Continued.
The two threads have different properties, the caenis thread when cut has and maintains a nice sharp end. The normal thread when cut, immediately tends to unravel, absolutely no use what-so-ever for threading through a tiny eye. To counteract this, I dip the end 15mm or so into CA. Once left to dry, when cut it then has a sharp end. If you look at the end of the thicker thread in the previous post you can see how ragged it is. The reason for the 15mm length is it allows you to cut off the point if it starts to unravel whilst rigging and then will give you a nice new point. You can just see the tiny cut-off end here -
Attachment:
End cut off.jpg [ 181.71 KiB | Viewed 1252 times ]
We now need to determine the path of the rig, obviously on the real ship, each line was an individual length, for ease of construction here, one line will form 2, 3 or more 'runs'.
The left-side rear static rig is made-up of four runs, but is made from one length of thread. Initially inserted at the rear loop of the two loops at the rear of the 'starfish', it then goes to the top mounting point, down to the lower yard-arm, then up to the lower mast mount and back down to the inner starfish loop. The two ends are then pulled tight and secured with CA.
Attachment:
One side - one length.jpg [ 180.06 KiB | Viewed 1252 times ]
The right-side rear was completed as above.
Attachment:
Rear completed, cut off needed.jpg [ 193.95 KiB | Viewed 1252 times ]
And here you can see the loops glued to the rear of the yard.
Attachment:
Pontos loops.jpg [ 177.18 KiB | Viewed 1252 times ]
That's the rear completed, now for the front.
Just the same, determine a route for the longest run that you can, and again this one starts at the front leg of the starfish, goes up to the lower mount, as seen here -
Attachment:
Starting the front.jpg [ 180.1 KiB | Viewed 1252 times ]
The thread is then passed around the mast and through the other side of the mount, down to the right-hand side of the 'fish, through the second hole, then back up to the top mount, around the mast again, and back down to the open loop remaining, back where you started.
Attachment:
Static rig completed.jpg [ 192.4 KiB | Viewed 1252 times ]
The entire static rig of the fore-mast has now been completed with three, yes THREE, individual lengths of thread.
Now for some detail. One of the experiments I carried out was to represent the block and tackle on the rigging.
I tried small dabs of paint, a tiny drop of PVA glue dotted on, left to dry and then painted black. I then tried a mix of PVA, black paint and water. This ultimately was the easiest to use and gave an acceptable block!
Here is a close-up of the top mount with blocks painted on -
Attachment:
Block & tackle.jpg [ 185.9 KiB | Viewed 1252 times ]
And here is a view of the loops ready for the signal lanyards to be attached to once the mast is permanently attached to the model.
Attachment:
Side view of NS Loops.jpg [ 184.01 KiB | Viewed 1252 times ]
I think I have fulfilled my initial remit, it was pre-planned by attaching the loops in the right places during construction, by studying the path of the thread, it was relatively easy to pass the three lengths through the right loops and it took about two hours to do, and a fair amount of that time was dedicated to clearing out one of the holes which had been blocked by paint.
Here are the completed views front and rear -
Attachment:
Overall front view.jpg [ 190.73 KiB | Viewed 1252 times ]
Attachment:
Overall rear view.jpg [ 193.09 KiB | Viewed 1252 times ]
I know that your model will be different from this one, but I think this simplifies what some see as an onerous task. It was really enjoyable and has given me a great deal of satisfaction.
I hope this helps just one modeller complete their rigging without stress or strain.
If you have any comments or can see a way of making this even simpler, let me know.
Thanks for taking the time to look at the thread.
Cheers, Jabb