Page 17 of 103
Re: Dave's Kiev
Posted: Sun Jan 20, 2008 4:54 pm
by Neptune
FINALLY A NEW PICTURE!!!!
Dave, did you receive my email last week?
Those radars are looking very good, care to share how you made them?
Re: Dave's Kiev
Posted: Mon Jan 21, 2008 6:25 am
by Dave Wooley
Neptune wrote:FINALLY A NEW PICTURE!!!!
Dave, did you receive my email last week?
Those radars are looking very good, care to share how you made them?
Hi Roel Yes I did and I did reply. Thanks for your comments and thanks for the occasional nudge to get my self into gear and do a few posts. Regarding the build sequence go back to the previous page it shows it all there.
Dave Wooley More to follow but keep the big stick ready

Re: Dave's Kiev
Posted: Mon Jan 21, 2008 9:17 am
by Neptune
Hmm, seems that I have missed your reply... Didn't receive anything.
Ah, I see, I failed to check your last page after my return. Greatly illustrated, I'm sure it'll be a great help for my future build!

Re: Dave's Kiev
Posted: Mon Jan 21, 2008 9:37 am
by gtb -red
what a master.

Re: Dave's Kiev
Posted: Tue Jan 22, 2008 3:50 pm
by Dave Wooley
Making up the numerous maintenance platforms that will be fitted either
side of the �Side Globe� ECM domes was time consuming .These are clustered
up the side of the superstructure as this picture of Kiev shows.

Each platform is cut to size and their positions on the side of the
superstructure marked

On the smaller platform the single angled support frame is off set.
Were as on the longer platform this is fixed in the centre.

Fixing the surrounds .

There are two length of platform. This shows the smaller type fitted either side of each ECM dome .

Beneath each lower ECM dome are the two extended platforms. In due course these will be fitted with rails but for now one less job to do .

Dave Wooley Next job coming up making the "FRAS 1 ASW launcher
Re: Dave's Kiev
Posted: Tue Jan 22, 2008 4:50 pm
by J. Soca
Excellent work here !!!!!

Re: Dave's Kiev
Posted: Tue Jan 22, 2008 5:18 pm
by ARH
Nice One Dave

Re: Dave's Kiev
Posted: Tue Jan 22, 2008 9:39 pm
by desron48
very inspiring dave......

...joe
Re: Dave's Kiev
Posted: Tue Jan 22, 2008 9:44 pm
by desron48
what you use for balls dave....lol..

....joe
Re: Dave's Kiev
Posted: Wed Jan 23, 2008 3:54 am
by Andy G
Crikey! Neat & excellent work as ever, Dave.
Andy
Re: Dave's Kiev
Posted: Wed Jan 23, 2008 5:02 am
by Dave Wooley
desron48 wrote:what you use for balls dave....lol..

....joe
These are formed using layers of 2.5mm styrene built up , cut and shaped .{ I'll show how this was done} Once again life would have been much easier if I'd set to and moulded the lot .Yet surprisingly once started the process didn't take that long and I quite enjoy , in a perverce way making work! Also thanks for all your comments much appriciated.

Dave Wooley
Re: Dave's Kiev
Posted: Wed Jan 23, 2008 6:30 am
by Bluehawk
Hi Dave!
Outstanding exellent work!
But can you tell me, how you doing the rings for the cable tracked up to the Top Sail radar array??
And by the way, what material do you use as surrounds for the platform??
Martin
Re: Dave's Kiev
Posted: Wed Jan 23, 2008 10:23 am
by Dave Wooley
Bluehawk wrote:Hi Dave!
Outstanding exellent work!
But can you tell me, how you doing the rings for the cable tracked up to the Top Sail radar array??
And by the way, what material do you use as surrounds for the platform??
Martin
Hi Martin The cable do you mean the arms that supports the lower section of the large array . The brass wire used was 0.5mm and 0.31mm With each brass stabilizing sail 0.25mm in thickness . The upper platform is formed from 1mm styrene. Thanks for asking .
Dave Wooley
Re: Dave's Kiev
Posted: Wed Jan 23, 2008 11:13 am
by Dave Wooley
When building Moskva I used a frame for the Top Sail
covered in fine mesh.

Moskva under construction with the Top Sail in place.

Dave Wooley
Re: Dave's Kiev
Posted: Fri Jan 25, 2008 6:14 pm
by Jefgte
Re: Dave's Kiev
Posted: Fri Jan 25, 2008 7:05 pm
by Dave Wooley
Thank you Jef, much appreicated
Dave Wooley
Re: Dave's Kiev
Posted: Fri Jan 25, 2008 11:31 pm
by nick
Re: Dave's Kiev
Posted: Sat Jan 26, 2008 12:47 pm
by Dave Wooley
Each part of the FRAS-1 launcher was cut to size and made ready to
assemble almost like a kit of parts.

The arms were cut to shape and the launch rail fitted.

Holes were marked and drilled into the pillar ready to fit the treads.

A method used to ensure that each tread is the same.

The twin armed �FRAS-1� launcher known as the SUW-N-1 temporarily in place.

Dave Wooley
Re: Dave's Kiev
Posted: Sat Jan 26, 2008 2:01 pm
by ModelMonkey
Truly a masterpiece! Great idea for ensuring the rungs were evenly spaced.
Re: Dave's Kiev
Posted: Sat Jan 26, 2008 3:48 pm
by Dave Wooley
Steve Larsen wrote:Truly a masterpiece! Great idea for ensuring the rungs were evenly spaced.
Hi Steve thanks for your kind words , however I can't lay claim to the ladder spacer that method I picked up from my old friend Brian King.
Dave Wooley