yet figured out how to make them look good and still look like they are carrying weight (slightly bent)

Longridges description of Campbell's method is on page 242 of his book and is used more for the modelers convenience than true harbor rig.
I will diagram both methods and you can chose between the two.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:45 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 59


Forward Tackle Inner Tricing Line

Tie a 7" single block to the foremost lower shroud.Make a small loop in one end of a 2 1/2" rope.Lead the other end down through the block and tie it (temporarily)leaving the loop end loose from the shroud block.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:46 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 60

Foreyard Tackle

Take a 13" block and form a becket at one end and a hook at the other,tie a length of 3 1/2" rope to the becket.Engage the hook into the loop in the hanging end of the inner tricing line.Reeve a 3 1/2 " rope in a luff tackle between the hooked block and the double block on the end of the tackle pendant.Lead the end of the thread back above the hooked block,down through the loop in the end of the tricing line alongside the hook and tie off.The lower end of of the inner tricing line can now be permanently fixed.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:47 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Confused ? me too!
Let me explain:

Ropes 59 & 61 both run down the shrouds.The ? at the end of the yardarm is to indicate that this is where the outer end of the tricing line attaches to the yardarm pendant so that it can be pulled up to the yardarm.
The other ? shows where the inner tricing line pulls the yard tackle up towards the yardarm into a stowed position.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:49 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 62 (This is so important that I gave it a step of its own)

Foretopsail yard

Decision time! will it be harbor,furled or sail rig? If sail rig, position this yard high on the mast,if furled or harbor rig is your preference then mount it low on the mast ,almost to the level of the caps.The same is true for the other masts as well.
Decision #2 how much rigging do I want to show on these yards? should I install it all now?(recommended)

Decision #3 see Longridge P247-48.Securely pinning or gluing down things down.On the real ship there is a lot of weight on the rigging to hold things in place,on a model the yards and the lines can work themselves lose to give your model a less than ship shape look. I know because it also happened to me.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:52 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 61

Foreyard Tackle Outer Tricing Line

Tie a length of 2" rope to the tackle pendant right above the block.Pass the free end up and through the yard quarter block,across and down through the uppermost shroud block and down the shroud rope.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:54 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Image

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:56 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Image

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 12:57 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Image

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 5:18 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Image

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 5:37 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 63

Foretopsail Yard Tie Purchases

The blocks installed under the crosstrees are used for these ropes.Tie two lengths of 6" rope around the head of the topmast just above the crosstrees so that one length hangs down each side.The starboard rope is lead through one sheave of the double block on the yard, through the single block under the port side of the crosstrees and down alongside the port topmast backstay.Tye in its end a 14" double block just above the level of the lower yard.Repeat the process with the port length of rope ,leading it the opposite way and finishing with its end block hanging alongside the starboard backstay.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 5:57 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 64

Foretopsail Yard Halyards

Tie a 14" single becket block,one each side,to the eyebolts immediately aft of the eleventh deadeyes in the fore channels by short lengths of rope,so that the blocks are just above the level of the upper deadeyes.Lengths of 3 1/2" are tied to the beckets of these blocks.Reeve them to the double blocks of the tie purchases in a luff tackle.Tie the falls inside the forecastle rail .

Step 65

Foretopgallant Yard

Locate the position of the yard on the mast just above the cap and pin and glue in position.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 8:28 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Image

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
PostPosted: Fri Jan 08, 2010 8:47 pm 
Offline

Joined: Mon Oct 24, 2005 5:14 pm
Posts: 644
Location: Montreal,Canada
Step 66

Foretopgallant Tie

Lead a rope of 4 1/2" through the topgallant mast sheave and then down aft of the mast.Tie a 8" double block in its end slightly above the level of the foremast cap.


Step 67

Foretopgallant Yard Halyard

Tie a length of 3" rope to the becket of the remaining single block installed above the aft end of the foretop.Reeve this to the double block just installed on the foretopgallant tie in a luff tackle.Lead the fall through the aft hole in the foretop.

_________________
"Once upon a time......."Storyboard dioramas by JohnReid.
My photobucket
http://s6.photobucket.com/albums/y250/JohnReid/


Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 167 posts ]  Go to page Previous  1 ... 5, 6, 7, 8, 9  Next

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 6 guests


You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
Powered by phpBB® Forum Software © phpBB Group