Step 5 Mainstay.
Longridge P220-21. Plan 8. Plate 74.
Hackney P62 .Plate 11.
Lead a length of 14" rope down through one of the two rear slots of the marines walk,down through the angled drilling in the knighthead ,through the large hole in the gammoning knee, up through the other knighthead and up through the other rear slot in the marines walk.Seize the two ends around a 26" heart .Then lead a length of 19" rope up through the maintop round the back of the masthead and down through the other side of the main top.Seize a second 26" heart in the free end.Lead this end down to the starboard of the foremast and reeve the two hearts together with 6" rope ,tying the end around the turns.
Please note:When the mainstay has been rigged attach a 16" single block to each side of its collar close under the main top just forward of the lower shrouds.These blocks will be used for the fore braces at a later stage.
