Camera angle makes it look longer than the drawing but they are the same length.


Dan.
Moderators: MartinJQuinn, JIM BAUMANN, Jon, Dan K







You are putting significant work into these kits - impressive!California Bound wrote:
I had more time this week so I was able to get some work done.
I've decided that the Gepard I've been building as a side project is finally done so I will set it aside to wait for the others so I can paint them as a group.
The bow has been streamlined a little bit (should have been more).
New bow diving planes have been moved and re-sized (they're still swept back despite the photo).
New deck rails and vents opened.
Conning tower is taller and periscopes have been moved.
New reactor water intake scoops.
All four tail fins redone and the new prop.
For the typhoon I've finished most of the hull sides now.
Plastic strip have been added where there should be some panel lines. The strips are in the process of being sanded down to blend them into the hull more.
The keel has been added to the lower edge of the hull.
All that is left now is to make the reactor water intakes, then I can start the main part of the project and cut into the stern.
Dan.








