All right, started this one. First thing I did, was opening the skylights along the hull, with a hand drill, no issues.


Then I addressed a couple issues related to the bridge and front superstructure. When looking at the bridge structure, I really didn´t like the emptiness inside, easily visible through the upper level windows. I decided to issue an interior, pure imagination, just to fill the space. used some remaining PE from other projects.


Then I opened the "tunnel" that runs under the bridge deck, issuing interior walls and some details not to leave the thing featureless. Oh and issued the antiskid areas at the end of the tunnels using Squadron Green Putty.



On the bridge, I made the openings for the two ladders that go to the command area, will install the ladders later, PE on the bridge not glued yet. This is how it looked when finishing the updates. Oh and I scribed the planking on the deck, I still don´t know how it is going to look like when painted, hope that it plays the part.

Then I corrected the issue with the triangular reinforcements of the barbettes. Trumpeter provides 8 reinforcements for each barbette, but for turrets 1 and 3, they should be 12 and in a different position, and for turret 2, although the number is correct, the position is not. In any case no reinforcement should pointing straight front-back, easy to see on this picture:

So I chiseled and sanded off the molded reinforcements, and issued new ones with plastic sheet, glued them in place following a simple pattern drawn on the barbettes (30° separation for turrets 1 and 3, and my better discretion for turret 2).


And this is the final result. Some sanding and finetuning here and there, hope it looks good.

Marco