Re: 1/144 Kiev by Dave Wooley
Posted: Mon Feb 22, 2010 6:02 am
At last I�m onto the finishing details plus a few mistakes along the way!!.
The first of these, up forward between the SA-N-12 launcher tubes involved
the D/F aerial and the fittings around the deck housing. This involved making
up 4 electrical distribution boxes which had 3 cables feeding out from beneath each box

Using styrene to form the distribution boxes

There are a small number of fittings for the deck housing which included 2 W/T
doors, drain off out lets and piping and as mentioned the D/F mast.

The DF mast was made up using a combination of .45mm brass wire for the
main vertical struts and .31 for the cross members . First task was to draw
out the basic frame , the loop atop of the mast required a slightly different
approach . All the components where cut and married up to the drawing on
the soldering board . As is my usual practice these where all taped down before soldering.

First an application of flux followed by soldering the joints with a temperature
controlled iron. Unfortunately I made an error in judgment. I realized after
examining a different picture of the D/F mast that it is in fact a tripod. So I made
one frame to many. None the less the process continued.

Once the soldering was completed the CORRECT part was removed for cleaning.
It is important to clean down all the soldered joints, and then wash down the job
is a mild detergent.

All the relevant part laid out ready to be set into place. The two rings visible
above the D/F mast where from my scrap box and used just for assessing size.

The next job was to form the loop. This was in fact a straight forward process
The loop was initially formed by rolling a length of very malleable copper wire
around a styrene tube

As there are two loops and in order that they fit to the upper part of the mast ,
each loop was divided into two and soldered to the centre dipole .

The end result is a D/F loop

All the parts assembled into place

The deck housing temporarily fitted into place on Kiev .All that�s required is
an air brush over and another job is finished. A few more to go yet?
Dave Wooley more to come

The first of these, up forward between the SA-N-12 launcher tubes involved
the D/F aerial and the fittings around the deck housing. This involved making
up 4 electrical distribution boxes which had 3 cables feeding out from beneath each box

Using styrene to form the distribution boxes

There are a small number of fittings for the deck housing which included 2 W/T
doors, drain off out lets and piping and as mentioned the D/F mast.

The DF mast was made up using a combination of .45mm brass wire for the
main vertical struts and .31 for the cross members . First task was to draw
out the basic frame , the loop atop of the mast required a slightly different
approach . All the components where cut and married up to the drawing on
the soldering board . As is my usual practice these where all taped down before soldering.

First an application of flux followed by soldering the joints with a temperature
controlled iron. Unfortunately I made an error in judgment. I realized after
examining a different picture of the D/F mast that it is in fact a tripod. So I made
one frame to many. None the less the process continued.

Once the soldering was completed the CORRECT part was removed for cleaning.
It is important to clean down all the soldered joints, and then wash down the job
is a mild detergent.

All the relevant part laid out ready to be set into place. The two rings visible
above the D/F mast where from my scrap box and used just for assessing size.

The next job was to form the loop. This was in fact a straight forward process
The loop was initially formed by rolling a length of very malleable copper wire
around a styrene tube

As there are two loops and in order that they fit to the upper part of the mast ,
each loop was divided into two and soldered to the centre dipole .

The end result is a D/F loop

All the parts assembled into place

The deck housing temporarily fitted into place on Kiev .All that�s required is
an air brush over and another job is finished. A few more to go yet?
Dave Wooley more to come
. 