Page 29 of 30

Re: 1/200 Scale Group Build from 2015-16

Posted: Mon Sep 12, 2016 2:48 pm
by BB62vet
Tom,

You have really done a great job on this model!!! the bloomers and boats are exceptional - they add so much! I'm really enjoying this build.

Hank

Re: 1/200 Scale Group Build from 2015-16

Posted: Fri Sep 16, 2016 12:46 am
by Fliger747
Thanks Hank!

Thanks again for all your help!

Cheers: Tom

Re: 1/200 Scale Group Build from 2015-16

Posted: Sun Dec 04, 2016 11:09 pm
by tegunn
All righty now! .....I'm back at the bench finally and taking any spare time I have to begin wrapping up my Arizona. Lately I've been focusing on the little details, touch-ups I wanted to get while I can without knocking something off my model before going further. That completed and not really worth photographing, I've started on the sea base. As a reminder I plan to mount my model waterline underway depicted about December 2nd just prior to the attack. The other items to date are the .50 cals which had to be stripped down, barrels changed out, as well as the 5"25's. I'm trying to get the main superstructure/tripod command top completed and rigged with the halyards and slowly work my way backwards and outwards. At a certain point I'll have to mount it in the base, so from there on I'll have to work over the sea diorama, which will be even a more challenge. My next subassembly will be the ship's boats(next post), wrapping up the funnel and mounting it, then finishing out the main top/tripod mast. I will keep everyone posted on the progress.

Re: 1/200 Scale Group Build from 2015-16

Posted: Sun Dec 04, 2016 11:24 pm
by Fliger747
Water cooled Ma Duce, very interesting! I'll have to read up on the water fashioning, something I have been assiduously procrastinating about for Alaska.

Look'n good!

Re: 1/200 Scale Group Build from 2015-16

Posted: Sun Dec 04, 2016 11:54 pm
by tegunn
Thanks Fliger! Good to see you are still alive!! It seems that life has taken everyone by the ba**s-not much on the build thread..
Randy

Re: 1/200 Scale Group Build from 2015-16

Posted: Wed Dec 14, 2016 11:14 pm
by Mgunns
Hi Guys:

I have been away from the forum due to moving, working full time again and getting the house in order, so checking out some of the posts.

@Tom: I concur with Hanks assessment of your build. The boats look great, I like the covered one.

@Randy: Guns look great. Looking forward to seeing more progress.

Re: 1/200 Scale Group Build from 2015-17

Posted: Fri Jan 13, 2017 6:58 pm
by tegunn
Ok, time for an update. Here's some picture I snapped before it got dark.. I've been wrapping up the main superstructure on the Arizona, taking care of ladders and other small details. The signal halyards were painted to show some grime as I didn't want to show them a monochrome color at this scale. Rarely are they bleached white and get a grey brown color. I finished my funnel and installed it. Now I move to the ship's boats and mainmast area, working aft.

Re: 1/200 Scale Group Build from 2015-17

Posted: Fri Jan 13, 2017 7:57 pm
by BB62vet
Randy,

Man, that's looking excellent!!! Good detail & paint work, I'm in awe!

Hank

Re: 1/200 Scale Group Build from 2015-17

Posted: Fri Jan 13, 2017 10:07 pm
by Mgunns
Outstanding Randy:

Paint, the light drybrushing, the uniformity of work. Absolutely outstanding work.

Re: 1/200 Scale Group Build from 2015-17

Posted: Mon Jan 16, 2017 10:13 pm
by tegunn
Thanks all! Currently wrapping up the mainmast by figuring out a technique for the six antenna wires & insulators. I believe I have a solution. I won't attach the mainmast until I mount the boats.---more mini-models! or more many mini-models...

Re: 1/200 Scale Group Build from 2015-17

Posted: Wed Feb 22, 2017 12:10 pm
by tegunn
While building the ship's boats, I broke away and modified the turret 3 catapult. It was a P4 mod1 which have a single shock absorber on the end as opposed to the doubles on the P6's..

Re: 1/200 Scale Group Build from 2015-17

Posted: Mon Feb 27, 2017 9:41 pm
by Mgunns
Hi Randy:

Catapult looks great. It's the little things that make this shine. Thanks for the tip.

Re: 1/200 Scale Group Build from 2015-17

Posted: Tue Apr 04, 2017 8:18 pm
by tegunn
Alrighty now! I've had time to work on the ship's boats finally and have them completed. I spent some time researching the correct way these were secured to the deck and have got it pretty close. For all I used spare PE chain with some turnbuckles from North Star. Cradles are Eduard, which I added a small plastic square at the bottom of each leg as the mounting plate.

Re: 1/200 Scale Group Build from 2015-17

Posted: Tue Apr 04, 2017 8:20 pm
by tegunn
Before I added the boat "stacks", I installed the aft stays on the funnel. There were more forward but it was too late to figure out where they went and mounting them.

Re: 1/200 Scale Group Build from 2015-17

Posted: Wed Apr 05, 2017 12:19 am
by Mgunns
Hey Randy: Looks like you are the sole contributor to this "Group Build." Boats look great, the time and effort to add the proper securing gear is paying dividends. They really look the business, the stays are a nice touch as well, a lot of modelers leave these off but they are an important detail.
Looking forward to the next update.

Re: 1/200 Scale Group Build from 2015-17

Posted: Wed Apr 05, 2017 12:49 am
by Fliger747
Yes! Incredible models within models!

Re: 1/200 Scale Group Build from 2015-17

Posted: Wed Apr 05, 2017 6:25 am
by BB62vet
Randy,

This is really shaping up nicely! As Fliger747 said, these models within models are real gems!

Hank

Re: 1/200 Scale Group Build from 2015-17

Posted: Wed Apr 05, 2017 2:01 pm
by Scott56
I just read this thread. The work I have seen is top notch and hope someday to be of a similar caliber. I found the portions about rigging too be very enlightening as I am ready to begin the halyards and radio antennas on my Iowa.

I look forward to seeing more progress on the groups builds.

Re: 1/200 Scale Group Build from 2015-17

Posted: Wed Apr 05, 2017 7:10 pm
by tegunn
Thanks for the comments Mark, Tom and Hank! After those little buggers I know the benefit of putting her at anchor! Currently finishing up the mainmast. It was about 90% completed so all I have to do is rig the antenna wires on the inside of the tower, add some last parts I didn't want to knock off before now, and then mount the whole assembly on the deck. Making progress!
Randy

Re: 1/200 Scale Group Build from 2015-17

Posted: Wed Apr 12, 2017 10:18 pm
by tegunn
Ok all, time for an update. I've mounted the boats between the fore and main masts and mounted the mainmast. The mainmast involves rigging the six antenna wires prior to attaching to the deck as well as deciding on the method of attachment to the trunk. Pictures are in and around the stages so far. I need to touch up some places I missed. Now I'm trying to decide on whether to attach some of the railing prior to mounting the model on the sea base.
Randy