Yes - I would build this as NEW JERSEY, 1967-69 configuration, as shown in the photo previously posted.
I'm close to a decision on this
The ship, in the 1 1/2 years it was in her third commission, saw only minor modifications once she left the Philadelphia Shipyard in early '68. She still had the forward 40mm tubs on the bow, but these were cut down to deck level after arriving in Long Beach in the summer of '68. Crossed anchors were then painted on the remaining steel deck within those circles. I remember leaving San Diego harbor during a routine training cruise on my 2nd ship, USS BAUSELL (DD-845) and NEW JERSEY was entering port, visiting during her shakedown cruise. She was moored at North Island NAS when we returned. What a sight!! Little did I know that barely 3 months later I would report aboard and depart for WesPac 68 as a crewmember.
One difference I've noticed in the various kits and the real ship - her aircraft crane was not the open latticed crane depicted in most of the PE sets. Her crane actually had 4 round pipe columns which formed the shape of the two legs of the crane. This was braced with round pipe at 45 deg. and between all this was welded plate steel with triangular cut outs spaced along the length of the legs. This was common on both legs, all four sides. So, I'm going to do a comparison of the Tom's PE set and Pontos Set to see which would be closer (if possible) to the actual crane. While the Pontos set is a super detailed set, many of the parts would go unused as NEW JERSEY in her third commission had no 40mm or 20mm batteries. In addition, the FC directors had a conical radar replacing the original bedspring type and her masts were entirely different, which will require some scratchbuilding in brass rods and plate. Luckily, I'm getting fairly adept at soldering these days. So, is the price of the Pontos set reasonable for what I would use of it? Perhaps the Tom's PE set would be more appropriate.
One other minor change carried out after we came back from WesPac was the after side of the upper superstructure forward of the forward stack was painted flat black. This was the ECM suite that was part of the modifications done to the forward tower. I'm guessing the reason for this change in painting scheme was to mask the discoloration of that side of the upper works from stack gas and smoke emitting from the stack.
I'm not sure at the moment that the teak deck offered by Pontos will work for this build as it appears to have cutouts for all the main deck 20mm AA batteries. When these were removed on the actual ships, the decks were re-planked and there was no visible trace remaining of the original weapons or their shields. Perhaps someone will post a photo of the raw deck pieces in the near future.
Well, tomorrow being Thanksgiving, I wish all a wonderful holiday and may this extend to our troops in harms way.
Hank



