I'd definitely be interested in such drawings. I'll have to check out that CD Mark mentioned.

_________________
-Abram


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 12:36 pm 
Offline
User avatar

Joined: Wed Nov 17, 2010 10:51 am
Posts: 382
Location: S.C.
Abram, it's a good CD,..just got my copy on Monday and it will be a good reference tool

What I'm having problems obtaining are photos and drawings of the Mare Island early 42 refit . Most major structures are the same as what she had on 7 Dec 41,...but there are/ were various changes made such as Gun shields,...boat arrangement, Radar,..gun tubs added around the main mast and a large square/rectangle platform/tower with Air Defense 20 mm's built up around the STACK.
NavSource and the CD have a few pics of these changes , but nothing in great detail.
Hopefully I can find drawings of these changes but so far I have turned up nothing ...could be they no longer exist or that they are looked away some place in an obscure vault forgotten about after all these years.....

If anyone has suggestions on that I'm open for it.

Hank@ Yes that would be great if you could do that!

Mark@ If Stephen could get the drawings and dimensions of the "clover leaf" for a printed subject, I'm sure would be a great benefit...the rest as far as height and spread could then logically be worked out from that. That is if You and He are open to it.

Mark


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 3:42 pm 
Offline
Model Monkey
Model Monkey

Joined: Sat Aug 20, 2005 9:27 pm
Posts: 3952
Location: USA
I'm game. I can design a 3D printed cloverleaf from Chesley's drawings and Mark's experience with the kit.

Normally, 2D drawings of a quality that at least matches Booklet of General Plans drawings are needed to make a quality 3D design. But we just don't have anything more authoritative at present.

Surely, the Pennsy experts here can come to a "best consensus" on a cloverleaf design for the 1/200 kit. I'll produce that.

Rescaling to 1/350 and 1/700 from that design can be problematic for some modelers. A part that fits one kit in one scale then rescaled for other kits is likely to have to be adapted by the 1/350 and 1/700 modeler to fit well.

_________________
Have fun, Monkey around.™

-Steve L.

Complete catalog: - https://www.model-monkey.com/
Follow Model Monkey® on Facebook: - https://www.facebook.com/modelmonkeybookandhobby


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 4:25 pm 
Offline
User avatar

Joined: Mon Oct 13, 2014 5:39 pm
Posts: 668
Location: San Tan Valley Arizona
Okay folks:

A few more updates. In order for the cranes and the legs to fit on the main deck, the raised locator tabs for the cranes need to be filed off and locator holes drilled for the legs next to the kingposts as on the actual ship.

Image

Here you can see the kingpost on the right and the leg of the mainmast: Not the locator holes for the kingposts have to made larger to accept the larger Pennsylvania Kingposts. I added Plastruct around the parts and filled in the holes where the Arizona mast legs would go.

Image

Here you get an idea of how it will look and fit on the actual model.

Image

Image

Some adjustment will be made but for now, I am happy with how it is and I can proceed with PE, locator tabs, paint and then put aside to dry.

_________________
Mark
Master Gunnery Sergeant USMC (Ret.)
http://www.modelshipgallery.com/gallery ... index.html

On the bench:

1/200 USS Enterprise, CV-6


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 6:14 pm 
Offline
User avatar

Joined: Mon Nov 18, 2013 3:41 pm
Posts: 2927
Location: Mocksville, NC
Mark,

Really looking good! I think your approach to this conversion is working well.

I'll email both you and Steve re. the Main Mast stuff.

Hank

_________________
HMS III
Mocksville, NC
BB62 vet 68-69

Builder's yard:
USS STODDARD (DD-566) 66-68 1:144, Various Lg Scale FC Directors
Finished:
USS NEW JERSEY (BB-62) 67-69 1:200
USN Sloop/Ship PEACOCK (1813) 1:48
ROYAL CAROLINE (1748) 1:47
AVS (1768) 1:48


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 6:38 pm 
Offline
User avatar

Joined: Mon May 14, 2012 12:18 pm
Posts: 2068
Location: Salt Lake City, USA
Oh yeah, looking very good so far Mark!

I know I shouldn't be one to talk when it comes to spending too much on builds but damn, that Pennsy looks expensive already! :joker:

_________________
-Jason Channell

Current Project: 1/200 Bismarck


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 6:53 pm 
Offline
User avatar

Joined: Mon Nov 18, 2013 3:41 pm
Posts: 2927
Location: Mocksville, NC
Channell wrote:
Quote:
I know I shouldn't be one to talk when it comes to spending too much on builds but damn, that Pennsy looks expensive already!

Looks ARE deceiving, it's way past "expensive" :cry_3: ....but all things are relative. :big_grin:

I have a list, but never bothered adding it up :big_eyes:

Hank

_________________
HMS III
Mocksville, NC
BB62 vet 68-69

Builder's yard:
USS STODDARD (DD-566) 66-68 1:144, Various Lg Scale FC Directors
Finished:
USS NEW JERSEY (BB-62) 67-69 1:200
USN Sloop/Ship PEACOCK (1813) 1:48
ROYAL CAROLINE (1748) 1:47
AVS (1768) 1:48


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 7:58 pm 
Offline
User avatar

Joined: Mon Oct 13, 2014 5:39 pm
Posts: 668
Location: San Tan Valley Arizona
Channell wrote:
Oh yeah, looking very good so far Mark!

I know I shouldn't be one to talk when it comes to spending too much on builds but damn, that Pennsy looks expensive already! :joker:


It hasn't quite reached the "Tehnoart" Indianapolis.........................Yet! :heh:

_________________
Mark
Master Gunnery Sergeant USMC (Ret.)
http://www.modelshipgallery.com/gallery ... index.html

On the bench:

1/200 USS Enterprise, CV-6


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 7:59 pm 
Offline
User avatar

Joined: Mon Oct 13, 2014 5:39 pm
Posts: 668
Location: San Tan Valley Arizona
BB62vet wrote:
Mark,

Really looking good! I think your approach to this conversion is working well.

I'll email both you and Steve re. the Main Mast stuff.

Hank

Thanks Hank:

It's coming along at a nice pace. A little tweaking and I will be ready for paint and to move on.

_________________
Mark
Master Gunnery Sergeant USMC (Ret.)
http://www.modelshipgallery.com/gallery ... index.html

On the bench:

1/200 USS Enterprise, CV-6


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 8:43 pm 
Offline
User avatar

Joined: Mon May 14, 2012 12:18 pm
Posts: 2068
Location: Salt Lake City, USA
Mgunns wrote:
Channell wrote:
It hasn't quite reached the "Tehnoart" Indianapolis.........................Yet! :heh:


...and I'm not done collecting for it either. Race ya to bankruptcy? It worked for countries in the 30's-40's... well, a couple of 'em, anyway. :rolf_3:

_________________
-Jason Channell

Current Project: 1/200 Bismarck


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 8:53 pm 
Offline
User avatar

Joined: Mon May 14, 2012 12:18 pm
Posts: 2068
Location: Salt Lake City, USA
BB62vet wrote:
Channell wrote:
Quote:
I know I shouldn't be one to talk when it comes to spending too much on builds but damn, that Pennsy looks expensive already!

Looks ARE deceiving, it's way past "expensive" :cry_3: ....but all things are relative. :big_grin:

I have a list, but never bothered adding it up :big_eyes:

Hank


Yeah... the way I figure it, big builds should be counted not by the total $$$ spent on a single ship but by the "smiles per hour" ( or is it hours of smiles?) you get from it. Looks like you guys will not be short-changed in the end! :big_grin:

_________________
-Jason Channell

Current Project: 1/200 Bismarck


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 01, 2016 10:07 pm 
Offline
User avatar

Joined: Mon Nov 18, 2013 3:41 pm
Posts: 2927
Location: Mocksville, NC
Channell wrote:
Quote:
Yeah... the way I figure it, big builds should be counted not by the total $$$ spent on a single ship but by the "smiles per hour" ( or is it hours of smiles?) you get from it. Looks like you guys will not be short-changed in the end! :big_grin:

Well, Jason - count yourself amongst us - your various 1/200 builds will someday (as will ours) come full circle.

Hank

_________________
HMS III
Mocksville, NC
BB62 vet 68-69

Builder's yard:
USS STODDARD (DD-566) 66-68 1:144, Various Lg Scale FC Directors
Finished:
USS NEW JERSEY (BB-62) 67-69 1:200
USN Sloop/Ship PEACOCK (1813) 1:48
ROYAL CAROLINE (1748) 1:47
AVS (1768) 1:48


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sat Apr 02, 2016 6:54 am 
Offline

Joined: Tue Jan 11, 2005 10:56 am
Posts: 8560
Location: New York City
Great work on that mainmast.


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 08, 2016 8:30 pm 
Offline
User avatar

Joined: Mon Oct 13, 2014 5:39 pm
Posts: 668
Location: San Tan Valley Arizona
Thanks Dan for stopping by, checking it out and your comments, duly appreciated.

Okay, not a lot of "excitement" but a lot of progress. I am in the final throes of getting this "cursed" main mast together. It has been a struggle, I am not very accomplished at scratchbuiding and this main mast has been a challenge. If the alignment is off a hair, it throes everything off, so a lot of re-doing the platforms not to mention the photo etch railings. I am pretty happy with it now. I have added the platform supports to both platforms using the Eduard PE for the 1/200 Arizona and matching as close as possible to the supports in the drawing. For the edging and railings on the triangular platform I used the Eduard Railings as it has that triangular gusset on the end. I had to do some splicing as the platform is smaller than AZ. For the cloverleaf platform, I used the Kit provided PE for the edge and the railings. I like it better than the Eduard as it is more pliable and I can drill holes through the holes for the eyelets to run the rigging through.
Image

I used the kit provided searchight motor access platforms and added railings on the open sides.

Image

All I have left to for the platforms is add an access hole for the ladder from the cloverleaf platform to the next level up platform and the platforms will be done. It all aligns pretty darned good when placed on the model. I have to work on the top, paint and move on to the more pedestrian side of the build which should move along quite good.

Image

A little tweaking here and there and it's ready.

Thanks for looking.

_________________
Mark
Master Gunnery Sergeant USMC (Ret.)
http://www.modelshipgallery.com/gallery ... index.html

On the bench:

1/200 USS Enterprise, CV-6


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Fri Apr 08, 2016 8:55 pm 
Offline
User avatar

Joined: Sat Jan 08, 2005 7:29 pm
Posts: 1284
Location: Tempe, Arizona
Excellent work Mark, I always enjoy your updates.

_________________
-Abram


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sat Apr 09, 2016 3:10 pm 
Offline
User avatar

Joined: Mon Nov 18, 2013 3:41 pm
Posts: 2927
Location: Mocksville, NC
Mark,

OUTSTANDING, my friend!!! Thanks also for pointing out which of the PE sheets work best for this modification.

As I've got the CAD drawing pretty well underway, it is amazing to see how close we are on the layout of the platforms without knowing it. I'm glad you are leading the way on this as it will help me later when I get to this part of my build. Even using the 1935 PENNSY Chesley plans to go by, they are still somewhat vague in details of the lower platforms hidden by those above. Before I closed out the CAD file Friday, I had just laid out the Searchlight Platform on the Elevation drawing and while mine will reflect a somewhat earlier period, the basic shape is the same. I hope to have something to print (and post) perhaps next weekend when I'm able to access the forum again. Of course, this drawing will have to be rectified with your templates as I'm quite sure the model is not 100% interchangeable with the plans (if it IS, I will be very surprised!).

I also discovered I had already on hand the Eduard PE sets #4 & #6 (Main Top & Superstructure) when this order came in this week, but that's ok - I'm sure the parts will come in handy.

It will really be interesting to see the entire mast all together as one unit.

Hank

_________________
HMS III
Mocksville, NC
BB62 vet 68-69

Builder's yard:
USS STODDARD (DD-566) 66-68 1:144, Various Lg Scale FC Directors
Finished:
USS NEW JERSEY (BB-62) 67-69 1:200
USN Sloop/Ship PEACOCK (1813) 1:48
ROYAL CAROLINE (1748) 1:47
AVS (1768) 1:48


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sun Apr 10, 2016 7:30 am 
Offline
User avatar

Joined: Wed Nov 17, 2010 10:51 am
Posts: 382
Location: S.C.
Coming along nicely Mark. And I agree with Hank, can't wait to see the mast completed.


PS has Bob's Buckles moved his web site?.....when I open his link it claims the domain is closed, site no longer available


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Sun Apr 10, 2016 12:53 pm 
Offline
User avatar

Joined: Mon Oct 13, 2014 5:39 pm
Posts: 668
Location: San Tan Valley Arizona
Thanks Hank and Mark for checking it out. It is almost completed and I will post some pictures when it is all painted and finished.

I just checked the Bob's Buckles site and it worked for me: http://www.bobsbuckles.co.uk/

Let me know

_________________
Mark
Master Gunnery Sergeant USMC (Ret.)
http://www.modelshipgallery.com/gallery ... index.html

On the bench:

1/200 USS Enterprise, CV-6


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Apr 11, 2016 7:49 pm 
Offline
User avatar

Joined: Mon Oct 13, 2014 5:39 pm
Posts: 668
Location: San Tan Valley Arizona
Okay Folks:

Another update before I head into the usual stuff like boats, airplanes etc. I am calling the main mast finished except for more rigging and the ladders on each of the forelegs of the tripod as I don't want to deal with those when I am handling the mast to fix to the model.

I put the railings off the Eduard set for the mainmast on the upper triangular platform, the ladder and the opening safety railings. Due to the Pennsylvania structure being different I had to trim a little on each side of the triangular platform railings as the mating surface was narrower. The Arizona has a smaller platform above this one, haply, Pennsylvania doesn't. I made a mast/antenna out of a piece of brass rod and stiff wire, Bob's Buckles eyelets and tubes for the support structure and a piece of red streched sprue for the top aircraft warning light. The kit provided one was close and I was going to use it, but; I was challenged (read shamed) :heh: by Chuck Bauer to attempt to duplicate the real one, so I did, I am pleased with the results.

Image

Image

I am not sure if the Pennsylvania had 4 or 3 .50's in the bird bath, so I went with the kit provided 4, I like the semitry of the four guns and the four lockers. I had a hatch off a spare GMM PE fret and used it for the entrance hatch to the Bird Bath.

Hank Strub, BB62VET, sent me some ladder rungs with a drilling template so I used those for the rungs on the main top. I also used some Plastruct for the corner supports of the top. For the Netting I used the appropriate pieces off the MKI set I got for the Arizona, they look pretty decent. The yards at the aft corners of the top that the kit provides are wrong, so I used stiff wire bent to the approximate angel and Gaspatch 1/48 Turnbuckles for the support turnbuckles. I think it looks rather convincing. Pennsylvania did retain the aft range clock during the time frame I am depicting which is about August 1941. For the aft antenna spreader supports I used the appropriate kit parts, when set, I drilled a hole, inserted an eyelet and rigged the supports using the MODELKASTEN .03MM Flexible line available from "Sprue Brothers."

Image

Image

The ladders I used were from the Eduard set for the mainmast and spares. I used Gator Grip Thick glue for attaching all the PE. I really like the stuff, it is strong but flexible and forgiving. If you bump a piece of PE, and who hasn't? The PE doesn't fly off, it stays put. I use CA glue for attaching the eyelets and the rigging once it run through the tube.

Image

This was one tough structure to "scratch build." I am neither a draftsman nor an engineer and it took me quite a lot of trial and error to get it to this point. There is still some error, but; I am happy with it and I want to move on. I think once it is fixed to the model and the model is done it will look just fine.
One last note. The paint I am using for the 5-L Light Grey is a mixture I made using Tamiya Acrylics as recommended for the 3D superstructure. I sprayed some of it and some of the Colour Coats 5-L and it is a perfect match. I was quite pleased with that result as well.

Thanks for looking and checking out the build.

_________________
Mark
Master Gunnery Sergeant USMC (Ret.)
http://www.modelshipgallery.com/gallery ... index.html

On the bench:

1/200 USS Enterprise, CV-6


Report this post
Top
 Profile  
Reply with quote  
PostPosted: Mon Apr 11, 2016 8:23 pm 
Offline
User avatar

Joined: Sat Jan 08, 2005 7:29 pm
Posts: 1284
Location: Tempe, Arizona
Excellent work! I never noticed how different the main mast was from the Arizona's. I always assumed they were the same. Your build is inspiring and a great help for me on mine. Hopefully after this pay day I'll have a little money in my model fund to buy some odds and ends I need to continue on my build. Keep up the great work, your build is one of my main references :thumbs_up_1:

_________________
-Abram


Report this post
Top
 Profile  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 196 posts ]  Go to page Previous  1, 2, 3, 4, 5, 6 ... 10  Next

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 9 guests


You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
Powered by phpBB® Forum Software © phpBB Group