1/144 Kiev by Dave Wooley

Fully Documented builds that have been completed and moved from the Online Scratchbuild section.

Moderators: MartinJQuinn, JIM BAUMANN, HMAS, Tiny69, Dave Wooley

User avatar
johndon
Posts: 1034
Joined: Mon Jan 10, 2005 3:39 pm
Location: Newcastle Upon Tyne, England

Re: Dave's Kiev

Post by johndon »

Great work Dave :thumbs_up_1:

John
User avatar
nick
Posts: 832
Joined: Tue May 29, 2007 2:23 am
Location: Queen City of the South - Cebu City, Philippines
Contact:

Re: Dave's Kiev

Post by nick »

Amazing! :thumbs_up_1:
Nichol Caballero
Civil Engineer and Ship Enthusiast
User avatar
gtb -red
Posts: 1612
Joined: Thu Dec 14, 2006 8:06 pm
Location: SAN FRANCISCO CA.

Re: Dave's Kiev

Post by gtb -red »

Man I wish I could build like that!
User avatar
J. Soca
Posts: 2161
Joined: Sun Dec 03, 2006 5:36 pm
Location: About 50 miles away from the Gulf of Mexico ( traveling W is you do so :)

Re: Dave's Kiev

Post by J. Soca »

Amazing work Dave :thumbs_up_1: :thumbs_up_1: , all about museum quality here :thumbs_up_1: :good_job:
User avatar
Avery Boyer
Posts: 934
Joined: Mon Apr 24, 2006 4:56 pm
Location: Berks County, Pennsylvania
Contact:

Re: Dave's Kiev

Post by Avery Boyer »

Fantastic work! :thumbs_up_1:
"It is best to remain silent and let others assume you are dumb than to speak up and remove all doubt"

http://nssavannah.wordpress.com/
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

As mentioned there are many small fittings needing to be made .
This set goes under the Nato code of Tee Plinth .
Both Kiev and Minsk are fitted with �Tee Plinth� in effect a television sensor array .
This is made up from 1.5mm styrene and aluminium tube.
Image
The assembled Tee Plinth sensor.
Image
Tee Plinth is mounted on the lower platform just above the deck .
Image
Next the construction and soldering of the �lattice spars�
Dave Wooley
User avatar
Reid
Posts: 436
Joined: Thu Jul 13, 2006 6:03 pm
Location: SoCal

Re: Dave's Kiev

Post by Reid »

HOLY COW!!! soooo much detail!! great job!!
Reid, PIO of the 48th Fleet
http://www.48thfleet.com
User avatar
Avery Boyer
Posts: 934
Joined: Mon Apr 24, 2006 4:56 pm
Location: Berks County, Pennsylvania
Contact:

Re: Dave's Kiev

Post by Avery Boyer »

:thumbs_up_1: :thumbs_up_1:
"It is best to remain silent and let others assume you are dumb than to speak up and remove all doubt"

http://nssavannah.wordpress.com/
User avatar
Neptune
Posts: 2466
Joined: Sun Mar 13, 2005 11:51 am
Location: Belgium

Re: Dave's Kiev

Post by Neptune »

Very cool, it really looks like a Kiev now! Hard to find any errors, if you left it like this, I doubt anyone would find out wether you forgot something or not!

Great solution for the tee plinth! Museum quality for sure!
The merchant shipyard
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Thank you all for your kind comments . Just for the record "Tee Plinth" was replaced by "Tin Man" on the Novorossiysk. Unlike Tee Plinth, Tin man incorporated a lazar range finding device. During the course of research on Kiev I became aware just how different each of the Kiev's were and that's not including Gorshkov. The differences were minor but many. :thumbs_up_1: :thumbs_up_1:
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

The next stage involved soldering up the lattice spar frame work
that extends from either side of the stack . This was cut to size
from 0.31mm and 0.4mm brass wire
Image
The main spar was soldered first
Image
Each main section prepared
Image
Soldering up the upper horizontal �V� frame which supports two vertical aerials
Image
Aerials and spacer bar in place.
Image
The two separate section ready to be fitted to the stack.
Image
One of two separate extended aerials that also fit to the rear and each side of the stack.
Image
Dave Wooley
User avatar
gtb -red
Posts: 1612
Joined: Thu Dec 14, 2006 8:06 pm
Location: SAN FRANCISCO CA.

Re: Dave's Kiev

Post by gtb -red »

My GOD man how do you do that! :big_grin: :wave_1:
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

gtb -red wrote:My GOD man how do you do that! :big_grin: :wave_1:
All the soldering is done by using a variable heat electronic soldering iron with a fine bit.
Dave Wooley
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Supports for power cable feeds leading to the lattice frame .
Image
Supports being fitted to the side of the stack.
Image
One of the two lattice spars located into the stack.
Image

The �V� frame temporarily in position atop of the lattice spar.
Image
One of two aerials also set into place.
Image
The two lattice spars in place. These have yet to be trimmed
to size within the stack . As these two spars are rather fragile
they will be removed , cleaned up and put in the fittings box
ready to be fitted at a later date as other work needs to be
undertaken in the same area.
Image
For the moment all the arrays will be placed in position to
give a overall view of the progress thus far and in many ways
it shows how much progress has been made but on the flip side it shows
how much needs to be done just concentrating on the island superstructure.
More cable work, more aerials , rails, after missile launcher and gun
mounting and that�s before it sees a coat of paint.
Image
I think it was some Chinese sage that stated , �It�s not so much
arriving at the destination but the journey that counts�? or words
to that effect. Some journey ?
Image
Next time the after deck housing for the SA-N-3
and the 76.2mm twin . Dave Wooley :wave_1:
grumpyoldbrit
Posts: 2
Joined: Mon Oct 15, 2007 12:53 pm

Re: Dave's Kiev

Post by grumpyoldbrit »

I hate you!!! :big_grin: with a vengance.
please keep up the good work
colin
User avatar
desron48
Posts: 178
Joined: Sun Sep 23, 2007 9:22 pm

Re: Dave's Kiev

Post by desron48 »

dave......this build is the most inspiring MAKES ME WANT TO get off my duff and match that..... :thumbs_up_1: .....joe
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Thanks guys . Although fitted with a single large island superstructure the Soviets seemed to pack so much into this structure. Yet I still remain puzzled as to why it had to be so large?
Dave Wooley
User avatar
ARH
Posts: 2557
Joined: Mon Jan 10, 2005 10:52 am
Location: Land of the Cheshire cat

Re: Dave's Kiev

Post by ARH »

Inpressive as usual ,Dave :thumbs_up_1: :thumbs_up_1:
Simple but effective.
User avatar
Dave Wooley
Posts: 4131
Joined: Sat Jan 22, 2005 10:18 am
Location: Liverpool

Re: Dave's Kiev

Post by Dave Wooley »

Hi Ron GREAT to hear from you . Your well and truly on the mend . :woo_hoo:
Dave Wooley
User avatar
jgrease
Posts: 363
Joined: Sat Sep 30, 2006 9:30 pm
Location: Richmond TX

Re: Dave's Kiev

Post by jgrease »

It had to be large because of Soviet technology. Remember when the pilot defected to Japan with a Mig-25 and they found this "state of the art" fighter was loaded with '60s electronics? Same idea here. That stack probably vents heat from all of the vacuum tubes inside... :big_grin:
Great work as always Dave. :thumbs_up_1: :thumbs_up_1:
Post Reply

Return to “Completed Builds [Fully documented]”