WIP - 1/350 USS Lexington (CV-2)
Moderators: BB62vet, MartinJQuinn, JIM BAUMANN, Jon, Dan K
- smithec
- Posts: 46
- Joined: Tue Feb 17, 2009 11:30 am
- Location: United Kingdom
- Contact:
Re: WIP - 1/350 USS Lexington (CV-2)
Hi Jim
Nice work coming on here. But not sure about your radar cabin on front of stack. I modelled mine on photos of Lex and Saratoga. I don't believe it should have windows, and I am certain the Trumpy shape is all to cock.
Nice work coming on here. But not sure about your radar cabin on front of stack. I modelled mine on photos of Lex and Saratoga. I don't believe it should have windows, and I am certain the Trumpy shape is all to cock.
Regards, Chris
"When there is nothing but ambiguity and hard evidence is lacking, trust your judgement, instincts and hunches."
Diana McLain Smith
"When there is nothing but ambiguity and hard evidence is lacking, trust your judgement, instincts and hunches."
Diana McLain Smith
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
As with many other things on this kit I agree. What I did was cut the back of the structure, as it seemed way too long, recut it to fit, filled the windows, and then installed it. The white you see is the filler. I later added the access door on the roof as you did and also the braces underneath. Right now I'm in Albuquerque with my fiance so nothing is getting done other than me watching the forum and how others are progressing.smithec wrote:Hi Jim
Nice work coming on here. But not sure about your radar cabin on front of stack. I modelled mine on photos of Lex and Saratoga. I don't believe it should have windows, and I am certain the Trumpy shape is all to cock.
James
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Just a few words to let you know I haven't passed into the great beyond but the wedding happened last week in Sedona and now it's taking all my time to get everything ready for the move. But it will continue.
- MartinJQuinn
- Posts: 8649
- Joined: Tue Jan 11, 2005 1:40 pm
- Location: New Jersey
Re: WIP - 1/350 USS Lexington (CV-2)
Glad to hear! 
Martin
"Tomorrow is the most important thing in life. Comes into us at midnight very clean. It's perfect when it arrives and it puts itself in our hands. It hopes we've learned something from yesterday." John Wayne
Ship Model Gallery
"Tomorrow is the most important thing in life. Comes into us at midnight very clean. It's perfect when it arrives and it puts itself in our hands. It hopes we've learned something from yesterday." John Wayne
Ship Model Gallery
-
Cliff Arnold
Re: WIP - 1/350 USS Lexington (CV-2)
I remember visiting your home in L.V. and I'm still impressed with that small table you used to work on ! You do such great work on it ? I'm now looking for a bigger house !
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Finally made the move to Albuquerque and my butt is dragging.Four days of packing and loading the truck in Vegas, then the drive after a short nights sleep, then the unloading and putting some stuff in storage, then merging our stuff to make it one. My model table is at least in place but no room for the shelves I had so I'll have to make something to fit on the table itself and give me hanging space and a couple of shelves. Right now it's covered with boxes of books. Not long now to actually working on it again though.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Heeeelp! I'm finally able to work again but my favorite photo editor, Picnik, has vanished into Google. I found it but it's now very clunky and awkward besides being designed for facebook, twitter, or whatever. Does anyone know of a similar program somewhere online. I've tried a few and do not like them or get lost.
Any suggestions would be appreciated.
James
Any suggestions would be appreciated.
James
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Finally! Back at work. Anyway I was looking closely at the latest pics from the Lex CASF thread and trying to make my bridge look like it was then. I had already closed in the front of the director platform for the radar room but the opening left was too small and the back window was too big.
First I carved and filed it to what looked right. Then it was put in some stock to raise the sill on the rear window and then clear away the back side and add more at the front. I think it looks pretty close.
Then I noticed the spacing between flag plot and the director platform were off. Too close and no gap between the director and platform. So those were cut back necessitating the braces be smaller so that's where I am now.
No pics of this part yet but I did find another editor online so now can roll on.
Along the way I got to looking at the masts supporting the different levels. I had originally put in three round ones although the forward center one was square or rectangular. It bugged me and since I also noticed I had the splinter mattresses too low and needed to cut them back, and then the braces underneath were too low and also needed altering now was the time.
I removed the fighting top and the flagpole support channel and made encasements out of .010 stock. Now I have the top to put back on.
First I carved and filed it to what looked right. Then it was put in some stock to raise the sill on the rear window and then clear away the back side and add more at the front. I think it looks pretty close.
Then I noticed the spacing between flag plot and the director platform were off. Too close and no gap between the director and platform. So those were cut back necessitating the braces be smaller so that's where I am now.
No pics of this part yet but I did find another editor online so now can roll on.
Along the way I got to looking at the masts supporting the different levels. I had originally put in three round ones although the forward center one was square or rectangular. It bugged me and since I also noticed I had the splinter mattresses too low and needed to cut them back, and then the braces underneath were too low and also needed altering now was the time.
I removed the fighting top and the flagpole support channel and made encasements out of .010 stock. Now I have the top to put back on.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Ok. I'm just going to post a few pics and get caught up.
First all the stuff I took off to access and make changes and then how it looks after a coat of primer. Not really necessary at this time but I needed to see it as a whole more or less and was tired of all the bits and pieces that were added.
First all the stuff I took off to access and make changes and then how it looks after a coat of primer. Not really necessary at this time but I needed to see it as a whole more or less and was tired of all the bits and pieces that were added.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Trying to get the bridge structure all in shape as I want to paint it and see how the darker colors from the Pearl refit look and also get the deck color on before I put the director and other stuff on and block access to the decks. Anyway at one time I had the railings on that I show here but had not done them correctly, letting them change at the shape of the deck without any regard to stanchions. Now they have stanchions at every turn. Took a lot more pieces but it's worth it I think.
And as I looked at the second pic I can see the top rail on one corner is off but that's a minor adjustment.
And as I looked at the second pic I can see the top rail on one corner is off but that's a minor adjustment.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Well I wanted something to lift my spirits and I think this did it. Finally, after all the different changes, here's something that looks complete. It isn't really but it's close. I had to remove those three pieces of railing I just put on because I couldn't get a paint brush in the space to put deck blue on. The fighting top and 8" director are just sitting in place too but it's OK.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I've been pushing on the bridge section and it's pretty close to done but I needed a break so I went back to the hull and am finishing the work I started on moving the fairleads so they are outside the splinter shields. I had done the forward starboard ones but had not done the others so it was rip off the splinter shielding where necessary, remove the fairleads, fill as necessary, and reinstall the fairleads at the deck edge. Now I have to reinstall splinter shields and then the ribbing. In the process of removing the fairleads one did not survive and I had to make one from scratch to replace it. That's my little PITA. It's on the port rear platform. So that's where I'm at now.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I've been finishing the job of moving the fairleads outside the splinter shields and am just about done. I had to make one fairlead and did a few extra as there are more to go on the flight deck around the bridge and funnel that are not in the kit. I have all the splinter shielding on and cut down but do not have all the ribbing in place yet. I was doing that yesterday but for some reason it was just not working as it had previously and I said &%$#*))&^%$#$ and gave it a rest. So here are the results so far.
As I was resizing one photo I could see minor imperfections that don't show in regular view unless you look hard but I know they are there now so will have to do something with them. Has to do with the seam of one of the sponsons along the hull, slight gap and some nicks. Oh well one more thing to add to the punch list.
As I was resizing one photo I could see minor imperfections that don't show in regular view unless you look hard but I know they are there now so will have to do something with them. Has to do with the seam of one of the sponsons along the hull, slight gap and some nicks. Oh well one more thing to add to the punch list.
- MM2CVS9
- Posts: 153
- Joined: Wed Oct 01, 2008 10:17 am
Re: WIP - 1/350 USS Lexington (CV-2)
Just curious, are there to be openings in the splinter shields for the hawser to be fed through the fairleads?
The build looks really great. I have the Trumpeter CV-2 X 1/350 kit in the stash to build yet. Am following this build closely. Thanks for posting the pics.
The build looks really great. I have the Trumpeter CV-2 X 1/350 kit in the stash to build yet. Am following this build closely. Thanks for posting the pics.

" 1/700Hasegawa 45
" 1/700Dragon 44
" 1/700Trumpeter 43
" 1/540Revell vintage 62
" 1/350Trumpeter 42
Fair Winds and Following Seas
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Not sure if you can see in the pics but after the shields were done I drilled from the outside in to make the openings. I just looked and the pic of the port rear sponson clearly shows the grey behind the shield through the fairlead.MM2CVS9 wrote:Just curious, are there to be openings in the splinter shields for the hawser to be fed through the fairleads?
The build looks really great. I have the Trumpeter CV-2 X 1/350 kit in the stash to build yet. Am following this build closely. Thanks for posting the pics.
James
- Jon C Ryckert
- Posts: 592
- Joined: Sat Jun 06, 2009 12:40 pm
Re: WIP - 1/350 USS Lexington (CV-2)
Looking good Jim! Glad someone is making progress on thier Lex.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
Hang in there Jon. I've got over two years, heart surgery, marriage, and moving to a new city wrapped up in this one and still quite a lot to go yet but at least now it's moving ahead.Jon C Ryckert wrote:Looking good Jim! Glad someone is making progress on thier Lex.
James
-
Guest
Re: WIP - 1/350 USS Lexington (CV-2)
Great to see you're back in action Jim! Your tenacity astounds me. But if a thing ain't right, it just ain't right and you know it. And you don't want to be living with that, do you!lvsquarerigger wrote:Hang in there Jon. I've got over two years, heart surgery, marriage, and moving to a new city wrapped up in this one and still quite a lot to go yet but at least now it's moving ahead.Jon C Ryckert wrote:Looking good Jim! Glad someone is making progress on thier Lex.
James
There's no doubt you have to be in the long haul with this kit. My build spread over two years but was really 40 days work. And I regard 40 hours as a long time on a model!
Well done, hang on in there, we're all watching you.
- lvsquarerigger
- Posts: 398
- Joined: Tue Feb 17, 2009 12:26 am
- Location: Albuquerque, NM
Re: WIP - 1/350 USS Lexington (CV-2)
I've kind of been on hold waiting for some things to come through and they finally did. I took the HNSA prints down to Kinko's, OK it's now Fedex office so shoot me, and sized them so they match the dimensions of the kit. I used the length of the flight deck as a guide and when they matched I printed out pages 3 thru 10. Now I have actual size prints to compare my model to. I first checked out the bridge structure as I want that finished. To my surprise my guesses as to the thickness of the mast, the actual height of the 8 in director platform and the rest are all dead on so I don't have to change anything as I feared I might, just finish up what I started.
I'm still not happy with how the bracing under the 8" director looks so I'm going to try a totally different approach and make them out of PE flash. I figure if I cut a piece to the height and lenght I want I can then use a razor knife to cut out the shape I want and then do a diagonal cut to make the two matching pieces. At least that's my plan.
And last but not least I ordered the WEM radar PE set. Now it's time to get back to work.
James
I'm still not happy with how the bracing under the 8" director looks so I'm going to try a totally different approach and make them out of PE flash. I figure if I cut a piece to the height and lenght I want I can then use a razor knife to cut out the shape I want and then do a diagonal cut to make the two matching pieces. At least that's my plan.
And last but not least I ordered the WEM radar PE set. Now it's time to get back to work.
James