Page 3 of 4
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Fri Dec 04, 2020 2:06 pm
by Dan K
All your work is exquisite.
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Fri Dec 04, 2020 3:49 pm
by Iceman 29
Thanks for the compliments, Keith, Jacques, Dan, I can't wait to get back to this assembly.

Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Sun Dec 20, 2020 10:20 am
by prowannab
This build is absolutely amazing! I can't wait to see more!
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Tue Dec 29, 2020 3:11 am
by tjwerdel
Pascal - I'm overjoyed that your tackling this. Very nicely done. I tried doing the gallery decks and hanger in 2018 but realized it was beyond my skill in 1/350. See my post at "1/350 CV-6 Enterprise by Merit w/ Infini Pe". There may be some content in there you can use. One thing I might suggest is using 1.5 diameter magnets to hold the deck down. Much better than screws as the whole assembly clicks in place and can be totally hidden. I'm watching with interest and am re-energized to continue my build. This is a giant project as I well know. Don't burn out...press on!
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Tue Dec 29, 2020 3:51 am
by marijn van gils
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Tue Dec 29, 2020 3:50 pm
by Iceman 29
Thank you all.
In order not to exhaust myself on the subject, I have started two more...
But I will come back to this one soon to at least finish the hangar. It should go faster because since then I learned a lot about 3D drawing and 3D printing in the last few months.
Other ship projects in full 3D printing:
USS Pamanset:
viewtopic.php?f=13&t=305869
SS Nomadic :
viewtopic.php?f=13&t=311395
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Wed Mar 10, 2021 4:31 pm
by Iceman 29
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Thu Mar 11, 2021 11:18 am
by Dan K
Beautiful F4Fs.
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Tue Mar 16, 2021 4:13 pm
by Iceman 29
Thank Dan!
Since I'm stuck finishing the Nomadic's dry dock, I dive back into the Hornet's hangar.
I started the central elevator. This time 3D printing, a technique I didn't have at the time for the front elevator (made with plastic card), is going to enter the dance. It should improve the details and the speed of realization.
So I took out the plans of the CV-5 Yorktown elevator to know how to make this elevator shaft. There are two elevators like in the front and in the back, 1 main one and an auxiliary one which allows to gain surface in the hangar to park planes when the main elevator is at its post on the flight deck.
This is how I will represent it. As the complete flight deck will be removable, it will be integral. We will thus see once the flight deck removed, the auxiliary elevator parked at the level of the hangar deck. When the main elevator is in use, the auxiliary is parked on the second deck which is under the main deck (Hangar deck).
It is interesting to see that there is another rectangular elevator on the starboard side, which allows the torpedoes to be brought up to the flight deck. � You can see it well on one of the pictures. I'll have to represent it as I represented the two bomb elevators that are a little further forward.
Tonight I cut out the hangar deck, where the elevator shaft is located, so I can now draw the floor just below it, as well as the auxiliary elevator. Then print it all out in great detail. I don't have any pictures of this little elevator unfortunately, but the plans will do.
A good stroke of the Dremel and off you go!
The torpedo elevator is seen here on the left.

Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Thu Mar 18, 2021 7:26 am
by Iceman 29
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Thu Mar 18, 2021 11:10 am
by Iceman 29
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Thu Mar 18, 2021 12:22 pm
by Harpy
Some really tremendous stuff.
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Thu Mar 18, 2021 2:45 pm
by gms
Very realistic planes!
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Fri Mar 19, 2021 5:30 pm
by Iceman 29
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Sun Mar 21, 2021 10:58 am
by Iceman 29
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Sun Mar 21, 2021 12:29 pm
by JIM BAUMANN
REALLY impressive works--
I have read the thread from end to the other
and am awestruck !
also...
by how much of your scratch-building internal cleverness may only be seen in glimpses on the finished model....
Most excellent!
JIM B
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Tue Mar 23, 2021 4:27 pm
by Iceman 29
Thank Jim!
Painting the elements.
Refining the front arch of the hangar.
DavidP wrote:Pascal, I think the main part of those brackets with the 2 holes are too thick as I think they should be about 1 to 1.5" thick, not multiple inches. I did a drawing right on steel plate almost 40yrs ago for a 100' overhead crane for Dofasco & I think the plate was 1" thick.

Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Wed Mar 24, 2021 4:37 am
by Song Jung Gun
It's amazing!
Song
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Wed Mar 24, 2021 3:07 pm
by Iceman 29
Thanks Song!
But not as amazing as your long term real scratch project!
viewtopic.php?f=13&t=285272
Re: USS Hornet CV-8 Merit In 1/200 April 1942
Posted: Fri Apr 02, 2021 3:00 pm
by Iceman 29