Tutorial time
Building the CAD-N-1 Kashtan modified for the Russian corvette Steregushchiy.
I�ll be moving on to build up the centre support, tracking radar support and the housing for the optical tracker.
The centre support and the two side drums are now fitted together and can be fitted onto the mounting .
To make the build more coordinated the next step is to commence assembly of these three parts which for ease of reference and to simplify I have listed as items A ,B, and C .
Commencing with item A which is the support for part of the tracking radar system .
Each of the pre-cut 1:72nd scale each side is prepared ready to be joined together.

Once joined together the gap can be covered by a strip of .50mm styrene , a simple operation but best bonded with CA
Seen here to the rear of the mounting .
With item A prepared attention can shift to item B .This is ringed in red in this picture.
This fitting is also very simple to make but bearing in mind that there is a recess into the exposed side of the fitting .
The recess in the side for housing electrical boxes is created.
The next fitting is marked as C on the picture but is the optical tracker housing .
Once again the basic parts are cut and prepared for assembly .

When assembled there is a flat section on the top edge .
Progress thus far.

The next job is to start assembly of these basic parts [ all will be explained ] before work on the gun housings and the mass of detail to the rear of the Kashtan !
Dave Wooley Thanks for looking in
to be continued-------------
To be continued------------------