John
1/144 Kiev by Dave Wooley
Moderators: MartinJQuinn, JIM BAUMANN, HMAS, Tiny69, Dave Wooley
- johndon
- Posts: 1034
- Joined: Mon Jan 10, 2005 3:39 pm
- Location: Newcastle Upon Tyne, England
Re: Dave's Kiev
Great work Dave
John
John
- nick
- Posts: 832
- Joined: Tue May 29, 2007 2:23 am
- Location: Queen City of the South - Cebu City, Philippines
- Contact:
- gtb -red
- Posts: 1612
- Joined: Thu Dec 14, 2006 8:06 pm
- Location: SAN FRANCISCO CA.
Re: Dave's Kiev
Man I wish I could build like that!
- J. Soca
- Posts: 2161
- Joined: Sun Dec 03, 2006 5:36 pm
- Location: About 50 miles away from the Gulf of Mexico ( traveling W is you do so :)
Re: Dave's Kiev
Amazing work Dave
, all about museum quality here

- Avery Boyer
- Posts: 934
- Joined: Mon Apr 24, 2006 4:56 pm
- Location: Berks County, Pennsylvania
- Contact:
Re: Dave's Kiev
Fantastic work! 
"It is best to remain silent and let others assume you are dumb than to speak up and remove all doubt"
http://nssavannah.wordpress.com/
http://nssavannah.wordpress.com/
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
As mentioned there are many small fittings needing to be made .
This set goes under the Nato code of Tee Plinth .
Both Kiev and Minsk are fitted with �Tee Plinth� in effect a television sensor array .
This is made up from 1.5mm styrene and aluminium tube.

The assembled Tee Plinth sensor.

Tee Plinth is mounted on the lower platform just above the deck .

Next the construction and soldering of the �lattice spars�
Dave Wooley
This set goes under the Nato code of Tee Plinth .
Both Kiev and Minsk are fitted with �Tee Plinth� in effect a television sensor array .
This is made up from 1.5mm styrene and aluminium tube.

The assembled Tee Plinth sensor.

Tee Plinth is mounted on the lower platform just above the deck .

Next the construction and soldering of the �lattice spars�
Dave Wooley
- Reid
- Posts: 436
- Joined: Thu Jul 13, 2006 6:03 pm
- Location: SoCal
Re: Dave's Kiev
HOLY COW!!! soooo much detail!! great job!!
Reid, PIO of the 48th Fleet
http://www.48thfleet.com
http://www.48thfleet.com
- Avery Boyer
- Posts: 934
- Joined: Mon Apr 24, 2006 4:56 pm
- Location: Berks County, Pennsylvania
- Contact:
Re: Dave's Kiev
"It is best to remain silent and let others assume you are dumb than to speak up and remove all doubt"
http://nssavannah.wordpress.com/
http://nssavannah.wordpress.com/
- Neptune
- Posts: 2466
- Joined: Sun Mar 13, 2005 11:51 am
- Location: Belgium
Re: Dave's Kiev
Very cool, it really looks like a Kiev now! Hard to find any errors, if you left it like this, I doubt anyone would find out wether you forgot something or not!
Great solution for the tee plinth! Museum quality for sure!
Great solution for the tee plinth! Museum quality for sure!
The merchant shipyard
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Thank you all for your kind comments . Just for the record "Tee Plinth" was replaced by "Tin Man" on the Novorossiysk. Unlike Tee Plinth, Tin man incorporated a lazar range finding device. During the course of research on Kiev I became aware just how different each of the Kiev's were and that's not including Gorshkov. The differences were minor but many.
Dave Wooley
Dave Wooley
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
The next stage involved soldering up the lattice spar frame work
that extends from either side of the stack . This was cut to size
from 0.31mm and 0.4mm brass wire

The main spar was soldered first

Each main section prepared

Soldering up the upper horizontal �V� frame which supports two vertical aerials

Aerials and spacer bar in place.

The two separate section ready to be fitted to the stack.

One of two separate extended aerials that also fit to the rear and each side of the stack.
Dave Wooley
that extends from either side of the stack . This was cut to size
from 0.31mm and 0.4mm brass wire

The main spar was soldered first

Each main section prepared

Soldering up the upper horizontal �V� frame which supports two vertical aerials

Aerials and spacer bar in place.

The two separate section ready to be fitted to the stack.

One of two separate extended aerials that also fit to the rear and each side of the stack.
Dave Wooley
- gtb -red
- Posts: 1612
- Joined: Thu Dec 14, 2006 8:06 pm
- Location: SAN FRANCISCO CA.
Re: Dave's Kiev
My GOD man how do you do that!

- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
All the soldering is done by using a variable heat electronic soldering iron with a fine bit.gtb -red wrote:My GOD man how do you do that!![]()
Dave Wooley
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Supports for power cable feeds leading to the lattice frame .
Supports being fitted to the side of the stack.

One of the two lattice spars located into the stack.
The �V� frame temporarily in position atop of the lattice spar.

One of two aerials also set into place.

The two lattice spars in place. These have yet to be trimmed
to size within the stack . As these two spars are rather fragile
they will be removed , cleaned up and put in the fittings box
ready to be fitted at a later date as other work needs to be
undertaken in the same area.

For the moment all the arrays will be placed in position to
give a overall view of the progress thus far and in many ways
it shows how much progress has been made but on the flip side it shows
how much needs to be done just concentrating on the island superstructure.
More cable work, more aerials , rails, after missile launcher and gun
mounting and that�s before it sees a coat of paint.

I think it was some Chinese sage that stated , �It�s not so much
arriving at the destination but the journey that counts�? or words
to that effect. Some journey ?

Next time the after deck housing for the SA-N-3
and the 76.2mm twin . Dave Wooley
Supports being fitted to the side of the stack.

One of the two lattice spars located into the stack.
The �V� frame temporarily in position atop of the lattice spar.

One of two aerials also set into place.

The two lattice spars in place. These have yet to be trimmed
to size within the stack . As these two spars are rather fragile
they will be removed , cleaned up and put in the fittings box
ready to be fitted at a later date as other work needs to be
undertaken in the same area.

For the moment all the arrays will be placed in position to
give a overall view of the progress thus far and in many ways
it shows how much progress has been made but on the flip side it shows
how much needs to be done just concentrating on the island superstructure.
More cable work, more aerials , rails, after missile launcher and gun
mounting and that�s before it sees a coat of paint.

I think it was some Chinese sage that stated , �It�s not so much
arriving at the destination but the journey that counts�? or words
to that effect. Some journey ?

Next time the after deck housing for the SA-N-3
and the 76.2mm twin . Dave Wooley
-
grumpyoldbrit
- Posts: 2
- Joined: Mon Oct 15, 2007 12:53 pm
Re: Dave's Kiev
I hate you!!!
with a vengance.
please keep up the good work
colin
please keep up the good work
colin
- desron48
- Posts: 178
- Joined: Sun Sep 23, 2007 9:22 pm
Re: Dave's Kiev
dave......this build is the most inspiring MAKES ME WANT TO get off my duff and match that.....
.....joe
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Thanks guys . Although fitted with a single large island superstructure the Soviets seemed to pack so much into this structure. Yet I still remain puzzled as to why it had to be so large?
Dave Wooley
Dave Wooley
- ARH
- Posts: 2557
- Joined: Mon Jan 10, 2005 10:52 am
- Location: Land of the Cheshire cat
- Dave Wooley
- Posts: 4131
- Joined: Sat Jan 22, 2005 10:18 am
- Location: Liverpool
Re: Dave's Kiev
Hi Ron GREAT to hear from you . Your well and truly on the mend .
Dave Wooley
Dave Wooley
- jgrease
- Posts: 363
- Joined: Sat Sep 30, 2006 9:30 pm
- Location: Richmond TX
Re: Dave's Kiev
It had to be large because of Soviet technology. Remember when the pilot defected to Japan with a Mig-25 and they found this "state of the art" fighter was loaded with '60s electronics? Same idea here. That stack probably vents heat from all of the vacuum tubes inside...
Great work as always Dave.

Great work as always Dave.