I�ve been preparing the deck edge rails . There are not just one set but
5 different types. Also on part of the starboard deck edge, a length of rail is divided into
separate sections as per the photo.

Using a pin vice the holes for each stanchion are drilled out

A different type ,as seen on the port walkway fixed around the life raft chutes .

Moving aft to the starboard sponsons . here the pre-painted surfaces are
fitted into place , ready for the rails, AK630s and various other fittings which
include the chaff launcher. This method makes for a neat finish .

Going forward to the forecastle some of the fittings are placed in position .
This is one of a number of fold down aerials .

The area around the SS-N-12 launch tubes

Here the crane is temporarily in place ready to be rigged.

Dave Wooley more to come.
