The rigging is done and the port side davits and whale boat are installed and rigged for sea as well as details atop the pilot house. The starboard side's davits will be empty since that whale boat had been dispatched to the aircraft in distress.
I'm still waiting for the 5" open mount guns, 20mm guns and depth charges to arrive from FreeTime Hobbies. The package is lost somewhere between UPS and USPS, apparently.
I have always dreaded having to construct the support for this gun director tower from brass stock. I worked hard to make resin parts in order to make assembling these towers a whole lot easier in the future.
About ready for some primer. I gave the whole thing a bath in Bleche-Wite with a rinse and blow dry.
I used a rather thick set of PE railings from Tom's Modelworks (#5301). I didn't realize it until I had a lot of it already glued on. I'll have to carry through with this PE on the other two ships in the diorama. I have about 4 sets of it and it's nice PE, but thicker than what I had been using in the past.