WIP - 1/350 USS Lexington (CV-2)
Moderators: BB62vet, MartinJQuinn, JIM BAUMANN, Jon, Dan K
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I fibbed. As I got looking at the prints more closely and looked at some other pics I have, namely one from The Lexington Class Carriers during construction, I realized the kit is wrong again and if I want it right it almost all had to come apart. I'm having computer/scanner issues so can't post the pic I'm talking of and it's not the best as someone had scanned, copied, and mailed it to me but suffice to say on the nav bridge level the supports do not go into the cabin. The cabin has slight circular indentations on each rear corner and the supports go up in that space.
Secondly the kit has all three supports meeting in a pyramid shape and they don't. The two rear supports come alongside and slightly to the rear of the center support and the center support is squared and the rear two round. So it was off to the demolition yard. Now I have to rebuild each cabin, fill any deck holes, and then rebuild.
One good side effect is I now have the 8" director platform out in the open and can work on the under bracing much easier? Grammar doesn't seem just right but you get what I mean.
James
Secondly the kit has all three supports meeting in a pyramid shape and they don't. The two rear supports come alongside and slightly to the rear of the center support and the center support is squared and the rear two round. So it was off to the demolition yard. Now I have to rebuild each cabin, fill any deck holes, and then rebuild.
One good side effect is I now have the 8" director platform out in the open and can work on the under bracing much easier? Grammar doesn't seem just right but you get what I mean.
James
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I didn't show any pics of the 8" director in the demo post but that's the first thing I went to work on. I had to fill the holes in the deck and the support. As I started to work it was plain the rails and splinter mattresses were in the way so off they went too. Then it was clean it all up and then put plugs in the holes. Then it was cut and sand them. While I've got it all apart and have accurate prints I reshaped the deck just a little and also found out I had widened it just a tad too much. It wasn't enough to justify totally rebuilding the cabin so I guess I'll live with it. Anyway enjoy.
James
James
- Jon C Ryckert
- Posts: 592
- Joined: Sat Jun 06, 2009 12:40 pm
Re: WIP - 1/350 USS Lexington (CV-2)
Look'in good James. Have you decided on how you will build the FC radar base?
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Not really sure until I see the actual stuff from WEM but I'm leaning towards filing a flat on the roof and building from there.Jon C Ryckert wrote:Look'in good James. Have you decided on how you will build the FC radar base?
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
This time around I wanted to get it right the first time and not have to fill holes and redrill. The first thing was to get a correct height on the center support. The styrene square rod I had is the correct size but rather flimsy so decided to go with square brass tube. As usual it comes in two sizes, too big and too small. The small is really small and the big is just slightly big so I went with the big. I had to make a square hole in the platform and a recess in the support for the tube to ride in. The support starts slightly to the rear of the director platform cabin. So I first sawed two lines in the support, as much as possible since the saw hits the bottom of the platform, and then clear it out with my Dremel and clean it up with a chisel. I then used this as my guide to make the hole in the platform. It worked out pretty well.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Next it was fix the nav bridge cabin and also fill the previous holes for the supports. In taking the bridge assembly apart a small piece of the forward cabin did not come off cleanly so had to use filler to fix it. Then I cut the rear section of the cabin off and started rebuilding. I extended the sides back to the correct position, cut some styrene tube in half, used those to make the recessed corners, and then added the rear wall. Some putty to fill the seams and then it was on to the drilling.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Now it was time to drill. I wanted the supports to come in the recessed corners of the nav bridge and terminate just to the rear and on either side of the center support so the first thing to do was get the center support in place. When I cut the hole in the deck I made it slightly oversize, not intentional but it will be inside the flag cabin and out of sight so not really a problem but there wasn't anything at the bottom to hold it so I made a support and glued it in. This time I cheated and took a piece of .040 flat stock out onto the back step, lined up the tube, and whacked it with a small hammer! Perfect hole!
Then I wedged the tube in the oversize hole and it was off to the races to drill. I used an undersize drill to start and then went to full size.
As I had suspected of the kit it wasn't the correct height! Once the holes were drilled and the old round supports put in place they were just a little short! No wonder I had such a time trying to get the octagonal section to fit. Now I have another trip to the hobby store for more rod to make new supports.
As I had suspected of the kit it wasn't the correct height! Once the holes were drilled and the old round supports put in place they were just a little short! No wonder I had such a time trying to get the octagonal section to fit. Now I have another trip to the hobby store for more rod to make new supports.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I first drilled out the lower decks to the top of the center mast to get a line of sight for the other levels. Then it was hold the flag level in place and drill, and then the 8" director platform. Took a little finageling but in the end I got it. Had a little bit of filling to do around some of the holes but it was worth it. I also glued the top of the director platform to the roof of the base. Then I put it all together just to see how it worked.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Now it was time for the bracing on the 8" director platform. My brainstorm of trying to hand cut sheet brass was a big flop. I wasn't happy with the way my previous efforts in brass rod looked so I was looking for something better. I tried the hobby shop and no brass rod, or anything for that matter, smaller than what I had. Even styrene left me short as I couldn't get the smaller sizes I wanted, .010 and .015, in square stock. I even had a brainstorm and wrote to Jurgen at GMM asking if they might consider a small PE set to expand on what they already had. He replied quickly, surprising me very much as I had sent it on Labor Day, giving his regrets that current business conditions kept him from doing it. Pretty much what I expected but he was really nice and I appreciated his prompt response. Then another brainstorm struck. When I was doing those little boxes on the funnel structure, whatever they were, I cut down some railing and used that for the tiny parts so that's what I did. As I sit here the final piece is drying on the workbench. Not the whole job, just the first brace, but it does work and it seems to be the best of anything I've tried. I may even revisit the funnel platform for the 50 cal cooling tank. Maybe. Anyway that's where I'm at, still waitng for the radar from WEM, the Lexington class Carriers from Amazon, and my ambition to get back up and running.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
The mailman was really nice today and brought both The Lexington Class Carriers and my PE from WEM! I skimmed through the book and had to get to work on the radar. It was really touchy mounting the screen on the base but once done I just had to see it in it's proper place. I carved a slight indentation into the roof of the 8" director platform and fitted a piece of .040 styrene to fit. This made the base for the radar and I had to put the bridge structure back together again and then balance the radar in place so I could get a picture. Now the radar is safely esconced in a little container on my bench waiting for the appropiate time to come out of hiding along with it's big brother the cxam.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I finally got my computer problems straightened out and can post what I've been working from. I had a copy of a page from The Lexington Class Carriers but the quality wasn't very good which is why I got a used copy of the book. Anyway I scanned the particular photo and then cropped the different areas to show why I did what I did. First a close up of the Nav level to show how the masts were never inside the cabin and how it was built around them. Then the foretop showing how they come together and the correct shape of the spreaders instead of the little stub in the kit parts. I'll do the schematics in another post
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Now the cuts from the HNSA plans that show the same details.
- DanCinSD
- Posts: 581
- Joined: Sat Nov 25, 2006 11:14 pm
- Location: San Diego, California
- Contact:
Re: WIP - 1/350 USS Lexington (CV-2)
I am really enjoying your build and the information you are presenting in your posts.
Dan
Field Artillery, King of Battle
Please check out the Secret Society of Model Builders on facebook.
Field Artillery, King of Battle
Please check out the Secret Society of Model Builders on facebook.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Just passing along some of the help that's been given to me but thank youDanCinSD wrote:![]()
I am really enjoying your build and the information you are presenting in your posts.
James
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
In my deconstruction of the bridge structure I'm kind of bouncing around in the rebuild, allowing one part to set up while working on another. Let's start with the nav level. After redrilling for the masts I wasn't happy with the way the hole for the ladder going down opened into the hole for the mast. That being the case I cut it out and filled it with a piece of .030 strip, filled, sanded, and redrilled the mast hole. Now I recut the ladder hole, placed according to the HNSA prints but quickly ran into a problem. If I made the hole big enough for the ladder it butted against the mast and left no room for passage around it. I went to some ladders I had from L'Arsenal and they're just a bit narrower but a little too long for this placement so it was snip and fit. I'm still not happy with the space left for walking around and as I looked at the prints I felt that the deck was just a tad short so I'm seriously thinking of adding a narrow strip, say .030 to the back of the deck. That translates to a foot in scale so we'll see how that works out.
I know I had taken a pic of this during construction but it seems to have disappeared so I'll just have to let one pic do double duty. It also shows the undergirding on the director level and I'm still not really happy with that but it seems the lesser of two evils so far.
When I viewed it after posting I saw I had cropped the deck out of the picture for emphasis on the undergirding so it was a quick jump to the photo editor and then repost the new pic. Now it just shows the deck repair.
I know I had taken a pic of this during construction but it seems to have disappeared so I'll just have to let one pic do double duty. It also shows the undergirding on the director level and I'm still not really happy with that but it seems the lesser of two evils so far.
When I viewed it after posting I saw I had cropped the deck out of the picture for emphasis on the undergirding so it was a quick jump to the photo editor and then repost the new pic. Now it just shows the deck repair.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Next it was the flag level. I had noticed for some time that it was tilted slightly when viewed from the rear but I wasn't going to tear the whole thing apart to fix it but now that the bridge is apart it was time to address it. I measured, just to be sure my eyes weren't playing tricks, and sure enough one side was 1/10th of an inch higher. So it was remove all that hard work done on the railing and splinter matts, losing one extension in the process, leveling the cabin by judicious work on a file, and then add the extension back. Now I have all that rail and splintermattress stuff to do again. And just to add spice to the mixture it seems the rear of the flag deck in the kit is too big! Also looking at the side elvations there is a clear setback from nav to flag level. Now having the correct sized plans is a blessing and a curse. It allows me to check a lot of details but also shows all the flaws. I haven't yet but it looks like I'll be cutting this back and redoing rails or shields, whichever they are.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
And last but not least for today the director level. I had been working on the undergirding and while waiting for glue to set I was working on the windows in the little tower on top. There are clearly two windows to each facet and I was debating, paint, drill, what? Since everywhere else they are drilled I decided to go with that. But trying to align, drill, and finish out all those little things seemed a bit much so I drilled a round hole in each facet, squared it up by knife and file, then put small strips, .010, in place as dividers. While working on this I trashed some of my work underneath and had to redo this also. Anyway it's now going forward but I'm still not satisfied with it.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I went to work first on the flag level, cutting it back, and then restoring the splinter protection. I was lucky in that this level was strip styrene and not rails and pads. I removed the small piece of deck and then reinstalled the railing on the assembly after some judicious sanding to shape. A few of the ribs got lost in the process and had to be replaced.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Now it was time for the nav level. I found the pictures I thought had gone to neverland so can show the whole change. After repairing the area around the holes for the down ladder and the mast I was looking at the plan and thinking the deck seemed short compared to what was depicted. What do you know Trumpeter is true to form and it was. I measured the plan, what a gift to have them and not have to scale everything, just measure. I added one strip of .030 strip to the back and measured again. Still a little short so one more strip. It's actually a hundredth over but in this scale that's good enough. You can see there is now room for traffic to go around the hole for the ladder.
I was very unsatisfied with the undergirging on the director level and removed it all. Now pondering my next step.
I was very unsatisfied with the undergirging on the director level and removed it all. Now pondering my next step.
- Attachments
Last edited by lvsquarerigger on Tue Sep 11, 2012 10:08 am, edited 1 time in total.
- taskforce48
- Posts: 1619
- Joined: Mon May 21, 2007 5:49 pm
- Location: The beautiful PNW
Re: WIP - 1/350 USS Lexington (CV-2)
This is an insane amount of detail! You are really doing the ole' girl proud. Keep up the good work and thanks for the pics, never seen a couple of them before.
Matt
Matt
In the yards right now:
USS Utah AG-16
On Hold
1/350 USS Portland CA-33 1942
1/350 Trumpeter Texas with a twist
USS Utah AG-16
On Hold
1/350 USS Portland CA-33 1942
1/350 Trumpeter Texas with a twist