1/144 Kiev by Dave Wooley
Moderators: MartinJQuinn, JIM BAUMANN, HMAS, Tiny69, Dave Wooley
- Neptune
- Posts: 2466
- Joined: Sun Mar 13, 2005 11:51 am
- Location: Belgium
Re: Dave's Kiev
FINALLY A NEW PICTURE!!!!
Dave, did you receive my email last week?
Those radars are looking very good, care to share how you made them?
Dave, did you receive my email last week?
Those radars are looking very good, care to share how you made them?
The merchant shipyard
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Hi Roel Yes I did and I did reply. Thanks for your comments and thanks for the occasional nudge to get my self into gear and do a few posts. Regarding the build sequence go back to the previous page it shows it all there.Neptune wrote:FINALLY A NEW PICTURE!!!!
Dave, did you receive my email last week?
Those radars are looking very good, care to share how you made them?
Dave Wooley More to follow but keep the big stick ready
- Neptune
- Posts: 2466
- Joined: Sun Mar 13, 2005 11:51 am
- Location: Belgium
Re: Dave's Kiev
Hmm, seems that I have missed your reply... Didn't receive anything.
Ah, I see, I failed to check your last page after my return. Greatly illustrated, I'm sure it'll be a great help for my future build!

Ah, I see, I failed to check your last page after my return. Greatly illustrated, I'm sure it'll be a great help for my future build!
The merchant shipyard
- gtb -red
- Posts: 1612
- Joined: Thu Dec 14, 2006 8:06 pm
- Location: SAN FRANCISCO CA.
Re: Dave's Kiev
what a master. 
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Making up the numerous maintenance platforms that will be fitted either
side of the �Side Globe� ECM domes was time consuming .These are clustered
up the side of the superstructure as this picture of Kiev shows.

Each platform is cut to size and their positions on the side of the
superstructure marked

On the smaller platform the single angled support frame is off set.
Were as on the longer platform this is fixed in the centre.

Fixing the surrounds .

There are two length of platform. This shows the smaller type fitted either side of each ECM dome .

Beneath each lower ECM dome are the two extended platforms. In due course these will be fitted with rails but for now one less job to do .

Dave Wooley Next job coming up making the "FRAS 1 ASW launcher
side of the �Side Globe� ECM domes was time consuming .These are clustered
up the side of the superstructure as this picture of Kiev shows.

Each platform is cut to size and their positions on the side of the
superstructure marked

On the smaller platform the single angled support frame is off set.
Were as on the longer platform this is fixed in the centre.

Fixing the surrounds .

There are two length of platform. This shows the smaller type fitted either side of each ECM dome .

Beneath each lower ECM dome are the two extended platforms. In due course these will be fitted with rails but for now one less job to do .

Dave Wooley Next job coming up making the "FRAS 1 ASW launcher
- J. Soca
- Posts: 2161
- Joined: Sun Dec 03, 2006 5:36 pm
- Location: About 50 miles away from the Gulf of Mexico ( traveling W is you do so :)
Re: Dave's Kiev
Excellent work here !!!!!

- ARH
- Posts: 2557
- Joined: Mon Jan 10, 2005 10:52 am
- Location: Land of the Cheshire cat
- desron48
- Posts: 178
- Joined: Sun Sep 23, 2007 9:22 pm
- desron48
- Posts: 178
- Joined: Sun Sep 23, 2007 9:22 pm
- Andy G
- Posts: 234
- Joined: Wed Nov 02, 2005 9:12 am
Re: Dave's Kiev
Crikey! Neat & excellent work as ever, Dave.
Andy
Andy
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
These are formed using layers of 2.5mm styrene built up , cut and shaped .{ I'll show how this was done} Once again life would have been much easier if I'd set to and moulded the lot .Yet surprisingly once started the process didn't take that long and I quite enjoy , in a perverce way making work! Also thanks for all your comments much appriciated.desron48 wrote:what you use for balls dave....lol......joe
- Bluehawk
- Posts: 30
- Joined: Thu Aug 30, 2007 3:37 am
Re: Dave's Kiev
Hi Dave!
Outstanding exellent work!
But can you tell me, how you doing the rings for the cable tracked up to the Top Sail radar array??
And by the way, what material do you use as surrounds for the platform??
Martin
Outstanding exellent work!
But can you tell me, how you doing the rings for the cable tracked up to the Top Sail radar array??
And by the way, what material do you use as surrounds for the platform??
Martin
Currently Building: Krivak I 1/72
Upcoming: Udaloy I 1/72
Sovremenny (Type 956E) 1/72
Kirov 1/72
Upcoming: Udaloy I 1/72
Sovremenny (Type 956E) 1/72
Kirov 1/72
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Hi Martin The cable do you mean the arms that supports the lower section of the large array . The brass wire used was 0.5mm and 0.31mm With each brass stabilizing sail 0.25mm in thickness . The upper platform is formed from 1mm styrene. Thanks for asking .Bluehawk wrote:Hi Dave!![]()
Outstanding exellent work!![]()
![]()
![]()
But can you tell me, how you doing the rings for the cable tracked up to the Top Sail radar array??
And by the way, what material do you use as surrounds for the platform??
Martin
Dave Wooley
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
When building Moskva I used a frame for the Top Sail
covered in fine mesh.

Moskva under construction with the Top Sail in place.

Dave Wooley
covered in fine mesh.

Moskva under construction with the Top Sail in place.

Dave Wooley
- Jefgte
- Posts: 542
- Joined: Fri Aug 26, 2005 6:53 am
- Location: France
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Thank you Jef, much appreicated
Dave Wooley
Dave Wooley
- nick
- Posts: 832
- Joined: Tue May 29, 2007 2:23 am
- Location: Queen City of the South - Cebu City, Philippines
- Contact:
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Each part of the FRAS-1 launcher was cut to size and made ready to
assemble almost like a kit of parts.

The arms were cut to shape and the launch rail fitted.

Holes were marked and drilled into the pillar ready to fit the treads.

A method used to ensure that each tread is the same.

The twin armed �FRAS-1� launcher known as the SUW-N-1 temporarily in place.

Dave Wooley
assemble almost like a kit of parts.

The arms were cut to shape and the launch rail fitted.

Holes were marked and drilled into the pillar ready to fit the treads.

A method used to ensure that each tread is the same.

The twin armed �FRAS-1� launcher known as the SUW-N-1 temporarily in place.

Dave Wooley
-
ModelMonkey
- Model Monkey

- Posts: 4118
- Joined: Sat Aug 20, 2005 9:27 pm
- Location: USA
- Contact:
Re: Dave's Kiev
Truly a masterpiece! Great idea for ensuring the rungs were evenly spaced.
Have fun, Monkey around. TM
-Steve L.
Complete catalog: - https://www.model-monkey.com/
Follow Model Monkey™ on Facebook: - https://www.facebook.com/modelmonkeybookandhobby
-Steve L.
Complete catalog: - https://www.model-monkey.com/
Follow Model Monkey™ on Facebook: - https://www.facebook.com/modelmonkeybookandhobby
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Hi Steve thanks for your kind words , however I can't lay claim to the ladder spacer that method I picked up from my old friend Brian King.Steve Larsen wrote:Truly a masterpiece! Great idea for ensuring the rungs were evenly spaced.
Dave Wooley