Apart from smoothing I have added bilge keels, these were lengths of plastic shelf edging from B&Q, 67 pence per metre. The bulkheads have been cut away too. Here I am preparing to mark the waterline and boot top.
Ikara Leander
Moderators: MartinJQuinn, JIM BAUMANN, HMAS, Tiny69, Dave Wooley
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
Ikara Leander
With the first time off since before Christmas I took the opportunity to clean out the shed and dust off Naiad. Getting the hull smooth proved to be a real pain but eventually it started to look something like.

Apart from smoothing I have added bilge keels, these were lengths of plastic shelf edging from B&Q, 67 pence per metre. The bulkheads have been cut away too. Here I am preparing to mark the waterline and boot top.
Apart from smoothing I have added bilge keels, these were lengths of plastic shelf edging from B&Q, 67 pence per metre. The bulkheads have been cut away too. Here I am preparing to mark the waterline and boot top.
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
A fortuitous purchase for the Cabin Boy offered an opportunity too good to miss. The hull has been masked off and the lower have given a couple of coats of Red Oxide from the local pound shop.

It is not clear here but the hull is riding satisfactorilly high showing she can take plenty of weight yet, and proved stable even without ballast.
It is not clear here but the hull is riding satisfactorilly high showing she can take plenty of weight yet, and proved stable even without ballast.
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
The stabelisers have given me a bit of a quandry. The Jecobin plans show them in line with the Bilge Keels and rectangular, but do not indicate their length. The only reference photos I can find are of the Yarmouth which shows tapered stabelisers above the line of the bilge keels. But these were retro fitted when the Rothesay Class were adapted to take a helicopter so probably not typical for a Leander hull.
Racking my rum soused brain I decided to go with the plans for now and guestimate the length, ideally I need to get a look at a builders model.

Naiad goes back in the shed now to let the paint set hard before the final smoothing and then starting on the grey.
Racking my rum soused brain I decided to go with the plans for now and guestimate the length, ideally I need to get a look at a builders model.
Naiad goes back in the shed now to let the paint set hard before the final smoothing and then starting on the grey.
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
Meanwhile the pool was still available so I popped in the Dog Boat after sealing the leaks found around the rudder from the first test in the bath late last year. The little beast zipped along nicely using a lightweight 6V Nicad battery. I am concerned though that the boat is already at the waterline, more top hamper and a large battery may well take it too low, still it has cost me virtually nothing so far apart from the drive train so I will probably spare it the breakers yard just yet.

- treadhead1952
- Posts: 36
- Joined: Wed Jun 21, 2006 7:21 pm
- Location: Las Vegas, NV
- Contact:
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
Some scrap balsa to form the guides for the superstructure. Since I intend to have the hanger open I have used very thin pieces there.
I have drilled out the towing hole and the anchor holes, the anchor holes will be mated to the upperdeck holes with some tubing, otherwise I risk water ingress into the bow, likewise the towing hole.
I have started work on the removable Mortar and 199 well. The mortar well is a simple push fit, but I will shim the 199 well and surrounding hull with thin styrene, I am hoping a rub of silicon grease will make the result watertight in the event of going astern.
After some debate I have decided to construct the main body of the superstructure out of 1/8" ply, the same as the two wells, but I am out of it and back on my four day shift so it will have to wait while late next week.

Some trivia: When the Leander was designed in order to save topweight to allow the superstructure to be added to the basic Type 12 hull the diesels in the bow were moved down below the waterline forward of the Boiler Room, this was the food storage area on the Type 12. The freezers, fridges and storerooms were bumped up a deck to where the Officers cabins are on the Type 12 and the officers relocated to the new superstructure.
On the Type 12 and 12I the diesels vent from holes in the bow or from small stacks fitted on the focsul at anchor. On the Leander the foremast is a MACK (Mast And staCK), the diesels exhaust up through it.
I have drilled out the towing hole and the anchor holes, the anchor holes will be mated to the upperdeck holes with some tubing, otherwise I risk water ingress into the bow, likewise the towing hole.
I have started work on the removable Mortar and 199 well. The mortar well is a simple push fit, but I will shim the 199 well and surrounding hull with thin styrene, I am hoping a rub of silicon grease will make the result watertight in the event of going astern.
After some debate I have decided to construct the main body of the superstructure out of 1/8" ply, the same as the two wells, but I am out of it and back on my four day shift so it will have to wait while late next week.
Some trivia: When the Leander was designed in order to save topweight to allow the superstructure to be added to the basic Type 12 hull the diesels in the bow were moved down below the waterline forward of the Boiler Room, this was the food storage area on the Type 12. The freezers, fridges and storerooms were bumped up a deck to where the Officers cabins are on the Type 12 and the officers relocated to the new superstructure.
On the Type 12 and 12I the diesels vent from holes in the bow or from small stacks fitted on the focsul at anchor. On the Leander the foremast is a MACK (Mast And staCK), the diesels exhaust up through it.
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
Took me a while to find some suitable ply, none of the local lumber merchants stocked anything less than 4mm, in the end had to buy small sheets from a model shop in Wakefield, each cost as much as I normally pay for a 6x4 4mm sheet. Ouch.
I settled for 3/32" rather than 1/8" it can be cut with a knife and holds the shape well enough.

01 deck and the bridge base were simple enough but the hanger proved very fiddly, also puzzling, cannot recall what some of the bits are!
I settled for 3/32" rather than 1/8" it can be cut with a knife and holds the shape well enough.

01 deck and the bridge base were simple enough but the hanger proved very fiddly, also puzzling, cannot recall what some of the bits are!
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
- JIM BAUMANN
- Posts: 5689
- Joined: Mon Jan 10, 2005 5:30 pm
- Location: Nr Southampton England
despite having to share shed space with a freezer and a lawnmower...
progress looks good and rapid--I particularly liked the clear labelling of the superstructure componenets--very helpful and explanatory!
Will be watching this....
JIM Baumann
progress looks good and rapid--I particularly liked the clear labelling of the superstructure componenets--very helpful and explanatory!
Will be watching this....
JIM Baumann
....I buy them at three times the speed I build 'em.... will I live long enough to empty my stash...?
http://www.modelshipgallery.com/gallery ... index.html
IPMS UK SIG (special interest group) www.finewaterline.com
http://www.modelshipgallery.com/gallery ... index.html
IPMS UK SIG (special interest group) www.finewaterline.com
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
I would settle for a Cheesey Hammy Eggy, but nuts if I can remember how they were made, any chefs on line?
Anyway, back on shift so I have had time to do some research on my puzzling lump, I thought it might be an ATU (Air Transfer Unit) as I have some vague recollection of a lump of machinary overhead in the the 1J access lobby (starboard side of the hanger). But plans cannot tell you everything, here is a shot of an original fit Leander.

Note the royal showoff standing in for me! The lump is actually the base of the Seacat Director.

But on the Ikara conversion the lump remains even after the director is removed, but unless my eyes are playing tricks those are now vents on the aft face of the lump, so either an ATU or engine room uptake. Either way, time to ponder making some grills.
Anyway, back on shift so I have had time to do some research on my puzzling lump, I thought it might be an ATU (Air Transfer Unit) as I have some vague recollection of a lump of machinary overhead in the the 1J access lobby (starboard side of the hanger). But plans cannot tell you everything, here is a shot of an original fit Leander.

Note the royal showoff standing in for me! The lump is actually the base of the Seacat Director.

But on the Ikara conversion the lump remains even after the director is removed, but unless my eyes are playing tricks those are now vents on the aft face of the lump, so either an ATU or engine room uptake. Either way, time to ponder making some grills.
-
middle_watch
- Posts: 344
- Joined: Tue Aug 09, 2005 7:00 am
- Location: S Yorks, England
Here we go, back on shift, 2 days and 2 nights before I can get back to the shipyard. Managed to forget the photos, will sort some out tonight.
I have been working on the detail around 01 deck on the hanger, I wanted to try litho instead of styrene, but unable to source any I tried using the thick foil from the base of an Aberdeen Angus pie we scoffed last week. Worked really well except it proved difficult to glue, I normally use a thick slow acting super glue but this formed a bubble on the foil and fine detail like hinges slid away. A general purpose adhesive did not seem able to hold down the edges. I will have to try a thin super glue.
My plans are very vague about the area, showing just anonymous rectangles which I take to be access hatches, I seem to recall there was often a lot of activity in that area cleaning filters when the sun was out. Due to the overshadowed nature of the deck I have no decent reference photos.
I have been working on the detail around 01 deck on the hanger, I wanted to try litho instead of styrene, but unable to source any I tried using the thick foil from the base of an Aberdeen Angus pie we scoffed last week. Worked really well except it proved difficult to glue, I normally use a thick slow acting super glue but this formed a bubble on the foil and fine detail like hinges slid away. A general purpose adhesive did not seem able to hold down the edges. I will have to try a thin super glue.
My plans are very vague about the area, showing just anonymous rectangles which I take to be access hatches, I seem to recall there was often a lot of activity in that area cleaning filters when the sun was out. Due to the overshadowed nature of the deck I have no decent reference photos.
- largeallan
- Posts: 107
- Joined: Thu May 11, 2006 7:00 pm
- Location: Ayr, On Scotland's sunshine coast