veliko_pile wrote:So from the kit I can make a modern version also?
I like the look of this deck, the position and the fact that there are a lot of CH53. In this configuration is it possible to have somewhere a CH53 with opened rotors? Maybe preparing to lift off?
Also how many A/C there are in the hangar at a given time? I'd like to put a Harrier in deep maintenance (i saw some photos where they lift the engine for servicing), where it would be in the hangar? Supposedly somewhere where it would not obstruct regular elevator operation.
Thanks
You could about copy that picture if you'd want. Sure you could put a CH53 with the rotors opened, I think that'd look great.
As for a Harrier in the hanger, if they were pulling the engine it'd be dead smack in the middle of the hanger bay. That's where the big lift overhead crane is. Just a quick heads up on that, it will look great all the way up to when you put on the flight deck, then it's going to be VERY hard to see. If you spend a bunch of time on it, I'd put it right in front of the bay door where you can see it. The Well Deck and Hanger bay can be decked out big time, but in the end all that work is almost impossible to see.
I spent more time working in the hanger and the well deck than the rest of the ship, and it's all but non visible.
Hope this helps, have fun with it.
God grant me the courage not to give up what I think is right even though I think it is hopeless. ~ Chester W. Nimitz ~
My Builds ~ http://ussnorthcaroilna.shutterfly.com/
Thanks for the reply. I know its not going to be that much visible but I'm enjoying building it, so I do this kind of things
What about the Ospreys and Chinooks? If I replace the chinookas with mv22's can I still use the layout in that photos? Would there me less ch53 if mv22 are onboard?
God grant me the courage not to give up what I think is right even though I think it is hopeless. ~ Chester W. Nimitz ~
My Builds ~ http://ussnorthcaroilna.shutterfly.com/
It's not the best picture, but you can see both lined up
I hope this picture helps. It's from the USS Bataan, but operations are operations.
God grant me the courage not to give up what I think is right even though I think it is hopeless. ~ Chester W. Nimitz ~
My Builds ~ http://ussnorthcaroilna.shutterfly.com/
Speaking of the USS Bataan, she is one of the ships in the task force in the Persian Gulf, conducting new air strikes against ISIS militants in Iraq.
Aug. 8, 2014
The U.S. has a massive force of ships and aircraft in the Persian Gulf for the air campaign against the Islamic State in Iraq.
The first airstrikes against the Islamic State were carried out by two aircraft from the aircraft carrier George H.W. Bush, which is in the Persian Gulf along with the amphibious assault ship Bataan; the amphibious dock landing ship Gunston Hall; the cruiser Philippine Sea; and the destroyers Arleigh Burke, O�Kane and Roosevelt, according to the Defense Department.
The amphibious transport dock Mesa Verde is elsewhere in the region, according to 5th Fleet.
The Bush is coming to the end of what would be a normal six-month deployment. The carrier Carl Vinson is preparing to deploy to 5th Fleet at the end of August, but is on ready standby as the surge carrier, according to Naval Air Forces spokeswoman Cmdr. Jeannie Groeneveld.
The George H.W. Bush could be extended if U.S. Central Command requires it.
(...EDITED)
Marines from the Bataan Amphibious Ready Group are prepared to recover aircraft and personnel on short notice in a hostile environment should that become necessary, Stephens said in an email.
More than 2,000 Marines from the 22nd Marine Expeditionary Unit are aboard the ships in the Bataan�s group along with 12 MV-22B Ospreys; eight AV-8B Harriers; four CH-53E Super Stallion helicopters; three UH-1Y Venom helicopters and four AH-1W Super Cobra attack helicopters.
I've read various sources that mention that the Wasp LHD's have a monorail type cargo system to move cargo from one part of the ship to other parts, especially in the vehicle storage bays and the well deck.
In this pic below, are the yellowish I-beams on the ceiling going the length of the well deck part of the monorail cargo moving system? http://upload.wikimedia.org/wikipedia/c ... D_1%29.jpg
I don't know for sure why they were removed - I remember reading somewhere that it was due to maintenance issues, but I can't find anything to corroborate that. However, here's a photo of Essex's well deck I shot about a week ago, shortly after she got out of overhaul:
LHD-2 Well Deck 2014-8-1
Gonzo, baby!
There are extending units on the side doors that I remember reading were going to be removed as well, but they're still present on Essex.
With regards to the hangar crane, here's a couple of shots I took:
Wow guys, thanks for the crane location photos. I see that the kit did a flat overhead, i don't know if it will be possible to make that part 100% accurate
veliko_pile wrote:Wow guys, thanks for the crane location photos. I see that the kit did a flat overhead, i don't know if it will be possible to make that part 100% accurate
I've seen someone here that built the hanger with the crane in and lit it. It'd be a tone of work and unless you add an internal camera like he did I don't think you'd even see it.
God grant me the courage not to give up what I think is right even though I think it is hopeless. ~ Chester W. Nimitz ~
My Builds ~ http://ussnorthcaroilna.shutterfly.com/
It's doable; just chop the kit's overhead and build the detail into the underside of the flight deck. However, if you want 100% accuracy you're looking at a ton of work anyway as the kit's overhead is way simplified.
I shot about 500 photos on Essex last weekend and have about 1,400 more I've saved from various Navy sources. I'm working towards offering them all as a reference set for modelers, but it's going to be a bit of a slow process for a bit as I need to organize them by area unless everyone wants to just look and try and figure out what they're seeing
No, I wasn't able to get that day off, but I was able to take the next two afternoons off and shoot about 600 photos (about 500 were worth keeping) that I'm going to try and make available here in a bit. "problem" is that it's about 2.6 Gb total in size and I really don't feel like wading through all of them to resize, etc.
Shot with my phone and not real camera
But I did learn that I am going to be filling and re-sanding all of the planking I scribed into the well deck, now that she's out of overhaul and the wood has been replaced....
Yo, Tracy! Question for ya. Not sure if it's the well deck lighting or if the girders and other cieling support beams/structure are painted this way, but..........in this pic: http://img607.imageshack.us/img607/4241/i50e.jpg
........the I-beams and other ceiling support structure appears a yellowish color. Is that because of the well deck lighting, or is the ceiling support beams, etc. painted this way?
If they are painted this way, then what might be a good Testor or Tamiya color match?