Tutorial time ---------------
We have the basic barrel mounting which is Evergreen Box section .The next job , using a small �pin vice� { finger drill} is to make an opening into one end. As the barrel is to be painted separately the best idea I could come up with for securing the barrel was to insert a length of aluminium tube into the mounting onto which the barrel would fit. Ok here we go.
With an opening made for a 2mm od tube and the splay as indicated in the picture -------
Just as a reminder there is a left and right barrel mounting as there is a left and right retaining basket either side but more on that at a later stage .
The inner 2mm tube can be inserted into the box section mounting .
The outer barrel is inserted over the inner tube . This also helps when fitting the barrel support.
Progress thus far There are parts to be added to the sides of the barrel mounting.
One each out board face of the barrel mounting is a raised ,splayed section . This is formed from 1.5mm styrene sheet.
This splayed section the same height as the barrel mounting is fitted into place -------- splayed edge facing the barrel .
Fitted to the splayed section is a series of 4 strips and a small 3mm styrene disc made by using a leather punch { I have explained this device in the Kiev build a very useful tool to have in the box If you want me to explain its use please ask}
As the Kashtan is both gun and missile capable there is a series of launch tubes that can be attached to the top of the barrel mounting .
For this build the tubes do not apply however the top does. Unfortunately I have to use a little modellers licence on this one as there does not appear to be really good picture showing this part of the barrel mounting.{ as they say �sods law� will come into play and someone somewhere will unearth the pictures that shows this very spot} .But until that happens it down to modellers license
For this I have used a strip of .50 styrene to match the top of the mounting. Onto that, and fitted either side are fitted 2 lengths of �L� Evergreen section extended by 3mm . it would appear that the inboard L section is trimmed .This has not be done here?
The rear of the barrel mounting looks to be an acess point{ only an educated guess] and this was also included on the model
For the model a panel was cut and shaped to match the end of the barrel mounting.
Onto that a styrene discs was added.
Next stage was to form the bands around the barrel as shown here.
To simulate these bands I used a sticky back trim tape but to ensure the ends where firm a small amount of CA was added .
The result thus far.
Two barrel plus mounting ready to be fitted .
That�s it for now but for next time the two barrel support arms and a start on the side baskets
Dave Wooley
To be continued-----------------
