1/144 Kiev by Dave Wooley

Fully Documented builds that have been completed and moved from the Online Scratchbuild section.

Moderators: MartinJQuinn, JIM BAUMANN, HMAS, Tiny69, Dave Wooley

User avatar
Neptune
Posts: 2466
Joined: Sun Mar 13, 2005 11:51 am
Location: Belgium

Re: Dave's Kiev

Post by Neptune »

FINALLY A NEW PICTURE!!!!

Dave, did you receive my email last week?

Those radars are looking very good, care to share how you made them?
The merchant shipyard
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Neptune wrote:FINALLY A NEW PICTURE!!!!

Dave, did you receive my email last week?

Those radars are looking very good, care to share how you made them?
Hi Roel Yes I did and I did reply. Thanks for your comments and thanks for the occasional nudge to get my self into gear and do a few posts. Regarding the build sequence go back to the previous page it shows it all there.
Dave Wooley More to follow but keep the big stick ready :thumbs_up_1: :thumbs_up_1:
User avatar
Neptune
Posts: 2466
Joined: Sun Mar 13, 2005 11:51 am
Location: Belgium

Re: Dave's Kiev

Post by Neptune »

Hmm, seems that I have missed your reply... Didn't receive anything.

Ah, I see, I failed to check your last page after my return. Greatly illustrated, I'm sure it'll be a great help for my future build!
:thumbs_up_1:
The merchant shipyard
User avatar
gtb -red
Posts: 1612
Joined: Thu Dec 14, 2006 8:06 pm
Location: SAN FRANCISCO CA.

Re: Dave's Kiev

Post by gtb -red »

what a master. :thumbs_up_1:
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Making up the numerous maintenance platforms that will be fitted either
side of the �Side Globe� ECM domes was time consuming .These are clustered
up the side of the superstructure as this picture of Kiev shows.
Image
Each platform is cut to size and their positions on the side of the
superstructure marked
Image
On the smaller platform the single angled support frame is off set.
Were as on the longer platform this is fixed in the centre.
Image
Fixing the surrounds .
Image
There are two length of platform. This shows the smaller type fitted either side of each ECM dome .
Image
Beneath each lower ECM dome are the two extended platforms. In due course these will be fitted with rails but for now one less job to do .
Image
Dave Wooley Next job coming up making the "FRAS 1 ASW launcher
User avatar
J. Soca
Posts: 2161
Joined: Sun Dec 03, 2006 5:36 pm
Location: About 50 miles away from the Gulf of Mexico ( traveling W is you do so :)

Re: Dave's Kiev

Post by J. Soca »

Excellent work here !!!!! :thumbs_up_1: :thumbs_up_1:
User avatar
ARH
Posts: 2557
Joined: Mon Jan 10, 2005 10:52 am
Location: Land of the Cheshire cat

Re: Dave's Kiev

Post by ARH »

Nice One Dave :thumbs_up_1: :thumbs_up_1:
Simple but effective.
User avatar
desron48
Posts: 178
Joined: Sun Sep 23, 2007 9:22 pm

Re: Dave's Kiev

Post by desron48 »

very inspiring dave...... :thumbs_up_1: ...joe
User avatar
desron48
Posts: 178
Joined: Sun Sep 23, 2007 9:22 pm

Re: Dave's Kiev

Post by desron48 »

what you use for balls dave....lol.. :heh: ....joe
User avatar
Andy G
Posts: 234
Joined: Wed Nov 02, 2005 9:12 am

Re: Dave's Kiev

Post by Andy G »

Crikey! Neat & excellent work as ever, Dave.

Andy
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

desron48 wrote:what you use for balls dave....lol.. :heh: ....joe
These are formed using layers of 2.5mm styrene built up , cut and shaped .{ I'll show how this was done} Once again life would have been much easier if I'd set to and moulded the lot .Yet surprisingly once started the process didn't take that long and I quite enjoy , in a perverce way making work! Also thanks for all your comments much appriciated.
:thumbs_up_1: Dave Wooley
User avatar
Bluehawk
Posts: 30
Joined: Thu Aug 30, 2007 3:37 am

Re: Dave's Kiev

Post by Bluehawk »

Hi Dave! :wave_1:

Outstanding exellent work! :thumbs_up_1: :thumbs_up_1: :thumbs_up_1:
But can you tell me, how you doing the rings for the cable tracked up to the Top Sail radar array??
And by the way, what material do you use as surrounds for the platform??

Martin
Currently Building: Krivak I 1/72
Upcoming: Udaloy I 1/72
Sovremenny (Type 956E) 1/72
Kirov 1/72
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Bluehawk wrote:Hi Dave! :wave_1:

Outstanding exellent work! :thumbs_up_1: :thumbs_up_1: :thumbs_up_1:
But can you tell me, how you doing the rings for the cable tracked up to the Top Sail radar array??
And by the way, what material do you use as surrounds for the platform??

Martin
Hi Martin The cable do you mean the arms that supports the lower section of the large array . The brass wire used was 0.5mm and 0.31mm With each brass stabilizing sail 0.25mm in thickness . The upper platform is formed from 1mm styrene. Thanks for asking .
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

When building Moskva I used a frame for the Top Sail
covered in fine mesh.
Image
Moskva under construction with the Top Sail in place.
Image
Dave Wooley
User avatar
Jefgte
Posts: 542
Joined: Fri Aug 26, 2005 6:53 am
Location: France

Re: Dave's Kiev

Post by Jefgte »

:woo_hoo:
Superb :thumbs_up_1: :thumbs_up_1: :thumbs_up_1:


Jef :wave_1:
Current 1/700 WL
HMS Repulse
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Thank you Jef, much appreicated :wave_1:
Dave Wooley
User avatar
nick
Posts: 832
Joined: Tue May 29, 2007 2:23 am
Location: Queen City of the South - Cebu City, Philippines
Contact:

Re: Dave's Kiev

Post by nick »

:thumbs_up_1: :thumbs_up_1: :thumbs_up_1:
Nichol Caballero
Civil Engineer and Ship Enthusiast
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Each part of the FRAS-1 launcher was cut to size and made ready to
assemble almost like a kit of parts.
Image
The arms were cut to shape and the launch rail fitted.
Image
Holes were marked and drilled into the pillar ready to fit the treads.
Image
A method used to ensure that each tread is the same.
Image
The twin armed �FRAS-1� launcher known as the SUW-N-1 temporarily in place.
Image
Dave Wooley
ModelMonkey
Model Monkey
Model Monkey
Posts: 4118
Joined: Sat Aug 20, 2005 9:27 pm
Location: USA
Contact:

Re: Dave's Kiev

Post by ModelMonkey »

Truly a masterpiece! Great idea for ensuring the rungs were evenly spaced.
Have fun, Monkey around. TM

-Steve L.

Complete catalog: - https://www.model-monkey.com/
Follow Model Monkey™ on Facebook: - https://www.facebook.com/modelmonkeybookandhobby
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Steve Larsen wrote:Truly a masterpiece! Great idea for ensuring the rungs were evenly spaced.
Hi Steve thanks for your kind words , however I can't lay claim to the ladder spacer that method I picked up from my old friend Brian King.
Dave Wooley
Post Reply

Return to “Completed Builds [Fully documented]”