1/350 NRP SAGRES sail training ship (quite the challenge)

Moderators: BB62vet, MartinJQuinn, JIM BAUMANN, Jon, Dan K

User avatar
JIM BAUMANN
Posts: 5723
Joined: Mon Jan 10, 2005 5:30 pm
Location: Nr Southampton England

Re: 1/350 NRP SAGRES sail training ship (quite the challenge)

Post by JIM BAUMANN »

Thank you for your encouraging words

..> Pride appears to come before a fall it seems !

After the neat spacing out of the boat racks using tape...
an error came to the fore;
P1030134.jpg
I had spaced out the racks from aft to fwd
I had assumed ( !! ) that the Spacings were even and symmetrical

They were not! :doh_1: :Mad_6:
P1030146.jpg




In addition -- having failed to study these images more closely.... another error of mine showed up...
liferaft1.jpg
liferaft rack 5.jpg




At least the retrograde steps were being vindicated to be replaced with a degree of betterment!
P1030149.jpg


More study of the liferaft racks was required

These are surprisingly complex--
the overhead locker was mounted straddling within the 2 x aft arches
liferaft 3.jpg



after a seemingly disproportionate time spent fiddling around it started to be more to my liking!
P1030153.jpg
P1030156.jpg
P1030167.jpg


I felt that the imperfections of the real thing could be replicated on my model after all!

liferaft 4.jpg
P1030179.jpg


=========================================================================================================================




I had been thinking about how to make the funnel with its distinctive cowl
funnel 1.jpg
funnel 2.jpg


Not having a lathe -watchmakers or otherwise ---
( or the required machining skill to create that shape )


I came up with this;


P1030139.jpg
P1030138.jpg

P1030141.jpg
P1030145.jpg

At least the build is going in forward gear again!

more soon

JIM B
....I buy them at three times the speed I build 'em.... will I live long enough to empty my stash...?
http://www.modelshipgallery.com/gallery ... index.html

IPMS UK SIG (special interest group) www.finewaterline.com
Dan K
Posts: 9116
Joined: Tue Jan 11, 2005 10:56 am
Location: New York City

Re: 1/350 NRP SAGRES sail training ship (quite the challenge)

Post by Dan K »

Nice solution to the funnel.
User avatar
Rui Matos
Posts: 428
Joined: Wed Nov 22, 2006 4:42 pm
Location: Lisbon, Portugal

Re: 1/350 NRP SAGRES sail training ship (quite the challenge)

Post by Rui Matos »

Hi Jim

Very creative in finding solutions, and not compromising the looks of the ship!
Also very educational :)

Carry on, carry on... Telford is just two weeks away!
Cheers
Rui
Ship Modelers of the World UNITE
User avatar
JIM BAUMANN
Posts: 5723
Joined: Mon Jan 10, 2005 5:30 pm
Location: Nr Southampton England

Re: 1/350 NRP SAGRES sail training ship (quite the challenge)

Post by JIM BAUMANN »

More small wins...

but cumulatively it brings one fwd....!

The Handrails--superfine PE -Nickle silver-and it stays fine and thin....
==>-as the real ship had these rails painted silver
--and the Nickel-Silver PE can remain unpainted!
The real thing is quite thin .


Thin railing longitudinals .jpg


The railings have been applied in small sections,

1) to allow them to adapt to and conform to the sheer-line of the ship
2) to guard against different ambient temperatures causing expansion and shrinkage of plastic versus metal
( previous negative experience when I built the Normandie...)


P1030191.jpg

For the upswept rails at the bow...-the sheerline increases sharply
The angle of the longitudinal rails steepens as one goes fwd to the bow
To maintain vertical stanchions--I prepared the sections like this below

note--this results in quite epic amounts of failure and waste PE !


P1030192.jpg


The taping at the base of the rails--simulating the waterway and the outside black trake is done with 0.3mm tape



P1030196.jpg


These 2 x images shows the Capstan bars stowed on the inboard face of the railings
DURoYT0US9QH0z6T.jpg
DURoYT0US9QH0z7T.jpg


These capstan bars..... to maintain perfect and even alignment to simulate being in a rack
were made of re-purposed PE....

P1030195.jpg
P1030193.jpg

The slight distortions of the longitudinal bars can be adjusted ( very fiddly ) with a scalpel blade tip and using gentle leverage
P1030194.jpg


Adding the details to the railings and cutting to allow the life-raft canisters
to be deployed took much fiddling , experimentation and some failures!

The large fairleads with rollers are still being worked on
lXYzVikb1v33lzOG.jpg
P1030197.jpg
P1030198.jpg

More soon
JIM B :wave_1:
Attachments
nrp_sagres_16_dvdb08.JPG
....I buy them at three times the speed I build 'em.... will I live long enough to empty my stash...?
http://www.modelshipgallery.com/gallery ... index.html

IPMS UK SIG (special interest group) www.finewaterline.com
Post Reply

Return to “Works in Progress”