by Sauragnmon » Fri Apr 04, 2008 8:19 pm
I'm personally working in 1/700, for budget and space concerns. Sorry, I wrote it before bed, so I wasn't quite thinking straight, all the details and such. Brass Tube is an interesting idea, aside from the cutting required to fit it into the existing deck and structure construction, but I'll consider the idea.
I'm personally working in 1/700, for budget and space concerns. Sorry, I wrote it before bed, so I wasn't quite thinking straight, all the details and such. Brass Tube is an interesting idea, aside from the cutting required to fit it into the existing deck and structure construction, but I'll consider the idea.