Thanks for the compliments. Thought an update was in place, so here it is. It shows most of the work that was done the last couple of months (on this ship at least

)
Practically I had to first put the railing and stairs on around the lifeboats before I could install the boats. At first I ordered some Dean's Marine stairs, but they were too wide and the brass was too thick to modify them. So I modified my jig to resemble Capt Haddock's and created the stairs that way. The railings on the stairs are heavily modified Dean's Marine railings and the rest of the railings are Dean's as well. Quite strong brass, easy to install and looks good.
The last couple of weeks I've been testing things for the davits and finally finished the lifeboats (propulsion nozzle and grablines were remaining).
For the grablines I tested a jig to make them in one turn, but actually a method with each bow seperate was working better.
I wound 0.1mm brass wire (from a telephone cable) around a brass tube with a suitable diameter. Then I cut small circles from this "spring". After that I bent one end at a 90° angle to fit inside the hole in the lifeboat. I held the other end with a tweezer and like this I could vary the curve of the bow to all be more or less at same height. Once correct curve was visible, I adjusted the length on the other side to hold it just below the next hole and bent the remaining part of the wire to fit inside the hole. This relatively easy procedure was repeated for each curve. They aren't 100% equal in shape, but in reality they look much worse
Here is the tube with the wire and some pre-cut circles. And a pencil for scale:
Attachment:
C4.jpg [ 195.44 KiB | Viewed 1332 times ]
And the boat more or less in place. The davit with boat was test-fitted with weights holding the cables on my workbench. Once at correct height, the cables were glued on each wheel to hold it. Once the weights were removed the davits could stand by themselves wiht the boat attached. So in these pictures the whole unit is dry-fitted and will be removed again to finish the final supports, railings and lifeboat winch before final installation.
Attachment:
C3.jpg [ 269.65 KiB | Viewed 1332 times ]
Attachment:
C2.jpg [ 331.36 KiB | Viewed 1332 times ]
Attachment:
C1.jpg [ 283.17 KiB | Viewed 1332 times ]
I guess my next sea trial will be with this 1 boat just to make sure it stays onboard and see if I need any addition reinforcements before starting the next boat installation.