Hi guys, here an update.
Unfortunately, work, family, school commitments but especially my children's sports commitments take away any free time I may have. :.-( and therefore progress is slow.
In addition, I'm in a phase where details have to be done and these waste much more time than more substantial work because they have to be checked, assembled, primed, colored, corrected, corrected again, etc. and then at the end you say: well, what progresses have I made during this week? I've assembled 9 lids and 8 paravans! Wow, what enormous progress (irony mode ON)

At the end I'll post the latest updates and an overview.
Let's start with the overview


At the bow, the cleats and the pole on the tip of the bow are missing (obviously the side handrails will be the very last to be installed.
A pole that I am starting to prepare must be inserted on both sides of the hull.

In the A and B turret area, the cable reels are missing. They are in the final stage. I have completed 7 of 14.
Two anti-aircraft guns are to be mounted. They are already ready. They will be installed after the cable reels.

Made the 4 front tertiary batteries (I call them in this way only because I don't remember the caliber)
What worries me is the handrail which is a single piece that starts in front of the first turret (the one on the right to be clear), makes 3 undulations and then ends straight adjacent to the catapult track! Making this will be a nice challenge, both the radius of the curves, and to not get it caught while assembling it. Fortunately the small calibers are not glued and I can remove them


Going towards the stern I completed the famous "covers" always on the base deck. Some open, others closed

That's all folks!