Hello all
thanks lot friends

small news of my WIP. it advances very slowly, as the area of ??the castle in its original configuration is not covered by the blueprints very worthy of the name!I must interpret the pictures available to me, and it takes time.
the last time ,I had stayed here
I returned to work ,by reducing the slots of vision of blockhouse ,by sticking small pieces of plastic card 0.30
on top of the navigation platform, I recovered from the original parts, the positioning lines
it'll allow me to do subsets. the work continuous " by climbing" in the floors
I retook the part forming the "first" floor, in removing all the details (fake!)
then I redid the floor of the intermediate gateway (still recovering the positioning lines)
Then comes the turn of the gateway majority (passerelle de majorit� in French)
then comes ,the surface standby platform and the Platform No. 7 , the back of the latter, was reduced, and the yardarms were removed
to finish, the floor of the air surveillance Platform is redone, the shape is different with respect to the post version 43
the result
the "outlines" are here and he'll have to detailed it all .....
has more for new advanced
Cheers
Nicolas