As there are no color pictures of the 1940 period of these ships, it can not be ascertained, but rust was added along the salt streaking.
This will be the final building post of the Dunkerque project. The ships are ready for KMK.

Strasbourg got its fourth cage aerial with a temporary rigging construction.

Between the outriggers, the flag ropes are added.

One of these outriggers had to be reattached and it didn't cure dead straight. I didn't notice and now its too late to correct, with all the tended lines. But it's only visible from behind.

The ringlets remain unpainted until all is fixed.

Some counterweights are used to give Dunkerque her aerials.

The roundels for the flag lines are generic PE.

Having to fix 40 ringlets is causing some irregularities on this scale. I try to separate at least two of the four wires.

Here one bundle got twisted.

I was able to turn it around. I did replace the first aerial, it had too much glue on it.

The most valuable tip I can give anyone building these ships, don't attach the midship boats until all is completely finished. At least 10 times I had to repair them. Now a support had fallen on one boat
and teleported a davits to a parallel dimension. I had dusted around for a while but it did not turn up like the other fallen parts. There was of course the on in twenty option that it would have jumped straight into the toolbox, filled with scratch parts. After sorting this out for a while, the stowaway turned up.

The ships can now be installed on the base. The Loires have a different barycentre in plastic and the nose has to be pulled up by a slackline.

Two Tricolores are painted Tamiya white with Vallejo Clear Blue and Ferrari red.

Even with the ships fixed the sloop manages to escape one last time, so it is supported by a gum support that can be pushed down when the glue has cured.




Then the ships are inspected on shining PE, using Vallejo basalt grey to cover any specks. I misted the propellers with grey too, because they were not pure golden. And then, the final show is up.




























I want to start the Otaki CVAN-65 Enterprise, but I'm missing an order from L'Arsénal. Apparently the tools for PE parts for the internal hangar were lost. I hope this can be resolved soon, if not I jump to another topic.