I didn't think they were actually laid down? As Werner says, the decision to suspend them was very soon after the original order.Laurence Batchelor wrote:
One interesting fact about the G3's was all four were actually laid down and some materials for their construction were actually stockpiled by their slipways. They were quite close to being built, hence why at the Brass Foudry I was able to locate full GA sheets for them, whereas the N3's and other designs of the time I could not.
Cheers
LB
Rob
IPMS Fine Waterline Special Interest Group
- Laurence Batchelor
- Posts: 1376
- Joined: Sun Jan 23, 2005 6:20 am
- Location: Warwickshire, England
Sorry Rob, Werner & Jorit I forgot to proof read what I typied, I omitted the words 'close to being' between actually and laid down in the above qoute.
That will teach me to write things quickly!
I've read advanced contracts were placed for forgings and castings and material was gathered at a slipway.
The sheets I've seen at the NMM are the ones that would have been given to Swan Hunter, Beardmore, Fairfield or John brown to begin ordering, sub-contracting and construction for these ships.
I believe the orders with the shipbuilding firms was not cancelled until Feb 1922, although construction was stopped in November 1921 to await the outcome of Washington.
Once the outcomes of that was known, only then was the material gathered dispersed with or recycled by the shipbuilding firms.
Although the official orders were placed only 1 month before they were put on hold (October-November 1921) I feel these shipbuilding firms would have known sooner than October that their estimates had been accepted and that is why I believe the state of construction for the G3's was more advanced than one would expect after only 1 month.
Normally it takes a while for the Treasury and the Admiralty to draw up the appropriate paperwork etc.
I've found from my studies of the WWI armaments industry (Which includes contracts placed with private industry by the Admiralty, War Office, Ministry of Munitions, Air Ministry etc) that often these things were communicated via telephone many months before official contracts were drawn up.
This was vital so the contracting firm could get labour, machinery and their sub-contract orders in at the earliest opportunity.
Advanced orders, as was usual with large calibre guns, were also placed with the armament firms, alhough I'm not sure how far they got with their orders.
Once again my apologies for the confusion I hope I've now made my position clear this time.
That will teach me to write things quickly!
I've read advanced contracts were placed for forgings and castings and material was gathered at a slipway.
The sheets I've seen at the NMM are the ones that would have been given to Swan Hunter, Beardmore, Fairfield or John brown to begin ordering, sub-contracting and construction for these ships.
I believe the orders with the shipbuilding firms was not cancelled until Feb 1922, although construction was stopped in November 1921 to await the outcome of Washington.
Once the outcomes of that was known, only then was the material gathered dispersed with or recycled by the shipbuilding firms.
Although the official orders were placed only 1 month before they were put on hold (October-November 1921) I feel these shipbuilding firms would have known sooner than October that their estimates had been accepted and that is why I believe the state of construction for the G3's was more advanced than one would expect after only 1 month.
Normally it takes a while for the Treasury and the Admiralty to draw up the appropriate paperwork etc.
I've found from my studies of the WWI armaments industry (Which includes contracts placed with private industry by the Admiralty, War Office, Ministry of Munitions, Air Ministry etc) that often these things were communicated via telephone many months before official contracts were drawn up.
This was vital so the contracting firm could get labour, machinery and their sub-contract orders in at the earliest opportunity.
Advanced orders, as was usual with large calibre guns, were also placed with the armament firms, alhough I'm not sure how far they got with their orders.
Once again my apologies for the confusion I hope I've now made my position clear this time.
Last edited by Laurence Batchelor on Thu Sep 20, 2007 4:05 pm, edited 1 time in total.
- Werner
- Posts: 2299
- Joined: Mon Jan 10, 2005 1:10 am
- Location: (42.24,-87.81)
I think we'll let you live.Laurence Batchelor wrote: Once again my apologies for the confusion I hope I've now made my position clear this time.
You can park your G3s next to my Des Moines....
If an unfriendly power had attempted to impose on America the mediocre educational performance that exists today, we might well have viewed it as an act of war.
-- "A Nation at Risk" (1983)
-- "A Nation at Risk" (1983)
-
Guest
- Werner
- Posts: 2299
- Joined: Mon Jan 10, 2005 1:10 am
- Location: (42.24,-87.81)
That strikes me to the quick. I shall now be in a blue funk all day.Chuck wrote:He would have to park a little bit of G3 next to each packet of razor blades sold in your neighborhood Walgreens, then.
![]()
![]()
If an unfriendly power had attempted to impose on America the mediocre educational performance that exists today, we might well have viewed it as an act of war.
-- "A Nation at Risk" (1983)
-- "A Nation at Risk" (1983)
-
Roger T
- Posts: 89
- Joined: Fri Mar 25, 2005 3:03 pm
- Location: London, England
Hi Laurence - John Roberts in AOTS The Battlecruiser Hood [third impression, p.8] lists the Admirals as...Laurence Batchelor wrote:It is new information to me that one of the 1916 Admiral class battlecruisers was to be named Anson.
Please can you point me to the source of your information, either published or archival I'm intrigued?
Hood, ordered from John Brown
Howe, ordered from Cammell Laird
Rodney, ordered from Fairfield
Anson, ordered from Armstrongs
...the first three all being ordered on the same day in April 1916, and Anson being ordered in July 1916.
"Religion is regarded by the common people as true, by the wise as false, and by the rulers as useful." Seneca, 1st century AD
- Laurence Batchelor
- Posts: 1376
- Joined: Sun Jan 23, 2005 6:20 am
- Location: Warwickshire, England
-
Mitrich
Note that those afore-mentioned plans of G3 form NMM are labeled as "1921-1922 capital ship" and not as "battlecruiser", which makes me think that there was no real intention to build N3 class. Furthermore, as I learnt from correspondence with people from NMM, there are no plans of N3 at the Brass Foundry because this class has never left a sketch stage, so I was recommended to search MOD archives for the sketches.
And there is no "as fitted" label on my set of plans of G3.
And there is no "as fitted" label on my set of plans of G3.
-
Mitrich
Or may reflect what G3 was meant to be - too fast for a battleship and too powerful for a battlecruiser. Germans also labelled their last designs of 1918 as Grosskampfshiffe - http://www.dreadnoughtproject.org/plans ... 100dpi.jpg
-
ar
The plans of the N3 and other Battleships of the time frame that I found , that were re-drawn ad placed in British Battleships by R&R are held not in the MOD but in the PRO.Mitrich wrote:Note that those afore-mentioned plans of G3 form NMM are labeled as "1921-1922 capital ship" and not as "battlecruiser", which makes me think that there was no real intention to build N3 class. Furthermore, as I learnt from correspondence with people from NMM, there are no plans of N3 at the Brass Foundry because this class has never left a sketch stage, so I was recommended to search MOD archives for the sketches.
And there is no "as fitted" label on my set of plans of G3.
- Laurence Batchelor
- Posts: 1376
- Joined: Sun Jan 23, 2005 6:20 am
- Location: Warwickshire, England
You could also look into how advanced the 18-inch mountings were to determine were the Admiralty was with the N3's.Mitrich wrote:Note that those afore-mentioned plans of G3 form NMM are labeled as "1921-1922 capital ship" and not as "battlecruiser", which makes me think that there was no real intention to build N3 class. Furthermore, as I learnt from correspondence with people from NMM, there are no plans of N3 at the Brass Foundry because this class has never left a sketch stage, so I was recommended to search MOD archives for the sketches.
Raven & Roberts research as well as Campbell's suggests to me the N3 design was very advanced.
D K Brown in a conversation with me considered both G3 & N3 were virtually there, apart from minor details.
I would also suggest that I do not consider the G3's as battlecruisers, merely fast battleships following Hood's 1918-20 lead.
I'm not sure which MoD archives would hold such material and that NMM advice sounds a red herring.
To my mind only the NMM or NA would hold such plans if they existed.
The only other things which might come to light are more sketches possibly in constructors notebooks, some of which are in the British Library.
Here's some of the things ar is talking about he saw many decades ago in the National Archives:
http://www.nationalarchives.gov.uk/cata ... mage1.y=14
No they are General Arrangement drawings, although having a rig plan suggests again to me the design was mature.Mitrich wrote:And there is no "as fitted" label on my set of plans of G3.
Last edited by Laurence Batchelor on Wed Oct 31, 2007 12:52 pm, edited 1 time in total.
-
Guest
I think in the context of 1920 it was still reasonable to classify a ship as either a battleship or a battlecreuiser according to her intended deployment, rather than superficial comparison of weight of armor. If G-3 were intended to operate as a screen breaker, but capable of withstanding the fire of enemy screen breakers, than however heavily armored, she was a battlecruiser. If G-3 were primarily intended to operate in close tactical corporation with the N-3 during the actual battleline engagement, then she was a battleship.
It is possible that an heavily armored screen breaker could rejoin tha battlefleet during the main battleline engagement in actuality, but it is probably unwise to assume any strike breaker that has heavily engaged with enemy battlecruisers will automatically still be available and fit to stand in the main fleet battle, however heavily armed. So even if it is true that an heavily armored screen breaker can stand in line of battle, one could still distinguish a battleship from a battlecruiser by whether the battlefleet itself is intended to be able to stand and fight successfully without the contribution of these ships, thus freeing these ships to fight to the finish in the screen breaking role should the need arise, or whether these ships, even if initially committed to screen breaking role, they were still expected to comport themselves in such a way as to preserve themselves for rejoining the main battleline.
It is possible that an heavily armored screen breaker could rejoin tha battlefleet during the main battleline engagement in actuality, but it is probably unwise to assume any strike breaker that has heavily engaged with enemy battlecruisers will automatically still be available and fit to stand in the main fleet battle, however heavily armed. So even if it is true that an heavily armored screen breaker can stand in line of battle, one could still distinguish a battleship from a battlecruiser by whether the battlefleet itself is intended to be able to stand and fight successfully without the contribution of these ships, thus freeing these ships to fight to the finish in the screen breaking role should the need arise, or whether these ships, even if initially committed to screen breaking role, they were still expected to comport themselves in such a way as to preserve themselves for rejoining the main battleline.
- Werner
- Posts: 2299
- Joined: Mon Jan 10, 2005 1:10 am
- Location: (42.24,-87.81)
He means a ship or ships which will charge through the enemy's cruiser van and reconnoiter the enemy's disposition. Such a ship might then approach train or perhaps the carrier to wreck the enemy's ability to spot fall of shot.JWintjes wrote:Chuck, what is a "strike breaker"?
If an unfriendly power had attempted to impose on America the mediocre educational performance that exists today, we might well have viewed it as an act of war.
-- "A Nation at Risk" (1983)
-- "A Nation at Risk" (1983)
- MartinJQuinn
- Posts: 8589
- Joined: Tue Jan 11, 2005 1:40 pm
- Location: New Jersey
How cute, you and Chuck finish each other's thoughts now!Werner wrote:He means a ship or ships which will charge through the enemy's cruiser van and reconnoiter the enemy's disposition. Such a ship might then approach train or perhaps the carrier to wreck the enemy's ability to spot fall of shot.JWintjes wrote:Chuck, what is a "strike breaker"?
Martin
"Tomorrow is the most important thing in life. Comes into us at midnight very clean. It's perfect when it arrives and it puts itself in our hands. It hopes we've learned something from yesterday." John Wayne
Ship Model Gallery
"Tomorrow is the most important thing in life. Comes into us at midnight very clean. It's perfect when it arrives and it puts itself in our hands. It hopes we've learned something from yesterday." John Wayne
Ship Model Gallery
- Werner
- Posts: 2299
- Joined: Mon Jan 10, 2005 1:10 am
- Location: (42.24,-87.81)