Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Just checking the fit of the major pieces on the Long Beach. So far so good.
Gordon
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
- gtbred
- Posts: 2712
- Joined: Wed Jan 13, 2010 9:10 am
- Location: san francisco
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
also a scratchbuild paper/plastic 1/350 carrier build.gtbred wrote:I'm in. 1/350 scratchbuild papercard Tico.
- Gordon Bjorklund
- Posts: 960
- Joined: Sat Feb 26, 2005 7:32 pm
- Location: Seattle, Wa.
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
I started working on the block house in section three (part numbers C6 and C7)and they have a minor fit problem. I cut the locating pins off of C6 and was able the square the two parts up. With this done, there is still a small fit problem between the two parts but this is hidden mostly by the radar panels. The corners need the most work. If you are doing a 1967 version of this ship you need to open the two other locating slots on part number C6 for the I1 panels. It doesn't tell you to do that in the instructions, so I didn't and will just cut the locating tabs off the back of the I1 panels.
Gordon
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
- drdoom1337
- Posts: 1161
- Joined: Wed Apr 23, 2008 7:40 pm
- Location: New Jersey
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
My reply is quite image heavy, just a lot of seem filling on the deck and hull. Note that I am going to be using the wooden deck that is eventually available for this kit, so I have to wait awhile to test fit.

















- D-Boy
- Posts: 1298
- Joined: Wed May 26, 2010 1:57 pm
- Location: Schodack Landing, NY
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
[quote="Gordon Bjorklund"]I started working on the block house in section three (part numbers C6 and C7)and they have a minor fit problem. I cut the locating pins off of C6 and was able the square the two parts up. With this done, there is still a small fit problem between the two parts but this is hidden mostly by the radar panels. The corners need the most work. If you are doing a 1967 version of this ship you need to open the two other locating slots on part number C6 for the I1 panels. It doesn't tell you to do that in the instructions, so I didn't and will just cut the locating tabs off the back of the I1 panels.
Gordon, did you anticipate this from the dry fit? Looked like it was fitting well at that stage. I have this kit in the stash, and will be taking notes from your build.
D-Boy
Gordon, did you anticipate this from the dry fit? Looked like it was fitting well at that stage. I have this kit in the stash, and will be taking notes from your build.
D-Boy
- D-Boy
- Posts: 1298
- Joined: Wed May 26, 2010 1:57 pm
- Location: Schodack Landing, NY
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
I've recently ordered several wood decks for 1:700 scale IJN vessels. Taking a late-war Yamato through a build and love the fit of the deck. Nice to be able to address seams and airbrush deck details knowing that significant masking and/or brush painting won't be necessary.drdoom1337 wrote:My reply is quite image heavy, just a lot of seem filling on the deck and hull. Note that I am going to be using the wooden deck that is eventually available for this kit, so I have to wait awhile to test fit.
How does the transition in height from wood deck to plastic/steel deck look in 1:350 scale?
- Mark McKinnis
- Posts: 1612
- Joined: Fri Nov 24, 2006 7:30 pm
- Location: Cape Canaveral Florida
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
taskforce48 wrote:Ok, well the 15th has come and pretty much gone, I see a couple of you have already taken off out of the gate. My apologies for not responding to some of you sooner, work has taken an unpleasant bite out of life for the last few days leaving little time anything else. Looks like no one had any objections to allow a couple of their fellow modelers to use partly/barely started kits so I guess they are in.
Mark, please PM me the details of your started kit and I will see if it falls into the guidelines of the other allowed started kits, sort of sounds like it does.
Gordon and D-boy, Great start gents! And Gordon, I never thought flattery would work so wellI count myself very lucky in finding a wife who allows me to indulge in my hobby, I assure you though it comes at a price.
I look forward to everyones builds, and hope all the anticipation will help us along for this 6-month odyssey.
Well now off to the fun!
Matt
Hi Matt,
PM sent. I am still waiting on your verdict to detirmine whether I will do a 1956, SCB-27C (Intrepid, Ticonderoga, or Hancock), or a cold war cruiser. I am leaning towards the 27C just because I think that it would be unique!
I await your decision,
Mark
- D-Boy
- Posts: 1298
- Joined: Wed May 26, 2010 1:57 pm
- Location: Schodack Landing, NY
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Go for that prop-jet transition carrier. There's enough guns and missiles in the build; we need some aircover. Interesting that there's no undersea threat on the build, as of yet.Hi Matt,
PM sent. I am still waiting on your verdict to detirmine whether I will do a 1956, SCB-27C (Intrepid, Ticonderoga, or Hancock), or a cold war cruiser. I am leaning towards the 27C just because I think that it would be unique!
I await your decision,
Mark
- Cliffy B
- Posts: 3125
- Joined: Sun Feb 01, 2009 3:55 pm
- Location: Hawaii
- Contact:
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
I'm with D-boy, go for a 27C! Still a straight deck, but a nice mix of props and jets. Can't remember the last one of those I've seen built anywhere. DO IT!!!!!
As for my build, I'm finalizing the design and working up a backstory for my Korean era North Carolina. Trying to place the last bits of equipment and running out of room to place them. Still need to order some twin 3"/50s as well. Everything else has been accounted for thankfully. She'll be waterlined but I'm not sure if I'll have her pier side or underway. Suggestions?
As for my build, I'm finalizing the design and working up a backstory for my Korean era North Carolina. Trying to place the last bits of equipment and running out of room to place them. Still need to order some twin 3"/50s as well. Everything else has been accounted for thankfully. She'll be waterlined but I'm not sure if I'll have her pier side or underway. Suggestions?
Drawing Board:
1/700 Whiff USS Leyte and escorts 1984
1/700 Whiff USN Modernized CAs 1984
1/700 Whiff ASW Showdown - FFs vs SSGN 1984
Slipway:
1/700 Whiff USN ASW Hunter Killer Group Dio 1984
1/700 Whiff USS Leyte and escorts 1984
1/700 Whiff USN Modernized CAs 1984
1/700 Whiff ASW Showdown - FFs vs SSGN 1984
Slipway:
1/700 Whiff USN ASW Hunter Killer Group Dio 1984
- taskforce48
- Posts: 1612
- Joined: Mon May 21, 2007 5:49 pm
- Location: The beautiful PNW
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Mark,Mark McKinnis wrote:I await your decision,
Mark
PM inbound! Sorry for delay, must have had one of the infamous brain farts
Gordon,Gordon Bjorklund wrote:Just checking the fit of the major pieces on the Long Beach. So far so good.
Looking good so far! Slightly off topic, whatcha going to be doing with that 1/350 San Francisco in the background?
Mardis,gtbred wrote:a scratchbuild paper/plastic 1/350 carrier build.
Should be interesting, look forward to seeing it!
Pieter,Pieter wrote:Belknap taken out of its cylinder. Hull primed and some platforms removed using Navsource pictures from the early 1970's as reference.
Looking good already!
DrDoom,drdoom1337 wrote:My reply is quite image heavy, just a lot of seem filling on the deck and hull. Note that I am going to be using the wooden deck that is eventually available for this kit, so I have to wait awhile to test fit.
Good start to a large kit!
D-Boy,
I like the split personality of your builds for the 2 groups!
Go for pier side! It does add a lot to the appearance of life to the model. You could even have it where she is just finishing her fitting out, anyway you do it it should be interesting to see a North Carolina with twin 3-inch guns and some new kinds of radars.Cliffy B wrote:She'll be waterlined but I'm not sure if I'll have her pier side or underway. Suggestions?
Matt
In the yards right now:
USS Utah AG-16
On Hold
1/350 USS Portland CA-33 1942
1/350 Trumpeter Texas with a twist
USS Utah AG-16
On Hold
1/350 USS Portland CA-33 1942
1/350 Trumpeter Texas with a twist
- Gordon Bjorklund
- Posts: 960
- Joined: Sat Feb 26, 2005 7:32 pm
- Location: Seattle, Wa.
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
The minor fit problems have been noted and simple solutions will fix the problems.
D-Boy asked:
Gordon, did you anticipate this from the dry fit? Looked like it was fitting well at that stage. I have this kit in the stash, and will be taking notes from your build.
Yes, the dry fit showed this problem.
As noted before the block made up of parts C6 and C7 has some minor moulding problems. The upper piece C6 is the major problem where the edges between the two parts don't line up square and the three locating pins were cut off of C6 and that provided a better fit. Two layers of putty smoothed the two pieces and made for a flat surface.
The next picture shows that the radar panels cover up all the putty and that the corners are the real issue with the fit.
There is a small fit problem with the forward deck. This gap is almost completely covered by piece G23 and the small gaps should be taken care of with a little sanding. The gaps between the deck and the hull can also be filled with putty and then the railings actually go over the filled in gap. I removed the front locating pins on part G23 so I could sand the bottom of it for a better fit to the deck.
The only gap is the one between parts G23 and G25 because it is out in the open.
I removed the rear locating pins on part C18 so the bottom could be sanded for a better fit also.
That is the sum of the minor problems that I have run across.
April 20, 2011 One more fit problem found, this is between G23, G25 and the main deck. The problem is fixed with a little scrapping and sanding.
Be sure to check fit often.
April 22, 2011
Deck seam filled.
taskforce48 asked:
whatcha going to be doing with that 1/350 San Francisco in the background?
Matt, I would like to take it outside and just shoot it with a BB gun but I bought a GMM pe set for it and that would be a waist of good money. It now sits in the basement and every now and then I take it out of the box and work on it. Last week I worked on finishing up the hull and deck assembly and started on the bridge structure until I decided that there were too many fit problems and I put it back into the box untill the next time.
That's it for now.
D-Boy asked:
Gordon, did you anticipate this from the dry fit? Looked like it was fitting well at that stage. I have this kit in the stash, and will be taking notes from your build.
Yes, the dry fit showed this problem.
As noted before the block made up of parts C6 and C7 has some minor moulding problems. The upper piece C6 is the major problem where the edges between the two parts don't line up square and the three locating pins were cut off of C6 and that provided a better fit. Two layers of putty smoothed the two pieces and made for a flat surface.
The next picture shows that the radar panels cover up all the putty and that the corners are the real issue with the fit.
There is a small fit problem with the forward deck. This gap is almost completely covered by piece G23 and the small gaps should be taken care of with a little sanding. The gaps between the deck and the hull can also be filled with putty and then the railings actually go over the filled in gap. I removed the front locating pins on part G23 so I could sand the bottom of it for a better fit to the deck.
The only gap is the one between parts G23 and G25 because it is out in the open.
I removed the rear locating pins on part C18 so the bottom could be sanded for a better fit also.
That is the sum of the minor problems that I have run across.
April 20, 2011 One more fit problem found, this is between G23, G25 and the main deck. The problem is fixed with a little scrapping and sanding.
Be sure to check fit often.
April 22, 2011
Deck seam filled.
taskforce48 asked:
whatcha going to be doing with that 1/350 San Francisco in the background?
Matt, I would like to take it outside and just shoot it with a BB gun but I bought a GMM pe set for it and that would be a waist of good money. It now sits in the basement and every now and then I take it out of the box and work on it. Last week I worked on finishing up the hull and deck assembly and started on the bridge structure until I decided that there were too many fit problems and I put it back into the box untill the next time.
That's it for now.
Last edited by Gordon Bjorklund on Sat Jul 09, 2011 4:15 pm, edited 3 times in total.
Gordon
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
- Mark McKinnis
- Posts: 1612
- Joined: Fri Nov 24, 2006 7:30 pm
- Location: Cape Canaveral Florida
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Work has started on Hancock, CVA-19.
This is an ISW 700th scale SCB-27A kit of the Essex that I am converting into an SCB-27C Hancock. I got the deck from Nautilus and I started cutting on the aft starboard quarter to install the starboard elevator. There is a lot of re-work to be done there but it should not be a problem.
Here are a few shots of the bench. Salt Lake City, Oklahoma, and Tennesee are waiting for P.E.


This is an ISW 700th scale SCB-27A kit of the Essex that I am converting into an SCB-27C Hancock. I got the deck from Nautilus and I started cutting on the aft starboard quarter to install the starboard elevator. There is a lot of re-work to be done there but it should not be a problem.
Here are a few shots of the bench. Salt Lake City, Oklahoma, and Tennesee are waiting for P.E.


- ArizonaBB39
- Posts: 1321
- Joined: Sat Jan 08, 2005 7:29 pm
- Location: Tempe, Arizona
- Contact:
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Mark, looking good. Is that the Nevada sitting there next to Tennessee? Did I miss the build threads for these two ships? Keep up the good work.
- kidcurrie42
- Posts: 2586
- Joined: Tue Jun 28, 2005 1:24 pm
- Location: South Carolina
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Ok, i will build USS Midway 1971 period, i will post pics of the unstarted kit when i get batteries for cameram also need to start and finish USS Wasp CV-7 Pre War, have a show on 14 May.
Happy Modeling
John
Happy Modeling
John
Si Vis Pacem, Para Bellum
- Gordon Bjorklund
- Posts: 960
- Joined: Sat Feb 26, 2005 7:32 pm
- Location: Seattle, Wa.
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
This Cold War GB is shaping up quite nicely, we have carriers, battleships, crusiers, destroyers and whiffs. I look forward to seeing your in progress pictures with great anticipation. The more pictures you post the happier I'll be.
Gordon
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
"Then there was one patched-up carrier...."
Vice Admiral Thomas A. Kinkaid
- Mark McKinnis
- Posts: 1612
- Joined: Fri Nov 24, 2006 7:30 pm
- Location: Cape Canaveral Florida
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
ArizonaBB39 wrote:Mark, looking good. Is that the Nevada sitting there next to Tennessee? Did I miss the build threads for these two ships? Keep up the good work.
Nope! It is the Oklahoma. I am going to do the Nevada in her late war appearance. My goal is all of the U.S. Battleships starting with BB-32, all the U.S. CV's and one of each class of CVL's, CVE's, CA's,CG's, CGN's, CL's, DDG's and DD's. Basically a snapshot of the U.S. Navy from the 30's to present.
- Rowdy75
- Posts: 64
- Joined: Mon Oct 27, 2008 5:43 am
- Location: Central Queensland
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Would like to sign up for tis one too with a 1/700 Thphoon SSBN
- ArizonaBB39
- Posts: 1321
- Joined: Sat Jan 08, 2005 7:29 pm
- Location: Tempe, Arizona
- Contact:
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Doh! I should have checked my references, Nevada was White. Thats quite the goal, I'm looking forward to the pictures!Mark McKinnis wrote:ArizonaBB39 wrote:Mark, looking good. Is that the Nevada sitting there next to Tennessee? Did I miss the build threads for these two ships? Keep up the good work.
Nope! It is the Oklahoma. I am going to do the Nevada in her late war appearance. My goal is all of the U.S. Battleships starting with BB-32, all the U.S. CV's and one of each class of CVL's, CVE's, CA's,CG's, CGN's, CL's, DDG's and DD's. Basically a snapshot of the U.S. Navy from the 30's to present.
- Quincy
- Posts: 2217
- Joined: Fri Apr 08, 2005 9:41 am
- Location: Monson, MA.
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Great job so far you guys!!
Bob Pink.
Bob Pink.
- gtbred
- Posts: 2712
- Joined: Wed Jan 13, 2010 9:10 am
- Location: san francisco
Re: Cold War Era Group Build Apr.15-Oct.15, 2011
Tico keel has been laid.