Carrier Builders Yard, whats on the Slipway
Moderators: BB62vet, MartinJQuinn, JIM BAUMANN, Jon, Dan K
- gtbred
- Posts: 2717
- Joined: Wed Jan 13, 2010 9:10 am
- Location: san francisco
Re: Carrier Builders Yard, whats on the Slipway
now i got two pain in butt!
got your package coming Ed 
- Hippy Ed
- Posts: 2013
- Joined: Wed Nov 29, 2006 12:22 pm
- Location: Calif
- Contact:
Re: Carrier Builders Yard, whats on the Slipway
gtbred wrote:now i got two pain in butt!![]()
got your package coming Ed
I'll be watchin' fer it Red! Thanks
If ya lose yer sense of humor...
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Well howdy everyone,
I made an attempt to work on some of the rebuilds, but mother nature decided to blow in with a thunder storm..
power started blinking soooooooo I got my orders from the CNC to get in the house. I did manage to get the frame work done on one for the elewells, and started another. But that's when the storm hit. I'll make another attempt Sunday after work
I made an attempt to work on some of the rebuilds, but mother nature decided to blow in with a thunder storm..
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Well, mother nature is just not working with me, it is now Monday evening and it's STILL raining and the temp has dropped a lot so no work in the dock yard, I can see the slip way but can't seem to brave the cold, the rain, to get to the shop. I hope to get some work down later this week since I have another Saturday to work, then maybe Sunday will be a good day!
at least I am hopeful that I will get to do some work. Mainly some painting needs to be done and with all the moisture in the air it ain't happening till it drys up.

Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Well, I have gotten 2 SARATOGA's, one I am planning to do as the SARA and the other I am thinking about doing as the RANGER, still I might do it as FORRESTAL,
just haven't made up my mind yet. Those builds are a little ways off anyhow, as I'm still working all those NIMITZ class CVN's.
I think having so many rebuilds underway is good for now, and with the TRUMAN and the WASHINGTON as new construction builds, well I do have plenty of work to do. I am hoping to get some work done this weekend, but I have to work Saturday, and Sunday is my only day off and I have worked the last 14 days in a row. I r tried!!!!! But as we all know the Navy wasn't built in a day or month soooooo. I think by taking time away from the builds I can rethink the way things are going and make a better plan on what to do.
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Well made some progress tonight on three builds, TRUMAN'S flight deck is painted,
WASHINGTON'S flight deck is added,
ready for I beams to be added to the underside, and I made the elevator ballistic doors and added them to one of the rebuilds (LINCOLN)
I worked it that way since I could not remove the flight deck, but was able to remove the waterline plate, which will be made from scratch now to replace it.
I am planning to finish the island structure for the TRUMAN this weekend and get it primed / painted, and start the island structure for the WASHINGTON, and rework the LINCOLN island structure ie: mast and radar tower
I am still planning on ordering starfighter decals for the rebuilds.
One thing I did start to think about tonight was where and how I am going to display them once they are done, my workshop has wall brackets for shelves but no shelves, that was the way it was when we moved here. If I put them on shelves they'll be out in the open and damn the dust that will be collected, so I think I'll build me some display cases and put them in those.
I am planning to finish the island structure for the TRUMAN this weekend and get it primed / painted, and start the island structure for the WASHINGTON, and rework the LINCOLN island structure ie: mast and radar tower
One thing I did start to think about tonight was where and how I am going to display them once they are done, my workshop has wall brackets for shelves but no shelves, that was the way it was when we moved here. If I put them on shelves they'll be out in the open and damn the dust that will be collected, so I think I'll build me some display cases and put them in those.
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Just a quick update on a few of my builds:
TRUMAN: flight deck is now painted and hull is now completed, just have to add a few details such as weapons and such. Then it will be ready for decals, but I will have to gloss coat the flight deck prior to adding them. The island structure is 90% complete, few tiny things to add at the top. Then on to prime and paint, decals and attachment to the flight deck.
WASHINGTON: underside of flight deck is now complete, sponsons completed, and the whole thing is now primed. I waited a few hours and painted to flight deck. After it cures for a day or so I'll mask over the deck and paint the whole thing haze gray. I began to construct the island ab out 40% complete. {on hold awaiting paint curing}
LINCOLN: flight deck repainted, but had forgot to do one thing, remove the old decals what a dumb move
NIMITZ: prep work to hull now completed, hangar bay is almost completed {boxed out} prep work planned out for the sponsons.
I'll take pictures Monday or Tuesday and post them, it just got to dark outside tonight.
Still have five more NIMITZ CLASS to hit dry dock, well actually four as I am going to scrape one out so I will just haft to buy another one or two, or three well you get the idea.........
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Well another update,
TRUMAN: no progress, on hold.
WASHINGTON: flight deck painted and the ship is now haze gray
LINCOLN: NOT likin' at all I am thinking about scrapping her, Like I said before I forgot to remove the decals prior to repainting the flight deck
and they are not taking the paint well at at. This is one I had some problems with dismantling to start with, so looks like I will be getting another.
NIMITZ: Well I have the hull complete, flight deck attached, sponsons are on, glue is curing and about ready to prime.
TRUMAN: no progress, on hold.
WASHINGTON: flight deck painted and the ship is now haze gray
LINCOLN: NOT likin' at all I am thinking about scrapping her, Like I said before I forgot to remove the decals prior to repainting the flight deck
NIMITZ: Well I have the hull complete, flight deck attached, sponsons are on, glue is curing and about ready to prime.
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- Hippy Ed
- Posts: 2013
- Joined: Wed Nov 29, 2006 12:22 pm
- Location: Calif
- Contact:
Re: Carrier Builders Yard, whats on the Slipway
Jim, I have to admit, you have taken on quite a task with your fleet. i do not think I could take on such a task... Good luck to ya
If ya lose yer sense of humor...
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Ed,
Thanks bud, I had a few lumps and bumps on the forehead,
but when I get to a stand still on one I look at the others and just start tinkering on it and before I know it I am wrapped up into another one. I am just looking forward to getting those rebuilds done and start something fresh. I was thinking about starting my 350 HORNET but not sure at the moment. Just can see past those darn NIMITZ carriers.
Thanks bud, I had a few lumps and bumps on the forehead,
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- Hippy Ed
- Posts: 2013
- Joined: Wed Nov 29, 2006 12:22 pm
- Location: Calif
- Contact:
Re: Carrier Builders Yard, whats on the Slipway
I hear ya JIm
I'm about to start my 1/542 Revell Essex CVA-9 for a group build on another forum. Also, here lately, I've been thinkin' of startin' up my 1/700 CV-19 and do her up in her FEB 1945 configuration
Yet, I need to git my 1/350 Ranger back on the front burner too...
IF i had a Tico, I'd start her up in her NOV 1944 config. Namely because of a Lt. John W. Fair of VF-80 got his 1st kill on 5NOV1944 & bagged a couple more on 16 FEB 1945 with the squadron on CV-19.
John Fair is an ace with either 5 or 6 kills...
IF i had a Tico, I'd start her up in her NOV 1944 config. Namely because of a Lt. John W. Fair of VF-80 got his 1st kill on 5NOV1944 & bagged a couple more on 16 FEB 1945 with the squadron on CV-19.
John Fair is an ace with either 5 or 6 kills...
If ya lose yer sense of humor...
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Well, just a quick update on these multipal builds........
minor details left of the island structure for TRUMAN, and WASHINGTON, then ready for decals...
LINCOLN.....Well still trying to rework, still trying to figure out if its going to be salvageable.
NIMITZ, Well underway, hangar bay complete, flight deck attached and primed, but had paint / primer problem, had a spaddering effect and now have to sand down and reprime.
Soooooo that is what is new I am going to go work on some more and get some new pics to post.
minor details left of the island structure for TRUMAN, and WASHINGTON, then ready for decals...
LINCOLN.....Well still trying to rework, still trying to figure out if its going to be salvageable.
NIMITZ, Well underway, hangar bay complete, flight deck attached and primed, but had paint / primer problem, had a spaddering effect and now have to sand down and reprime.
Soooooo that is what is new I am going to go work on some more and get some new pics to post.
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
"I CAN'T FIND THE ^$#& CAMERA"
So I can get new pics to post yet. But as soon as I find it I'll get some updated pics.
So I can get new pics to post yet. But as soon as I find it I'll get some updated pics.
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JerryTodd
- Posts: 109
- Joined: Wed Nov 04, 2009 8:40 am
- Location: Severna Park MD USA
- Contact:
- Hippy Ed
- Posts: 2013
- Joined: Wed Nov 29, 2006 12:22 pm
- Location: Calif
- Contact:
Re: Carrier Builders Yard, whats on the Slipway
JerryTodd wrote:It's on your phone
If ya lose yer sense of humor...
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
- Hippy Ed
- Posts: 2013
- Joined: Wed Nov 29, 2006 12:22 pm
- Location: Calif
- Contact:
Re: Carrier Builders Yard, whats on the Slipway
Ok fellas, I've been neglecting my Carrier builds due to wingy thingies
Huh
Well, it was a US Navy jet

But, to redeem meself, I have started my 1/540 Revell USS Essex CVA-9 1958
I had some A/B troubles when I first started but, I figgered it out and got 'er going again!
Well, it was a US Navy jet

But, to redeem meself, I have started my 1/540 Revell USS Essex CVA-9 1958
I had some A/B troubles when I first started but, I figgered it out and got 'er going again!
If ya lose yer sense of humor...
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
- Mark McKinnis
- Posts: 1614
- Joined: Fri Nov 24, 2006 7:30 pm
- Location: Cape Canaveral Florida
Re: Carrier Builders Yard, whats on the Slipway
Nice Vigilante Ed!
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Nice recovery on the carrier Ed, startin to look like something.
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- JimVarnellABH2USN
- Posts: 1287
- Joined: Sun Mar 18, 2012 7:31 pm
- Location: Macclesfield NC
Re: Carrier Builders Yard, whats on the Slipway
Jerry,
I can't figure that thing out, can hardly make a call on the darn thing.
I can't figure that thing out, can hardly make a call on the darn thing.
Jim Varnell
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
ABH2 USN/RET.
89-00
Eastern NC Modelworks
Up coming projects:
1/700 scale rebuild of diorama project 960 square feet.
(Table 1 underway)Feb.2017
1/350 USS ALASKA CB-1(started Aug. 2017) 70% completed
- Hippy Ed
- Posts: 2013
- Joined: Wed Nov 29, 2006 12:22 pm
- Location: Calif
- Contact:
Re: Carrier Builders Yard, whats on the Slipway
Thanks JimJimVarnellABH2USN wrote:Nice recovery on the carrier Ed, startin to look like something.
If ya lose yer sense of humor...
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
You've lost everything...
On the Bench:
1/720 Italeri CVN-68 ca 1976/77
1/800 ARii 1/800 CV-59 backdating to 1961 (CVA-59)
1/700Trumpy USS Hornet CV-8 "Doolittle Raiders"
