by mwhackler » Wed Jun 10, 2015 9:18 pm
I've currently got three incomplete carrier projects. 1/700 CV-4, 6 and 7. I get the ship finished up and then hit a roadblock with the air wing. I usually switch to a destroyer or something small before trying to delve back into the aircraft. Anyway I am attempting to get my air wing for all three finished up this month and I realized that the sprues for the Ranger's air wing are gone (cleaned up my shipyard, and realized it the day after the trash runs). They are all constructed except the props. So my thought is to do "working" props on them. However I've never attempted that, and was hoping for some advice on how to do it. Thoughts?
I've currently got three incomplete carrier projects. 1/700 CV-4, 6 and 7. I get the ship finished up and then hit a roadblock with the air wing. I usually switch to a destroyer or something small before trying to delve back into the aircraft. Anyway I am attempting to get my air wing for all three finished up this month and I realized that the sprues for the Ranger's air wing are gone (cleaned up my shipyard, and realized it the day after the trash runs). They are all constructed except the props. So my thought is to do "working" props on them. However I've never attempted that, and was hoping for some advice on how to do it. Thoughts?