HI folks
the work on the hangar ,have advanced at small steps .....(I was preparing to my trip for Telford ,I would be with my Richelieu 50-52)
to start the pieces that will form the walls of the Hangar
[url="http://s1176.photobucket.com/user/yaum/media/rd337_zps5b630e08.jpg.html"]

[/url]
the construction of the hangar in reality was simple, a metal frame and between metal frames, of the masonry. So I had to engraved the beams (it is not very explicit about the picture ) and openings correspond to the sliding door open or ajar.
the hangar under contruction
[url="http://s1176.photobucket.com/user/yaum/media/rd338_zps75981948.jpg.html"]

[/url]
I added of stiffeners and stuck a false roof , also for reasons of rigidity.
the walls equipped with sliding doors and maneuvering rails
[url="http://s1176.photobucket.com/user/yaum/media/rd342_zpsd9d44f96.jpg.html"]

[/url]
[url="http://s1176.photobucket.com/user/yaum/media/rd341_zps699ca5a1.jpg.html"]

[/url]
architectural oddity , some sliding doors often on the inner ? ?
and finally a close-up view of one side
[url="http://s1176.photobucket.com/user/yaum/media/rd339_zps9ac60f0f.jpg.html"]

[/url]
remains at detailed all doors and I can begin the roof and the metal structure present Under the awning
I hope not too your bored with these "small steps"
cheers
Nicolas