Page 9 of 103

Posted: Wed Mar 28, 2007 11:13 am
by Dave Wooley
Hi Torpedo Although only 1:144 Kiev is 1m 850mm in length and makes for a big model. At 1:100 it would be well over 2m . To big for me.
Dave Wooley

Posted: Thu Mar 29, 2007 8:40 am
by Jose Chaica
Don�t forget to put some weight on the opposite side of the bridge, to counter-balance the weight you�re applying on the hull (right side). It might not be much, but it might make some difference...
Otherwise, I�m really enjoying your build... :thumbs_up_1: :thumbs_up_1:

:cool_1: .

Posted: Thu Mar 29, 2007 10:03 am
by Sylvain Auger
Very nice build so far Dave! What is the tool you used to cut out the square openings on the superstructure? Would a tool like that enable me to cut square openings in smaller scale like 1/350 up to 1/700? It might come in handy to be able to cut openings in decks to fit inclined ladders on some model. Normaly I leave out those details because I can't cut the openings with the tools I have.

Looking forward to you next update!

Cheers from sunny but chilly Canada :wave_1:

Posted: Thu Mar 29, 2007 4:34 pm
by Dave Wooley
jmchaica wrote:Don�t forget to put some weight on the opposite side of the bridge, to counter-balance the weight you�re applying on the hull (right side). It might not be much, but it might make some difference...
Otherwise, I�m really enjoying your build... :thumbs_up_1: :thumbs_up_1:

:cool_1: .
You are quite right . Although the weight at present isn't that much it may well make a difference later on . I'm with Ron on the 15th of April and I'll have the Kiev there for ballasting trials. and launch day . I just hope it doesn't take to much weight to get it down to its marks but I'll soon find out. :surfer: :eyebrows:
DaveWooley

Posted: Thu Mar 29, 2007 4:40 pm
by ARH
We will be escoting it out of the area, back to Russia, :lol_3: :lol_3: :wave_1: :thumbs_up_1:

Posted: Thu Mar 29, 2007 5:51 pm
by Dave Wooley
Sylvain Auger wrote:Very nice build so far Dave! What is the tool you used to cut out the square openings on the superstructure? Would a tool like that enable me to cut square openings in smaller scale like 1/350 up to 1/700? It might come in handy to be able to cut openings in decks to fit inclined ladders on some model. Normaly I leave out those details because I can't cut the openings with the tools I have.

Looking forward to you next update!

Cheers from sunny but chilly Canada :wave_1:
Hi Sylvain Auger here is the blade I use for cutting
out the openings on Kiev . Its a "Swan Morton"
surgical blade . and very sharp but only for a short period.
. As for using this type of blade for other scales.
Yes I guess it would be just as effective. But the
styrene used for Kiev is relatively soft. :thumbs_up_1:
Image
Dave Wooley

Posted: Thu Mar 29, 2007 5:55 pm
by Dave Wooley
ARH wrote:We will be escorting it out of the area, back to Russia, :lol_3: :lol_3: :wave_1: :thumbs_up_1:
Ron It's a long way back up the canal to St Petersburg. :shipcaptain:
:lol_1:
Dave Wooley

Posted: Thu Mar 29, 2007 11:18 pm
by TommyL
Hey Dave,

I missed the first stages of this build but I have to say WOW! This looks like a very ambitious project.

Hm...........hope I spelled that right. Don't see it underlined with red so maybe its good.

Gah!

TommyL.

Dave's Kiev

Posted: Fri Mar 30, 2007 2:27 am
by H.A. Baker
Escort? Torpedo!

An extremely fiddly frustrating complicated piece of superstructure there, probably designed by a Gulag inmate high on meths. I wouldn't tackle it Dave, you're a better man than I Gunga Dinn.

HAB

Posted: Fri Mar 30, 2007 3:08 am
by Neptune
Hello Dave,
I've checked several of my books and data and figured out the Kievs had two Ka-25 "Hormone-C" SAR helicopters along with 2 guidance helicopters and 10-12 ASW helicopters (these were altered from Ka-25 in the beginning to Ka-27 later on). The Ka-27 SAR version was only ready by 1982, which means the carriers were at sea for a while by then, using the Ka-25 version for SAR. I guess it depends on which timeframe you want to present her. The SAR versions of the Ka-25 had the red and white line along their fuselage.

Posted: Fri Mar 30, 2007 5:25 am
by Dave Wooley
Thank Roel that's just the information I need . Now I can focus on a time frame. Although a little into the future I think It may be useful to look at the pennet numbers and settle for a time line on the fleet deplyment area , Another question. Was the overall paint scheme used for Kiev when deployed with the Northern Fleet dark grey . Thanks again for all your help :thumbs_up_1:
Dave Wooley

Posted: Sat Mar 31, 2007 3:17 am
by Neptune
I don't think they used the dark colour they are using now. In most pictures it seems lighter, although it depends on light conditions too. I guess with the dark northern environment that it often looked that dark. The radomes weren't painted in light grey as they are now, so I guess it's a totally different painting scheme.

Posted: Mon Apr 02, 2007 1:50 pm
by Dave Wooley
The next stage of the preliminary work on the superstructure is to build the SA-N-3 launcher platform which in sited just forward of the bridge and the after deck housing which will support the after SA-N-3 launcher and 76.2mm twin mounting
This picture shows the underside of the SA-N-3 platform and the supports
Image
SA-N-3 launcher platform in place
Image
In board view of the SA-N-3 platform. Deflectors that surround the platform will be shown in a later part of the build .
Image
Here the sides for the after platforms for the after SA-N-3 launcher and 76.2mm twin are lifted from the plan and cut to size.
Image
The sides are prepared to accept the lower 76.2mm platform.
Image
The lower platform in place. Note the markings for the upper platform
Image
Splayed sides in place to support the upper platform. This platform feeds beneath the main superstructure and will be locked in with pins but will also be removable .
Image
Tidying up beneath the after bridge platform
Image
. All the main superstructures prepared and slotted into place
Image

After superstructure in place. Note that the sides around the main superstructure are slightly wider as per photos of Kiev.
Image
Next the forward SUW-N-1 deck housing, RBU ASW rocket launcher base and the raised base for the "Trap Door" radar , right forward
Dave Wooley

Posted: Mon Apr 02, 2007 4:15 pm
by ARH
Dave , Another master class, its really taking shape now, looking good. :jump_1: :woo_hoo: :woo_hoo: :thumbs_up_1:

Posted: Mon Apr 02, 2007 5:13 pm
by Laurent
Hi all ,

yes , indeed , impressive build here ! ( even if I don't like "plastics" ) :thumbs_up_1:

Regards ,

Laurent

Like them images of your model

Posted: Tue Apr 03, 2007 3:58 am
by ozpirate
You have some great imags there mate.
I hope this weekend to see my friends in Wagga that are building the Novorossiysk and when I do I shall post you some more images.
Do you have and close ups of some of the weapons or sensors yet? This is where you are really going to have fun.
Keep the images comming....

Re: Like them images of your model

Posted: Tue Apr 03, 2007 4:13 am
by Dave Wooley
ozpirate wrote:You have some great imags there mate.
I hope this weekend to see my friends in Wagga that are building the Novorossiysk and when I do I shall post you some more images.
Do you have and close ups of some of the weapons or sensors yet? This is where you are really going to have fun.
Keep the images comming....
That would be superb. Your last images of Novorossiysk help me enormously to get my head around some of the methodology of the build. The radars such as "Top Sail" and "HeadLight" arrays proved to be "tricky to build for Moskva but it's never going to be any more strightforward for Kiev.
Dave Wooley

Posted: Fri Apr 13, 2007 7:13 pm
by Dave Wooley
The next stage is to constuct the forward deck housings . the first being for the 76.2mm mounting and SUW-N-1 launcher.
Image
Image
Locating pins are inserted to the underside to ensure that the exact position is maintained during the build.
Image
The forward "Trap Door" radar housing.
Image
Once again pins are made use of.
Image

Locating pins are also used for the SA-N-3 deck housing
Image
And for the after superstucture supporting the SA-N-3 launcher and after 76.2 mounting.
Image
All the main superstructures and larger deck housings positioned
Image
Kiev being made ready for ballasting trials , More on this and Sundays launch /motor trials on Monday.
Image

ready??

Posted: Fri Apr 13, 2007 8:06 pm
by Tony Bunch
Hi Guys,
Hi Dave,
Ready for some "on the water" shots?
Looking good!
Tony B

Posted: Sat Apr 14, 2007 1:54 am
by Torpedo
Impressive. I wonder what the picture will be, if you hand it over to the russian commanding officer... :lol_1: