Page 8 of 52
Re: APA project
Posted: Sun May 10, 2020 2:27 pm
by Fliger747
Rudder, stern post and prop added. APA clutter not onboard at the moment.
Re: APA project
Posted: Sun May 10, 2020 8:19 pm
by Fliger747
Closer view of the stern without deckhouse and armament clutter.
Re: APA project
Posted: Sun May 10, 2020 8:31 pm
by BB62vet
Really looking good, Tom!!! That is a different way to paint the rudder - but, it does seem appropriate. Coming along nicely!
Hank
Re: APA project
Posted: Sun May 10, 2020 9:18 pm
by Fliger747
I did find a photo of the prop being removed in dry dock and I think, will check it again, that it was two toned. Today soldered up a couple of short pipe rails, replaced one pipe rail and both inclined ladders on the fantail. If I make a (or two) accommodation ladders I will have to make a lot longer jig. Can't currently find the present jig anyway.
Amazing what a draft difference there is between loaded and empty on these ships. The ones in the bone yard up the Sacramento River look like they are drawing only about 6 feet!
Glued the aft deck house down.
Any Machinist Mates around that know what bending slab looks like? There is apparently one next to the aft deckhouse, where the engine and machine shop is located.
Hit 87 at the house today!
Looked at the Rudder/Prop photo, one really couldn't tell, looked shipyard sandblasted grimy.
Re: APA project
Posted: Wed May 13, 2020 2:28 pm
by leanderf69@gmail.com
Keep the very good work going Tom... this project is indeed mesmerising... I will follow it through to its completion .... I love the clutter of USN amphibious ships especially the APA's and AKA's of that era.
Regards from Malta
Noel Paris
Re: APA project
Posted: Wed May 13, 2020 2:54 pm
by Fliger747
Thank you Noel!
Malta is one of those place that I have flown over, but not had a chance to explore. If there is a square inch of deck space on this one, I have forgotten some item! Today I am working on the Whelan Davits for the LCVP's. I almost wonder, with so much deck equipment as to where there was room for the troops to muster for debarkation.
Not looking forward to rigging!
Cheers: Tom
Re: APA project
Posted: Fri May 15, 2020 9:00 pm
by Fliger747
Nice weather, so cool mornings and late evenings I do a little ship work. Been making the deck cradles for the LCVP's out of heavy Strathmore paper and punching lightening holes with a variable sized leather punch. When I look at photos of WWII ships I am amazed by the gear and equipment stored everywhere. Something that I haven't decided on as yet, the scrambling nets, deploy these over the side or not? Stowed they were tightly rolled next to the gunnel.
Enjoy sunshine if you have it!
Re: APA project
Posted: Sat May 16, 2020 2:52 pm
by Guest
Fliger747 wrote:Thank you Noel!
Malta is one of those place that I have flown over, but not had a chance to explore. If there is a square inch of deck space on this one, I have forgotten some item! Today I am working on the Whelan Davits for the LCVP's. I almost wonder, with so much deck equipment as to where there was room for the troops to muster for debarkation.
Not looking forward to rigging!
Cheers: Tom
Malta is a small island but very rich in history. USN amphibious ships from the 6th Fleet regularly visited our port of Valletta and recall, during my childhood, going onboard the APA Telfair. I felt like I was in jungle of steel wire rope with all the surrounding rigging hqanging from the masts to the derricks and davits - it sure is a big challenge but am sure will be a rewarding one once you complete the model. Good luck - will keep looking for your progress posts, Tom.
Kind regards
Noel
Re: APA project
Posted: Sun May 17, 2020 4:50 pm
by Fliger747
See the empty spaces abeam hatch five? Space to fill up with fueling hoses and 2 50' LCM's
A lot to do here, everything still stacked loosely in place awaiting some decisions on when to rig and what's in the way currently.
Typical in dry dock shipyard clutter with lats of stuff sitting dock side to add to the top weight!
Re: APA project
Posted: Mon May 18, 2020 2:27 pm
by leanderf69@gmail.com
Hi Tom,
The real detail and clutter of this type of transport is excellently represented - those whelan davits are just awesome. Looking forward to seeing the LCVP's hanging out from those davits. Keep the good work coming.
Kind regards
Noel
Re: APA project
Posted: Mon May 18, 2020 3:43 pm
by Fliger747
Though the davits could hold two LCVP's, one in the cradle and the other hanging, I will just have an LCVP in the cradle at each one. At the #1 hatch two were at deck level and there was a removable cradle to nest two more above, I will just have the two at deck level. It's still lot of LCVP's!
I still go back and look for screen shots to take from "Away All Boats" as I look for details. The Aftermast had a number of guy wires and I still have to figure out their number and configuration. The Foremast had as far as I can tell had only two. The Aftmast had to be able to pick up the very heavy LCM's.
Cheers: Tom
Re: APA project
Posted: Tue May 19, 2020 11:34 am
by leanderf69@gmail.com
Hi Tom
If my memory serves me well, same class of APA's had 3 LCVP's under each of the 4 whelan davits: one stacked on another and one hanging under the davits' hooks outboard.
Will check on pictures I have regarding the number of guy wires on the aft mast for you and revert.
Happy modelling
Noel
Re: APA project
Posted: Tue May 19, 2020 1:54 pm
by Fliger747
I think I have seen two LCVP's stacked and extra one hanging outboard in the davit. I'm scratch building all the LCVP's so 15 or however many I have is plenty! I want the model to be somewhat visible under the pile of LCVP's!
The aft mast has I think six guys, two ganged to a bracket next to the bulkhead of the aft well deck on each side and one each side attached to a padeye on the deck forward. There may or may not be two more outboard.
Just aft of the bridge wing is a stack of rafts inclined at an angle, there has to be some sort of pipe rack for these but I haven't seen any photos of one.
Cheers! T.
Re: APA project
Posted: Wed May 20, 2020 10:49 am
by leanderf69@gmail.com
Hi Tom
Can you e-mail me to my username so that I send you a few pictures I have that may assist on the guys. I am unable to post to the Forum.
Kind regards
Noel
Re: APA project
Posted: Thu May 21, 2020 2:11 pm
by Cadman
Your username is "Noel PARIS"
Email me if you need to reset password. My email is on
this page.
leanderf69@gmail.com wrote:Hi Tom
Can you e-mail me to my username so that I send you a few pictures I have that may assist on the guys. I am unable to post to the Forum.
Kind regards
Noel
Re: APA project
Posted: Sun May 24, 2020 3:21 pm
by Fliger747
Current progress: Added side arched bulkheads below the bridge wings, some Davit supports, more rafts. The wooden small dowel is just to hold the Davit legs in place before glueing. Pilot house and upper deck/stack will sit on top here, note locating blocks.
The angled racks for rafts behind the bridge wings were constructed from photos kindly supplied by Noel Paris.
Re: APA project
Posted: Mon May 25, 2020 3:18 pm
by Fliger747
Question for anyone who might know! The "P Boat" usually sat on the number 4 hatch with two LCVP's nested in cradles on either side. How did the P Boat sit on on top of the hatch? Similar boats have sat on the aft deck of battleships on a wheeled dolly. Was something like this used to hold the P boat and then set aside when the #4 hatch was accessed?
Thanks! Tom
Re: APA project
Posted: Mon May 25, 2020 8:36 pm
by Fliger747
View from about 650' (scale) feet. One can see how the ship starts to disappear under a pile of boats and whatnot. For full LCVP compliment I would need another six boats! Most of the stuff is just piled on there for now, but you get the idea.
Re: APA project
Posted: Tue Jun 02, 2020 7:32 pm
by Fliger747
These are fairly small, a pad eye to attach a main mast/Kingpost to the deck, with shackles, and turnbuckle. The main mast has as far as I can tell eight guys. Some ships maybe had more (10) or fewer.
Re: APA project
Posted: Wed Jun 03, 2020 12:50 am
by DrPR
Very nice detail!
Phil