Page 4 of 10
Re: IJN Nagara
Posted: Fri Jun 05, 2015 7:09 pm
by Dan K
What is it that's "off"?
Re: IJN Nagara
Posted: Fri Jun 05, 2015 7:11 pm
by MartinJQuinn
Frankly, I think she seems to be coming together quite nicely. Don't be so hard on yourself.
Re: IJN Nagara
Posted: Fri Jun 05, 2015 7:16 pm
by Angeliccypher
The mess left behind by the tie down rods is one thing. I am not happy with the Tamiya paints. I am so used to Valejo and Life Color and am having a hard time working with these. It is also the aspect of every flaw you are painfully aware of..... But I will persevere:)
Re: IJN Nagara
Posted: Fri Jun 05, 2015 7:17 pm
by Angeliccypher
Lol thanks Martin!
Re: IJN Nagara
Posted: Sat Jun 06, 2015 9:54 am
by Dan K
Funny, I love Tamiya paints. I guess it's what one's used to.
Sounds like the surface needs to sound down, I'm guessing. I do that all the time to clean up my "mistakes". Martin's right, persevere.
96 hours
Posted: Wed Jul 08, 2015 7:09 am
by Angeliccypher
Back from vacation. A lot of work has gone into trying to finish the funnels. Here is one small snapshot of what I have done so far. More to come. Comments are always appreciated.
Re: IJN Nagara
Posted: Wed Jul 08, 2015 3:28 pm
by LE BOSCO
very nice comeback Gabriel
cheers
nicolas
Re: IJN Nagara
Posted: Wed Jul 08, 2015 9:01 pm
by Dan K
Well put. A very nice funnel.
Re: IJN Nagara
Posted: Wed Jul 08, 2015 9:41 pm
by MartinJQuinn
Very nice work!
Re: IJN Nagara
Posted: Sat Jul 11, 2015 1:19 pm
by Angeliccypher
Thanks guys. I went to attach the first funnel and most of the PE rails popped off. So I finished attaching the funnel and now I am redoing all the PE. My goal is to get all three done this weekend with no more set backs.
99 hours and much frustration later!!!!!!
Posted: Sat Jul 11, 2015 7:05 pm
by Angeliccypher
Here is the updates. I have attached all three funnels. The PE on top is complete. That took several hours to do and accounts for most of the time spent previous to the last photo. All PE on the first funnel is done.
Here is a blown up section of the second funnel. The Flyhawk PE messed something up in the instructions I think. The area circled in yellow (I am not sure if that is a set of vent tubes or something else) runs right over the red line area which is where I am supposed to be attaching a rail per the Flyhawk instructions. But it will not sit on top of it. If anyone has any insight as to if there was even a hand rail on that line or not I would appreciate it. If so I think I will have to make some "Kustom with a K" modifications to the PE. Below that is a picture of the Flyhawk instructions. The one in question is "Funnel B".
Re: IJN Nagara
Posted: Sun Jul 12, 2015 9:25 am
by Dan K
It may be Aoshima that has erred, not FlyHawk. Not sure what that shielding is for, or even why it's there. I'll check my references.
Re: IJN Nagara
Posted: Sun Jul 12, 2015 11:27 am
by Angeliccypher
Thanks Dan
Re: IJN Nagara
Posted: Wed Jul 15, 2015 7:08 am
by Dan K
No luck on the references. It's impossible to say whether Aoshima covered this detail correctly and FlyHawk missed/ignored it, or that FlyHawk feels that Aoshima provided an extraneous, phantom, detail. Your choice.
Re: IJN Nagara
Posted: Wed Jul 15, 2015 8:43 am
by Angeliccypher
Thanks Dan. I will likely use the plastic piece and simply cut the railing to fit. But I will look through other photos of the class to double-check.
103 Hours
Posted: Sat Jul 25, 2015 5:50 pm
by Angeliccypher
Here is the corrected funnel piece done as best as my skill will handle. The middle funnel is the one in question. The handrail that is second from the bottom runs right over where I had to patch the locator piece for the part that should not have been included. This was done with the funnel already attached, so it made it substantially harder for me.
106 Hours
Posted: Sat Jul 25, 2015 5:52 pm
by Angeliccypher
AND.....I finally got all the PE on the funnels. They are done (except for the funnel stays that will come a lot later).
109 hours
Posted: Sat Jul 25, 2015 5:54 pm
by Angeliccypher
After the funnels, I tacked the walkway that connects the main deck areas above the fore torpedo tubes. I have the walkway and the four ladders attached.
111 hours
Posted: Sun Jul 26, 2015 3:54 pm
by Angeliccypher
The structures that are aft the last funnel are installed. The three main batteries as well as the catapult are installed as well.
Time to finish the main mast....I am dreading this almost as much as I am the bridge area.....
116 hours
Posted: Mon Aug 03, 2015 10:37 pm
by Angeliccypher
She is starting to come together.

- The remaining plastic parts ready to be painted

- Started to attach many of the above parts as started in on the bridge work as well
Comments are always welcome.